X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324232909000

Well Details

Well ID: 0324232909000
Loading map...
Location: 00/09-29-032-23W4/0
Location Alias: 00/09-29-32-23 W4M
Location Alias 2: 00/09-29-032-23 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 23
Section: 29
County/Municipality: Kneehill County
Well Name: DOME ET AL TWINING 9-29-32-23
Operator Name: Plains Midstream Canada ULC
License Number: 0118650
License Date: 1985-10-25
License Status: Re-Entered
Spud Date: 1985-11-06
Final Drill Date: 1985-11-17
Well Total Depth: 1645.00 m
Surface Hole Latitude: 51.774881
Surface Hole Longitude: -113.222859

For data sources see[1][2]

Well History

Date Event
1985-10-25 Obtained License
1985-11-07 Surface Casing Operation Performed
1985-11-14 Drill Stem Test Performed
1985-11-17 Finished Drilling
1985-11-17 Well Log Performed
1985-11-19 Drill Stem Test Performed
1985-11-20 Drill Stem Test Performed
1985-11-22 Production Casing Operation Performed
1985-11-22 Rig Released
1985-12-08 Perforation Treatment Performed - Jet Perforation
1985-12-08 Well Log Performed
1985-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-12-10 Plug Back Performed
1985-12-10 Well Log Performed
1985-12-11 Perforation Treatment Performed - Jet Perforation
1985-12-11 Well Log Performed
1985-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-12-13 Plug Back Performed
1985-12-13 Well Log Performed
1985-12-14 Perforation Treatment Performed - Jet Perforation
1986-08-01 Well Mode changed to Drilled and Cased
1987-05-21 Well Began Production
1987-05-21 Well Fluid changed to Crude Oil
1987-05-21 Well Mode changed to Pumping
1987-07-01 Well Fluid changed to Crude Oil
1987-07-01 Well Mode changed to Suspended
1988-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-12-05 Plug Back Performed
1988-12-05 Well Abandoned
1988-12-05 Well Fluid changed to Crude Oil
1988-12-05 Well Log Performed
1988-12-05 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-12-08 Perforation 1584.00 1585.50 13
1985-12-08 Perforation 1588.00 1590.00 13
1985-12-10 Packing Device Capped w/Cement 1574.00 1582.00 0
1985-12-11 Perforation 1550.00 1552.00 13
1985-12-11 Perforation 1553.50 1556.00 13
1985-12-11 Perforation 1557.50 1560.50 13
1985-12-13 Packing Device Capped w/Cement 1538.00 1546.00 0
1985-12-14 Perforation 1384.00 1386.50 13
1988-12-05 Packing Device Capped w/Cement 1367.00 1375.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 216 0.0 0.0 0.0

For data sources see[5]

References