If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0324243412000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.788504,"lon":-113.330805,"icon":""}]} |
| Location: 00/12-34-032-24W4/0 | |
| Location Alias: 00/12-34-32-24 W4M | |
| Location Alias 2: 00/12-34-032-24 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 032 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 34 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER TWINING 12-34-32-24 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0423268 | |
| License Date: 2010-09-07 | |
| License Status: Issued | |
| Spud Date: 2010-11-27 | |
| Final Drill Date: 2010-12-03 | |
| Well Total Depth: 918.00 m | |
| Surface Hole Latitude: 51.788504 | |
| Surface Hole Longitude: -113.330805 |
| Date | Event |
|---|---|
| 2010-09-07 | Obtained License |
| 2010-11-27 | Surface Casing Operation Performed |
| 2010-12-03 | Finished Drilling |
| 2010-12-03 | Well Mode changed to Drilled and Cased |
| 2010-12-04 | Production Casing Operation Performed |
| 2010-12-04 | Rig Released |
| 2010-12-06 | Well Log Performed |
| 2011-01-23 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-06 | Perforation Treatment Performed - Fractured |
| 2011-02-09 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-02-09 | Well Mode changed to Testing |
| 2011-02-19 | Well Began Production |
| 2011-02-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-02-19 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-01-23 | Perforation | 439.50 | 439.80 | 13 |
| 2011-01-23 | Perforation | 300.40 | 300.70 | 13 |
| 2011-01-23 | Perforation | 288.00 | 289.50 | 13 |
| 2011-01-23 | Perforation | 348.40 | 348.70 | 13 |
| 2011-01-23 | Perforation | 406.60 | 407.40 | 13 |
| 2011-01-23 | Perforation | 400.20 | 401.30 | 13 |
| 2011-01-23 | Perforation | 358.50 | 358.80 | 13 |
| 2011-01-23 | Perforation | 466.20 | 466.50 | 13 |
| 2011-01-23 | Perforation | 561.50 | 561.80 | 13 |
| 2011-01-23 | Perforation | 557.60 | 557.90 | 13 |
| 2011-01-23 | Perforation | 549.40 | 549.70 | 13 |
| 2011-01-23 | Perforation | 420.80 | 421.10 | 13 |
| 2011-01-23 | Perforation | 562.80 | 563.10 | 13 |
| 2011-01-23 | Perforation | 826.00 | 827.00 | 13 |
| 2011-01-23 | Perforation | 629.60 | 630.10 | 13 |
| 2011-01-23 | Perforation | 564.20 | 564.50 | 13 |
| 2011-01-23 | Perforation | 511.90 | 512.90 | 13 |
| 2011-01-23 | Perforation | 526.20 | 526.70 | 13 |
| 2011-01-23 | Perforation | 490.90 | 491.20 | 13 |
| 2011-01-23 | Perforation | 502.00 | 502.30 | 13 |
| 2011-01-23 | Perforation | 541.30 | 542.40 | 13 |
| 2011-01-23 | Perforation | 540.20 | 540.70 | 13 |
| 2011-01-23 | Perforation | 418.90 | 419.30 | 13 |
| 2011-01-23 | Perforation | 534.10 | 535.10 | 13 |
| 2011-02-06 | Fracture | 288.00 | 289.50 | 0 |
| 2011-02-06 | Fracture | 557.60 | 564.50 | 0 |
| 2011-02-06 | Fracture | 300.40 | 549.70 | 0 |
| 2011-01-23 | Perforation | 447.10 | 447.40 | 13 |
| 2011-01-23 | Perforation | 460.00 | 461.20 | 13 |
| 2011-01-23 | Perforation | 455.20 | 455.60 | 13 |
| 2011-01-23 | Perforation | 450.30 | 451.60 | 13 |
| 2011-01-23 | Perforation | 412.20 | 412.90 | 13 |
| 2011-01-23 | Perforation | 304.30 | 305.30 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 7582 | 0.0 | 0.0 | 0.0 |
| 2012 | 8679 | 0.0 | 0.0 | 0.0 |
| 2013 | 8697 | 0.0 | 0.0 | 0.0 |
| 2014 | 8699 | 0.0 | 0.0 | 0.0 |
| 2015 | 8754 | 0.0 | 0.0 | 0.0 |
| 2016 | 8776 | 0.0 | 0.0 | 0.0 |
| 2017 | 8748 | 0.0 | 0.0 | 0.0 |
| 2018 | 8736 | 0.0 | 0.0 | 0.0 |
| 2019 | 8697 | 0.0 | 0.0 | 0.0 |
| 2020 | 2152 | 0.0 | 0.0 | 0.0 |
For data sources see[5]