X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325040507002

Well Details

Well ID: 0325040507002
Loading map...
Location: 00/07-05-032-04W5/2
Location Alias: 00/07-05-32-04 W5M
Location Alias 2: 00/07-05-032-04 W5/02
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 05
County/Municipality: Mountain View County
Well Name: CDN-SUP UNIT HARM 7-5-32-4
Operator Name: Bonavista Energy Corporation
License Number: 0101350
License Date: 1983-05-16
License Status: Issued
Spud Date: 1983-06-18
Final Drill Date: 1983-07-08
Well Total Depth: 2816.00 m
Surface Hole Latitude: 51.713243
Surface Hole Longitude: -114.530192

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-05-16 Obtained License
1983-07-08 Finished Drilling
1983-07-08 Well Mode changed to Drilled and Cased
1983-07-09 Well Log Performed
1983-07-11 Production Casing Operation Performed
1983-08-24 Perforation Treatment Performed - Cement Squeeze
1983-08-24 Perforation Treatment Performed - Jet Perforation
1983-08-25 Perforation Treatment Performed - Jet Perforation
1983-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-26 Perforation Treatment Performed - Fractured
1990-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-12 Perforation Treatment Performed - Jet Perforation
2009-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-18 Perforation Treatment Performed - Jet Perforation
2009-10-18 Plug Back Performed
2009-10-19 Well Log Performed
2009-10-23 Well Log Performed
2009-10-26 Perforation Treatment Performed - Fractured
2009-12-10 Well Began Production
2009-12-10 Well Fluid changed to Gas
2009-12-10 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-08-24 Perforation 2775.00 2777.00 13
2009-10-26 Fracture 2710.00 2712.00 0
1983-08-24 Cement Squeeze 2775.00 2777.00 0
1983-08-25 Perforation 2758.00 2772.00 0
1983-08-26 Acid Treatment 2758.00 2772.00 0
1983-08-26 Fracture 2758.00 2772.00 0
1990-02-12 Perforation 2745.50 2753.00 13
1990-02-12 Acid Treatment 2745.50 2753.00 0
2009-10-18 Packing Device Capped w/Cement 2732.00 2740.00 0
2009-10-18 Perforation 2710.00 2712.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 744 0.0 0.0 0.0
2010 8739 0.0 0.0 0.0
2011 8351 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8664 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8195 0.0 0.0 0.0
2016 8651 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8243 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References