If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0325031608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.740609,"lon":-114.380769,"icon":""}]} |
Location: 00/08-16-032-03W5/0 | |
Location Alias: 00/08-16-32-03 W5M | |
Location Alias 2: 00/08-16-032-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 5 | |
Range: 03 | |
Section: 16 | |
County/Municipality: Mountain View County | |
Well Name: EMCL HZ HARME 8-16-32-3 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0465655 | |
License Date: 2014-03-13 | |
License Status: Issued | |
Spud Date: 2014-07-06 | |
Final Drill Date: 2014-07-14 | |
Well Total Depth: 3530.30 m | |
Surface Hole Latitude: 51.740609 | |
Surface Hole Longitude: -114.380769 |
Date | Event |
---|---|
2014-03-13 | Obtained License |
2014-07-07 | Surface Casing Operation Performed |
2014-07-08 | Direction Drilling Operation Performed - Deviate |
2014-07-10 | Direction Drilling Operation Performed - Horizontal |
2014-07-11 | Well Log Performed |
2014-07-14 | Finished Drilling |
2014-07-14 | Well Log Performed |
2014-07-14 | Well Mode changed to Drilled and Cased |
2014-07-15 | Perforation Treatment Performed - Open-Hole Completion |
2014-07-15 | Production Casing Operation Performed |
2014-07-15 | Rig Released |
2014-08-01 | Well Began Production |
2014-08-01 | Well Fluid changed to Crude Oil |
2014-08-01 | Well Mode changed to Flowing |
2014-08-18 | Well Log Performed |
2014-08-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-11-02 | Well Fluid changed to Crude Oil |
2014-11-02 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-07-06 | Nabors Drilling Limited | 30 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-07-08 | 727.80 | Deviate (5 - 79 degrees) |
2014-07-10 | 2100.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-07-15 | Open Hole/Barefoot Completion | 3525.00 | 3530.30 | 0 |
2014-08-26 | Multi-Stage Fracture | 2805.60 | 2805.70 | 0 |
2014-08-26 | Multi-Stage Fracture | 2632.60 | 2632.70 | 0 |
2014-08-26 | Multi-Stage Fracture | 2546.40 | 2546.50 | 0 |
2014-08-26 | Multi-Stage Fracture | 2468.40 | 2468.50 | 0 |
2014-08-26 | Multi-Stage Fracture | 2390.40 | 2390.50 | 0 |
2014-08-26 | Multi-Stage Fracture | 2299.40 | 2299.50 | 0 |
2014-08-26 | Multi-Stage Fracture | 2206.50 | 2206.60 | 0 |
2014-08-26 | Multi-Stage Fracture | 3485.80 | 3485.90 | 0 |
2014-08-26 | Multi-Stage Fracture | 3391.90 | 3392.00 | 0 |
2014-08-26 | Multi-Stage Fracture | 3299.00 | 3299.10 | 0 |
2014-08-26 | Multi-Stage Fracture | 3193.40 | 3193.50 | 0 |
2014-08-26 | Multi-Stage Fracture | 3114.90 | 3115.00 | 0 |
2014-08-26 | Multi-Stage Fracture | 3025.10 | 3025.20 | 0 |
2014-08-26 | Multi-Stage Fracture | 2948.10 | 2948.20 | 0 |
2014-08-26 | Multi-Stage Fracture | 2869.90 | 2870.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-08-26 | 2014-08-26 | 1,971 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water (Including Mix Water Supplied by Client)* | Not Available | 100 | 86.4489 | N/A | |||
Slickwater. N002 | Schlumberger | Crystalline silica | 14808-60-7 | 100 | 4.7849 | N/A | ||
Slickwater. N002 | Schlumberger | Energizing Fluid | 2-methyl-2h-isothiazol-3-one | 2682-20-4 | 100 | 0 | N/A | |
5-chloro-2-methyl-2h-isothiazolol-3-one | 26172-55-4 | 100 | 0.0001 | N/A | ||||
Acetic acid | 64-19-7 | 100 | 0 | N/A | ||||
Acetic acid. potassium salt | 127-08-2 | 100 | 0 | N/A | ||||
Acrylamide. 2-acrylamido-2-methylpropanesulfonic acid. sodiu |
38193-60-1 | 100 | 0.0082 | N/A | ||||
Alcohol. C11-14. ethoxylated | 78330-21-9 | 100 | 0.0007 | N/A | ||||
Alcohols. C9-11-iso-. C10-rich | 68526-85-2 | 100 | 0.0007 | N/A | ||||
Cholinium chloride | 67-48-1 | 100 | 0.1401 | N/A | ||||
Cristobalite | 14464-46-1 | 100 | 0 | N/A | ||||
Diatomaceous earth. calcined | 91053-39-3 | 100 | 0.0015 | N/A | ||||
Dicoco dimethyl quaternary ammonium chloride | 61789-77-3 | 100 | 0.0004 | N/A | ||||
Distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0074 | N/A | ||||
Magnesium chloride | 7786-30-3 | 100 | 0.0001 | N/A | ||||
Magnesium nitrate | 10377-60-3 | 100 | 0.0003 | N/A | ||||
Nitrogen. liquid form | 7727-37-9 | 100 | 3.8061 | N/A | ||||
Polyethylene glycol monohexyl ether | 31726-34-8 | 100 | 0.0102 | N/A | ||||
Propan-2-ol | 67-63-0 | 100 | 0 | N/A | ||||
Sodium chloride | 7647-14-5 | 100 | 0.0036 | N/A | ||||
Sorbitan monooleate. ethoxylated | 9005-65-6 | 100 | 0.0003 | N/A | ||||
Sorbitan. (Z)-9-octadecenoate (2:3) | 8007-43-0 | 100 | 0.0005 | N/A | ||||
Tetrasodium ethylenediaminetetraacetate | 64-02-8 | 100 | 0 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-08-07 | 2014-08-27 | Central Water Distribution Facility | 3235 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 1521 | 0.0 | 0.0 | 0.0 |
2015 | 7107 | 0.0 | 0.0 | 0.0 |
2016 | 6682 | 0.0 | 0.0 | 0.0 |
2017 | 8554 | 0.0 | 0.0 | 0.0 |
2018 | 8061 | 0.0 | 0.0 | 0.0 |
2019 | 7837 | 0.0 | 0.0 | 0.0 |
2020 | 1842 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-07-15 | No Incident Encountered | 0.00 | 0.00 |
2014-10-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]