X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325030603002

Well Details

Well ID: 0325030603002
Loading map...
Location: 00/03-06-032-03W5/2
Location Alias: 00/03-06-32-03 W5M
Location Alias 2: 00/03-06-032-03 W5/02
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 06
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARME 3-6-32-3
Operator Name: ExxonMobil Canada Ltd.
License Number: 0019258
License Date: 1960-06-27
License Status: Suspension
Spud Date: 1960-07-04
Final Drill Date: 1960-08-03
Well Total Depth: 2651.80 m
Surface Hole Latitude: 51.709589
Surface Hole Longitude: -114.418013

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-06-27 Obtained License
1960-08-03 Finished Drilling
1960-08-03 Well Mode changed to Drilled and Cased
1960-08-05 Production Casing Operation Performed
1960-08-07 Perforation Treatment Performed - Open-Hole Completion
1977-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-02 Perforation Treatment Performed - Jet Perforation
1977-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-26 Plug Back Performed
2002-03-26 Well Log Performed
2002-03-28 Perforation Treatment Performed - Jet Perforation
2002-03-28 Well Log Performed
2002-04-02 Perforation Treatment Performed - Fractured
2002-07-09 Well Began Production
2002-07-09 Well Fluid changed to Gas
2002-07-09 Well Mode changed to Flowing
2012-04-01 Well Fluid changed to Gas
2012-04-01 Well Mode changed to Pumping
2013-04-01 Well Fluid changed to Gas
2013-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-08-07 Open Hole/Barefoot Completion 2634.40 2651.80 0
1977-09-28 Acid Treatment 2634.40 2651.80 0
1977-11-02 Perforation 2625.20 2632.90 7
1977-11-04 Acid Treatment 2625.20 2632.90 0
2002-03-26 Packing Device Capped w/Cement 2596.00 2606.00 0
2002-03-28 Perforation 2572.50 2575.00 20
2002-04-02 Fracture 2572.50 2575.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 3956 0.0 0.0 0.0
2003 7624 0.0 0.0 0.0
2004 8151 0.0 0.0 0.0
2005 4237 0.0 0.0 0.0
2006 3597 0.0 0.0 0.0
2007 3561 0.0 0.0 0.0
2008 7208 0.0 0.0 0.0
2009 5481 0.0 0.0 0.0
2010 4883 0.0 0.0 0.0
2011 790 0.0 0.0 0.0

For data sources see[5]

References