0325030607000

Well Details

Well ID: 0325030607000
Loading map...
Location: 00/07-06-032-03W5/0
Location Alias: 00/07-06-32-03 W5M
Location Alias 2: 00/07-06-032-03 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 06
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARME 7-6-32-3
Operator Name: ExxonMobil Canada Ltd.
License Number: 0018884
License Date: 1960-03-21
License Status: Abandoned
Spud Date: 1960-04-28
Final Drill Date: 1960-06-04
Well Total Depth: 2644.10 m
Surface Hole Latitude: 51.713207
Surface Hole Longitude: -114.412195

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-03-21 Obtained License
1960-06-04 Finished Drilling
1960-06-04 Well Mode changed to Drilled and Cased
1960-06-06 Production Casing Operation Performed
1960-06-12 Perforation Treatment Performed - Open-Hole Completion
1960-06-20 Well Began Production
1960-06-20 Well Fluid changed to Crude Oil
1960-06-20 Well Mode changed to Flowing
1965-02-01 Perforation Treatment Performed - Selective Bullet Perforations
1977-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-25 Perforation Treatment Performed - Jet Perforation
1977-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-28 Well Fluid changed to Crude Oil
1977-10-28 Well Mode changed to Gas Lift
2011-09-01 Well Fluid changed to Crude Oil
2011-09-01 Well Mode changed to Suspended
2015-02-02 Perforation Treatment Performed - Jet Perforation
2015-02-02 Perforation Treatment Performed - Remedial Casing
2015-02-03 Perforation Treatment Performed - Cement Plug
2015-02-03 Plug Back Performed
2015-02-03 Well Fluid changed to Crude Oil
2015-02-03 Well Mode changed to Abandoned Zone
2015-02-04 Perforation Treatment Performed - Jet Perforation
2015-02-05 Perforation Treatment Performed - Cement Plug
2015-02-05 Perforation Treatment Performed - Remedial Casing
2015-02-06 Perforation Treatment Performed - Jet Perforation
2015-02-07 Perforation Treatment Performed - Cement Plug
2015-02-07 Perforation Treatment Performed - Remedial Casing
2016-03-10 Well Abandoned
2016-03-10 Well Fluid changed to Crude Oil
2016-03-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-06-12 Open Hole/Barefoot Completion 2631.90 2644.10 0
1965-02-01 Selective Bullet Perforations 2623.70 2624.90 0
1965-02-01 Selective Bullet Perforations 2625.90 2626.80 0
1965-02-01 Selective Bullet Perforations 2628.30 2629.20 0
1965-02-01 Selective Bullet Perforations 2630.70 2630.70 0
1977-09-28 Acid Treatment 2631.90 2644.10 0
1977-10-25 Perforation 2629.20 2631.60 7
1977-10-27 Acid Treatment 2629.20 2631.60 0
2015-02-02 Perforation 2054.00 2055.00 17
2015-02-02 Remedial Casing Cementing 2054.00 2055.00 0
2015-02-03 Cement Plug 1680.00 2590.00 0
1965-02-01 Selective Bullet Perforations 2604.20 2605.40 0
2015-02-04 Perforation 1650.00 1651.00 17
2015-02-04 Perforation 1384.40 1385.40 17
2015-02-04 Perforation 816.00 817.00 17
2015-02-04 Perforation 719.30 720.30 17
2015-02-04 Perforation 599.00 600.00 17
2015-02-05 Remedial Casing Cementing 599.00 1651.00 0
2015-02-05 Cement Plug 592.40 1680.00 0
2015-02-06 Perforation 498.00 499.00 17
2015-02-06 Perforation 451.00 452.00 17
2015-02-06 Perforation 390.00 391.00 17
1965-02-01 Selective Bullet Perforations 2606.60 2607.60 0
2015-02-06 Perforation 359.00 360.00 17
2015-02-06 Perforation 302.00 303.00 17
2015-02-06 Perforation 207.00 208.00 17
2015-02-06 Perforation 197.00 198.00 17
2015-02-07 Remedial Casing Cementing 197.00 499.00 0
2015-02-07 Cement Plug 192.40 592.00 0
2015-02-07 Cement Plug 172.00 192.00 0
1965-02-01 Selective Bullet Perforations 2610.60 2611.20 0
1965-02-01 Selective Bullet Perforations 2612.70 2614.00 0
1965-02-01 Selective Bullet Perforations 2614.90 2615.80 0
1965-02-01 Selective Bullet Perforations 2616.70 2617.90 0
1965-02-01 Selective Bullet Perforations 2618.50 2620.10 0
1965-02-01 Selective Bullet Perforations 2621.00 2622.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1970 168 0.0 0.0 0.0
1974 7380 0.0 0.0 0.0
1975 6120 0.0 0.0 0.0
1976 4839 0.0 0.0 0.0
1977 7085 0.0 0.0 0.0
1978 5428 0.0 0.0 0.0
1979 8333 0.0 0.0 0.0
1980 8568 0.0 0.0 0.0
1981 7871 0.0 0.0 0.0
1982 7864 0.0 0.0 0.0
1983 8218 0.0 0.0 0.0
1984 8332 0.0 0.0 0.0
1985 8144 0.0 0.0 0.0
1986 7187 0.0 0.0 0.0
1987 7208 0.0 0.0 0.0
1988 7878 0.0 0.0 0.0
1989 7349 0.0 0.0 0.0
1990 7965 0.0 0.0 0.0
1991 7610 0.0 0.0 0.0
1992 7485 0.0 0.0 0.0
1993 7252 0.0 0.0 0.0
1994 7761 0.0 0.0 0.0
1995 8066 0.0 0.0 0.0
1996 8014 0.0 0.0 0.0
1997 8453 0.0 0.0 0.0
1998 7771 0.0 0.0 0.0
1999 7895 0.0 0.0 0.0
2000 8504 0.0 0.0 0.0
2001 8016 0.0 0.0 0.0
2002 7683 0.0 0.0 0.0
2003 8231 0.0 0.0 0.0
2004 1890 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-09 No Incident Encountered 0.00 0.00

For data sources see[6]