X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324182102000

Well Details

Well ID: 0324182102000
Loading map...
Location: 00/02-21-032-18W4/0
Location Alias: 00/02-21-32-18 W4M
Location Alias 2: 00/02-21-032-18 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 18
Section: 21
County/Municipality: Starland County
Well Name: TEAC CRAIGML 2-21-32-18
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0334568
License Date: 2005-07-14
License Status: Issued
Spud Date: 2005-07-21
Final Drill Date: 2005-07-22
Well Total Depth: 389.00 m
Surface Hole Latitude: 51.753780
Surface Hole Longitude: -112.495835

For data sources see[1][2]

Well History

Date Event
2005-07-14 Obtained License
2005-07-21 Surface Casing Operation Performed
2005-07-22 Finished Drilling
2005-07-22 Production Casing Operation Performed
2005-07-22 Rig Released
2005-07-22 Well Mode changed to Drilled and Cased
2005-08-04 Well Log Performed
2005-10-18 Perforation Treatment Performed - Jet Perforation
2005-10-18 Well Log Performed
2005-12-07 Perforation Treatment Performed - Fractured
2005-12-14 Well Began Production
2005-12-14 Well Fluid changed to Gas
2005-12-14 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-10-18 Perforation 356.00 357.50 7
2005-10-18 Perforation 185.30 186.30 7
2005-10-18 Perforation 183.00 184.00 7
2005-10-18 Perforation 175.60 176.10 13
2005-10-18 Perforation 172.70 173.70 7
2005-10-18 Perforation 163.20 163.70 13
2005-10-18 Perforation 160.70 161.20 13
2005-10-18 Perforation 153.30 154.30 7
2005-10-18 Perforation 137.80 138.30 13
2005-10-18 Perforation 133.60 134.10 13
2005-10-18 Perforation 130.80 131.30 13
2005-10-18 Perforation 322.80 323.30 13
2005-10-18 Perforation 121.50 122.00 13
2005-10-18 Perforation 114.00 114.50 13
2005-10-18 Perforation 112.20 113.20 7
2005-12-07 Fracture 356.00 357.50 0
2005-12-07 Fracture 322.80 323.30 0
2005-12-07 Fracture 304.40 304.90 0
2005-12-07 Fracture 297.00 298.00 0
2005-12-07 Fracture 206.90 207.90 0
2005-12-07 Fracture 202.20 205.40 0
2005-12-07 Fracture 193.90 194.90 0
2005-10-18 Perforation 304.40 304.90 13
2005-12-07 Fracture 188.50 189.50 0
2005-12-07 Fracture 183.00 186.30 0
2005-12-07 Fracture 175.60 176.10 0
2005-12-07 Fracture 172.70 173.70 0
2005-12-07 Fracture 163.20 163.70 0
2005-12-07 Fracture 160.70 161.20 0
2005-12-07 Fracture 153.30 154.30 0
2005-12-07 Fracture 137.80 138.30 0
2005-12-07 Fracture 133.60 134.10 0
2005-12-07 Fracture 130.80 131.30 0
2005-10-18 Perforation 297.00 298.00 7
2005-12-07 Fracture 121.50 122.00 0
2005-12-07 Fracture 112.20 114.50 0
2005-10-18 Perforation 206.90 207.90 7
2005-10-18 Perforation 204.90 205.40 13
2005-10-18 Perforation 202.20 203.20 7
2005-10-18 Perforation 193.90 194.90 7
2005-10-18 Perforation 188.50 189.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 379 0.0 0.0 0.0
2006 8692 0.0 0.0 0.0
2007 8560 0.0 0.0 0.0
2008 8635 0.0 0.0 0.0
2009 8635 0.0 0.0 0.0
2010 8613 0.0 0.0 0.0
2011 8310 0.0 0.0 0.0
2012 8624 0.0 0.0 0.0
2013 8556 0.0 0.0 0.0
2014 8570 0.0 0.0 0.0
2015 8614 0.0 0.0 0.0
2016 8707 0.0 0.0 0.0
2017 8639 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 2879 0.0 0.0 0.0

For data sources see[5]

References