X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325023304002

Well Details

Well ID: 0325023304002
Loading map...
Location: 00/04-33-032-02W5/2
Location Alias: 00/04-33-32-02 W5M
Location Alias 2: 00/04-33-032-02 W5/02
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 02
Section: 33
County/Municipality: Mountain View County
Well Name: TANTALUS GARR 4-33-32-2
Operator Name: Persist Oil And Gas Inc.
License Number: 0114307
License Date: 1985-04-24
License Status: Amended
Spud Date: 1985-06-05
Final Drill Date: 1985-07-14
Well Total Depth: 2805.00 m
Surface Hole Latitude: 51.781174
Surface Hole Longitude: -114.236914

For data sources see[1][2]

Well History

Date Event
1985-04-24 Obtained License
1985-06-08 Surface Casing Operation Performed
1985-07-09 Direction Drilling Operation Performed - Sidetrack Fish
1985-07-14 Finished Drilling
1985-07-14 Well Log Performed
1985-07-14 Well Mode changed to Drilled and Cased
1985-07-15 Well Log Performed
1985-07-17 Production Casing Operation Performed
1985-07-17 Rig Released
1985-08-22 Perforation Treatment Performed - Jet Perforation
1985-08-28 Well Began Production
1985-08-28 Well Fluid changed to Crude Oil
1985-08-28 Well Mode changed to Flowing
1985-08-29 Perforation Treatment Performed - Fractured
1994-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-13 Plug Back Performed
1994-06-13 Well Fluid changed to Crude Oil
1994-06-13 Well Log Performed
1994-06-13 Well Mode changed to Abandoned and Whipstocked
1994-06-20 Well Log Performed
1994-08-28 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-07-09 2654.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-08-22 Perforation 2725.00 2752.00 13
1985-08-29 Fracture 2725.00 2752.00 0
1994-06-13 Packing Device Capped w/Cement 2688.00 2696.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 3407 0.0 0.0 0.0
1986 7885 0.0 0.0 0.0
1987 7604 0.0 0.0 0.0
1988 6975 0.0 0.0 0.0
1989 7653 0.0 0.0 0.0
1993 3630 0.0 0.0 0.0
1994 3104 0.0 0.0 0.0

For data sources see[6]

References