If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0325030605000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.712522,"lon":-114.422735,"icon":""}]} |
| Location: 00/05-06-032-03W5/0 | |
| Location Alias: 00/05-06-32-03 W5M | |
| Location Alias 2: 00/05-06-032-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 032 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 06 | |
| County/Municipality: Mountain View County | |
| Well Name: MOBIL UNIT HARME 5-6-32-3 | |
| Operator Name: ExxonMobil Canada Ltd. | |
| License Number: 0019719 | |
| License Date: 1960-09-19 | |
| License Status: Abandoned | |
| Spud Date: 1960-09-20 | |
| Final Drill Date: 1960-10-17 | |
| Well Total Depth: 2651.80 m | |
| Surface Hole Latitude: 51.712522 | |
| Surface Hole Longitude: -114.422735 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1960-09-19 | Obtained License |
| 1960-10-17 | Finished Drilling |
| 1960-10-17 | Well Mode changed to Drilled and Cased |
| 1960-10-19 | Production Casing Operation Performed |
| 1960-10-22 | Perforation Treatment Performed - Open-Hole Completion |
| 1960-10-25 | Well Began Production |
| 1960-10-25 | Well Fluid changed to Crude Oil |
| 1960-10-25 | Well Mode changed to Flowing |
| 1961-12-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1972-08-11 | Perforation Treatment Performed - Jet Perforation |
| 1972-10-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1972-11-09 | Well Began Injection |
| 1972-11-09 | Well Fluid changed to Water |
| 1972-11-09 | Well Type changed to Injection |
| 2003-12-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2003-12-10 | Plug Back Performed |
| 2003-12-10 | Well Fluid changed to Water |
| 2003-12-10 | Well Mode changed to Abandoned Zone |
| 2003-12-10 | Well Type changed to Injection |
| 2003-12-11 | Perforation Treatment Performed - Jet Perforation |
| 2003-12-12 | Perforation Treatment Performed - Remedial Casing |
| 2003-12-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2003-12-15 | Perforation Treatment Performed - Bridge Plug No Cement Required |
| 2003-12-15 | Perforation Treatment Performed - Jet Perforation |
| 2003-12-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-09-30 | Well Abandoned |
| 2004-09-30 | Well Fluid changed to Water |
| 2004-09-30 | Well Mode changed to Abandoned |
| 2004-09-30 | Well Type changed to Injection |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1960-10-22 | Open Hole/Barefoot Completion | 2631.60 | 2651.80 | 0 |
| 2003-12-15 | Perforation | 556.00 | 558.00 | 17 |
| 2003-12-16 | Packing Device Capped w/Cement | 533.00 | 548.00 | 0 |
| 1961-12-01 | Acid Treatment | 2631.60 | 2651.80 | 0 |
| 1972-08-11 | Perforation | 2623.10 | 2631.60 | 13 |
| 1972-10-16 | Acid Treatment | 2623.10 | 2651.80 | 0 |
| 2003-12-10 | Packing Device Capped w/Cement | 2608.00 | 2615.00 | 0 |
| 2003-12-11 | Perforation | 1665.20 | 1667.20 | 17 |
| 2003-12-12 | Remedial Casing Cementing | 1665.20 | 1667.20 | 0 |
| 2003-12-15 | Packing Device Capped w/Cement | 1648.00 | 1655.00 | 0 |
| 2003-12-15 | Bridge Plug, No Cement | 563.00 | 563.10 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1971 | 2555 | 0.0 | 0.0 | 0.0 |
| 1972 | 0 | 0.0 | 0.0 | 0.0 |
| 1973 | 0 | 0.0 | 0.0 | 0.0 |
| 1974 | 0 | 0.0 | 0.0 | 0.0 |
| 1975 | 0 | 0.0 | 0.0 | 0.0 |
| 1976 | 0 | 0.0 | 0.0 | 0.0 |
| 1977 | 0 | 0.0 | 0.0 | 0.0 |
| 1978 | 0 | 0.0 | 0.0 | 0.0 |
| 1979 | 0 | 0.0 | 0.0 | 0.0 |
| 1980 | 0 | 0.0 | 0.0 | 0.0 |
| 1981 | 0 | 0.0 | 0.0 | 0.0 |
| 1982 | 0 | 0.0 | 0.0 | 0.0 |
| 1983 | 0 | 0.0 | 0.0 | 0.0 |
| 1984 | 0 | 0.0 | 0.0 | 0.0 |
| 1985 | 0 | 0.0 | 0.0 | 0.0 |
| 1986 | 0 | 0.0 | 0.0 | 0.0 |
| 1993 | 0 | 0.0 | 0.0 | 0.0 |
| 1994 | 0 | 0.0 | 0.0 | 0.0 |
| 1995 | 0 | 0.0 | 0.0 | 0.0 |
| 1996 | 0 | 0.0 | 0.0 | 0.0 |
| 1997 | 0 | 0.0 | 0.0 | 0.0 |
| 1998 | 0 | 0.0 | 0.0 | 0.0 |
| 1999 | 0 | 0.0 | 0.0 | 0.0 |
| 2000 | 0 | 0.0 | 0.0 | 0.0 |
| 2002 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]