X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325033004050

Well Details

Well ID: 0325033004050
Loading map...
Location: 05/04-30-032-03W5/0
Location Alias: 05/04-30-32-03 W5M
Location Alias 2: 05/04-30-032-03 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 30
County/Municipality: Mountain View County
Well Name: BACCALIEU 105 HZ HARME 4-30-32-3
Operator Name: Baccalieu Energy Inc.
License Number: 0449136
License Date: 2012-10-12
License Status: Issued
Spud Date: 2012-12-09
Final Drill Date: 2013-01-06
Well Total Depth: 3665.00 m
Surface Hole Latitude: 51.781063
Surface Hole Longitude: -114.417594

For data sources see[1][2]

Well History

Date Event
2012-10-12 Obtained License
2012-12-10 Surface Casing Operation Performed
2012-12-12 Direction Drilling Operation Performed - Deviate
2012-12-14 Direction Drilling Operation Performed - Horizontal
2012-12-15 Intermediate Casing Operation Performed
2012-12-15 Well Log Performed
2013-01-06 Finished Drilling
2013-01-06 Well Mode changed to Drilled and Cased
2013-01-08 Perforation Treatment Performed - Open-Hole Completion
2013-01-09 Liner Casing Operation Performed
2013-01-09 Rig Released
2013-01-22 Perforation Treatment Performed - Multi-Stage Fracture
2013-01-22 Well Began Production
2013-01-22 Well Fluid changed to Crude Oil
2013-01-22 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-12-09 Ensign Drilling Inc. 544 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-12-12 1734.50 Deviate (5 - 79 degrees)
2012-12-14 2124.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-01-08 Open Hole/Barefoot Completion 3660.00 3665.00 0
2013-01-22 Multi-Stage Fracture 3024.10 3024.20 0
2013-01-22 Multi-Stage Fracture 2951.80 2951.90 0
2013-01-22 Multi-Stage Fracture 2879.30 2879.40 0
2013-01-22 Multi-Stage Fracture 2793.40 2793.50 0
2013-01-22 Multi-Stage Fracture 2720.80 2720.90 0
2013-01-22 Multi-Stage Fracture 2648.40 2648.50 0
2013-01-22 Multi-Stage Fracture 2562.70 2562.80 0
2013-01-22 Multi-Stage Fracture 2490.30 2490.40 0
2013-01-22 Multi-Stage Fracture 2417.80 2417.90 0
2013-01-22 Multi-Stage Fracture 2345.30 2345.40 0
2013-01-22 Multi-Stage Fracture 3619.80 3619.90 0
2013-01-22 Multi-Stage Fracture 2259.40 2259.50 0
2013-01-22 Multi-Stage Fracture 2200.30 2200.40 0
2013-01-22 Multi-Stage Fracture 3559.00 3559.10 0
2013-01-22 Multi-Stage Fracture 3486.60 3486.70 0
2013-01-22 Multi-Stage Fracture 3414.60 3414.70 0
2013-01-22 Multi-Stage Fracture 3328.90 3329.00 0
2013-01-22 Multi-Stage Fracture 3256.70 3256.80 0
2013-01-22 Multi-Stage Fracture 3183.70 3183.80 0
2013-01-22 Multi-Stage Fracture 3109.90 3110.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-01-22 2013-01-22 2,021 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 No specific ingredients Not Available 100 80.7207 N/A
Sand (30/50) Canyon Aluminum Oxide 1344-28-1 100 13.9113 N/A
Crystalline silica. quartz 14808-60-7 100 13.9113 N/A
Iron Oxide 1309-37-1 100 13.9114 N/A
Titanium Oxide 13463-67-7 100 13.9111 N/A
Sand (40/70) Canyon Aluminum Oxide 1344-28-1 100 0.2782 N/A
Crystalline silica. quartz 14808-60-7 100 0.2782 N/A
Iron Oxide 1309-37-1 100 0.2782 N/A
Titanium Oxide 13463-67-7 100 0.2777 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0169 N/A
Water 7732-18-5 100 0.0169 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.1784 N/A
Water 7732-18-5 100 0.1784 N/A
Nitrogen Gas Canyon Energizing Fluid Nitrogen 7727-37-9 100 4.7242 N/A
Non-hazardous base ingredient(s) Not Available 100 4.724 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Gelling Agent Ammonium Chloride 12125-02-9 100 0.0912 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0911 N/A
Water 7732-18-5 100 0.0911 N/A
CAN-2410 Demulsifier Canyon Surfactant Methyl Alcohol 67-56-1 100 0.0788 N/A
Water 7732-18-5 100 0.0788 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-01-21 2013-01-21 Surface Water - River 1700
2013-01-21 2013-01-21 Recycled Fracturing Water (treated at well site) 312
2013-01-21 2013-01-21 Recycled Fracturing Water (treated at well site) 311

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 7369 0.0 0.0 0.0
2014 8519 0.0 0.0 0.0
2015 8003 0.0 0.0 0.0
2016 8771 0.0 0.0 0.0
2017 8595 0.0 0.0 0.0
2018 7967 0.0 0.0 0.0
2019 8424 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-09 No Incident Encountered 0.00 0.00
2013-01-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References