X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325031010000

Well Details

Well ID: 0325031010000
Loading map...
Location: 00/10-10-032-03W5/0
Location Alias: 00/10-10-32-03 W5M
Location Alias 2: 00/10-10-032-03 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 10
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARME 10-10-32-3
Operator Name: ExxonMobil Canada Ltd.
License Number: 0024108
License Date: 1963-05-07
License Status: Issued
Spud Date: 1963-05-08
Final Drill Date: 1963-06-05
Well Total Depth: 2517.00 m
Surface Hole Latitude: 51.731270
Surface Hole Longitude: -114.341305

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-05-07 Obtained License
1963-06-05 Finished Drilling
1963-06-05 Well Mode changed to Drilled and Cased
1963-06-07 Production Casing Operation Performed
1963-06-11 Perforation Treatment Performed - Selective Jet Perforations
1963-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-29 Well Began Production
1964-03-29 Well Fluid changed to Gas
1964-03-29 Well Mode changed to Flowing
1995-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-04-01 Well Fluid changed to Gas
2009-04-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-06-11 Selective Jet Perforations 2472.20 2472.50 0
1963-06-14 Acid Treatment 2472.20 2499.40 0
1963-06-26 Acid Treatment 2472.20 2499.40 0
1995-06-13 Acid Treatment 2472.20 2499.40 0
1963-06-11 Selective Jet Perforations 2474.70 2476.50 0
1963-06-11 Selective Jet Perforations 2477.40 2478.90 0
1963-06-11 Selective Jet Perforations 2479.90 2482.00 0
1963-06-11 Selective Jet Perforations 2482.90 2484.70 0
1963-06-11 Selective Jet Perforations 2485.90 2487.80 0
1963-06-11 Selective Jet Perforations 2488.70 2489.60 0
1963-06-11 Selective Jet Perforations 2491.40 2497.20 0
1963-06-11 Selective Jet Perforations 2498.80 2499.40 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1457 0.0 0.0 0.0
1969 7689 0.0 0.0 0.0
1970 7821 0.0 0.0 0.0
1971 8405 0.0 0.0 0.0
1972 7836 0.0 0.0 0.0
1973 5512 0.0 0.0 0.0
1974 7915 0.0 0.0 0.0
1975 8452 0.0 0.0 0.0
1976 7742 0.0 0.0 0.0
1977 8191 0.0 0.0 0.0
1978 8021 0.0 0.0 0.0
1979 7817 0.0 0.0 0.0
1980 7946 0.0 0.0 0.0
1981 8003 0.0 0.0 0.0
1982 3998 0.0 0.0 0.0
1983 1601 0.0 0.0 0.0
1984 1798 0.0 0.0 0.0
1985 4209 0.0 0.0 0.0
1986 3819 0.0 0.0 0.0
1987 3847 0.0 0.0 0.0
1988 7338 0.0 0.0 0.0
1989 7797 0.0 0.0 0.0
1990 7100 0.0 0.0 0.0
1991 8316 0.0 0.0 0.0
1992 7509 0.0 0.0 0.0
1993 8422 0.0 0.0 0.0
1994 8168 0.0 0.0 0.0
1995 8468 0.0 0.0 0.0
1996 7885 0.0 0.0 0.0
1997 8751 0.0 0.0 0.0
1998 8625 0.0 0.0 0.0
1999 8108 0.0 0.0 0.0
2000 8585 0.0 0.0 0.0
2001 8698 0.0 0.0 0.0
2002 8306 0.0 0.0 0.0
2003 8394 0.0 0.0 0.0
2004 8703 0.0 0.0 0.0
2005 8185 0.0 0.0 0.0
2006 7852 0.0 0.0 0.0
2007 7962 0.0 0.0 0.0
2008 5820 0.0 0.0 0.0
2009 4183 0.0 0.0 0.0
2010 255 0.0 0.0 0.0
2011 400 0.0 0.0 0.0
2012 523 0.0 0.0 0.0
2013 1189 0.0 0.0 0.0
2014 2180 0.0 0.0 0.0
2015 435 0.0 0.0 0.0
2016 158 0.0 0.0 0.0
2017 285 0.0 0.0 0.0
2018 697 0.0 0.0 0.0
2019 3054 0.0 0.0 0.0
2020 273 0.0 0.0 0.0

For data sources see[5]

References