X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325042011000

Well Details

Well ID: 0325042011000
Loading map...
Location: 00/11-20-032-04W5/0
Location Alias: 00/11-20-32-04 W5M
Location Alias 2: 00/11-20-032-04 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 20
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARM 11-20-32-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0013198
License Date: 1957-03-13
License Status: Suspension
Spud Date: 1957-03-19
Final Drill Date: 1957-04-21
Well Total Depth: 2784.30 m
Surface Hole Latitude: 51.760386
Surface Hole Longitude: -114.536007

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-03-13 Obtained License
1957-04-21 Finished Drilling
1957-04-21 Well Mode changed to Drilled and Cased
1957-04-22 Production Casing Operation Performed
1957-04-24 Perforation Treatment Performed - Jet Perforation
1957-04-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-04-25 Perforation Treatment Performed - Acid Wash - No Pressure
1957-04-30 Well Began Production
1957-04-30 Well Fluid changed to Crude Oil
1957-04-30 Well Mode changed to Flowing
1958-12-19 Perforation Treatment Performed - Visqueeze
1958-12-22 Perforation Treatment Performed - Jet Perforation
1959-01-02 Perforation Treatment Performed - Jet Perforation
1959-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-06-06 Well Fluid changed to Crude Oil
1968-06-06 Well Mode changed to Suspended
1978-08-26 Well Fluid changed to Crude Oil
1978-08-26 Well Mode changed to Flowing
1978-11-11 Perforation Treatment Performed - Cement Squeeze
1978-11-14 Perforation Treatment Performed - Jet Perforation
1978-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-22 Perforation Treatment Performed - Cement Squeeze
1978-11-28 Perforation Treatment Performed - Jet Perforation
1978-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-02 Well Fluid changed to Crude Oil
1980-04-02 Well Mode changed to Pumping
1981-12-31 Well Fluid changed to Crude Oil
1981-12-31 Well Mode changed to Suspended
1990-05-25 Perforation Treatment Performed - Jet Perforation
1990-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-27 Well Fluid changed to Crude Oil
1990-05-27 Well Mode changed to Flowing
1992-03-01 Well Fluid changed to Crude Oil
1992-03-01 Well Mode changed to Suspended
1993-09-17 Well Fluid changed to Crude Oil
1993-09-17 Well Mode changed to Flowing
1995-08-01 Well Fluid changed to Crude Oil
1995-08-01 Well Mode changed to Suspended
1999-03-17 Well Fluid changed to Crude Oil
1999-03-17 Well Mode changed to Pumping
2014-11-01 Well Fluid changed to Crude Oil
2014-11-01 Well Mode changed to Suspended
2014-12-01 Well Fluid changed to Crude Oil
2014-12-01 Well Mode changed to Pumping
2019-03-01 Well Fluid changed to Crude Oil
2019-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-04-24 Perforation 2758.40 2764.50 13
1978-11-14 Perforation 2769.40 2771.20 6
1978-11-15 Acid Treatment 2769.40 2771.20 0
1978-11-22 Cement Squeeze 2769.40 2771.20 0
1978-11-28 Perforation 2764.50 2767.00 6
1978-11-29 Acid Treatment 2764.50 2767.00 0
1978-11-30 Acid Treatment 2764.50 2767.00 0
1990-05-25 Perforation 2742.30 2745.00 13
1990-05-25 Perforation 2747.80 2754.80 13
1990-05-26 Acid Treatment 2742.30 2754.80 0
1957-04-25 Acid Wash 2758.40 2764.50 0
1957-04-25 Acid Treatment 2758.40 2764.50 0
1958-12-19 Visqueeze 2758.40 2764.50 0
1958-12-22 Perforation 2755.40 2760.30 13
1959-01-02 Perforation 2755.40 2760.30 13
1959-01-12 Acid Treatment 2755.40 2760.30 0
1959-06-09 Acid Treatment 2755.40 2760.30 0
1978-11-11 Cement Squeeze 2755.40 2764.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3177 0.0 0.0 0.0
1968 1026 0.0 0.0 0.0
1971 248 0.0 0.0 0.0
1978 132 0.0 0.0 0.0
1980 4682 0.0 0.0 0.0
1981 246 0.0 0.0 0.0
1990 37 0.0 0.0 0.0
1993 2568 0.0 0.0 0.0
1994 7249 0.0 0.0 0.0
1995 920 0.0 0.0 0.0
1999 5352 0.0 0.0 0.0
2000 8003 0.0 0.0 0.0
2001 8720 0.0 0.0 0.0
2002 7210 0.0 0.0 0.0
2003 8343 0.0 0.0 0.0
2004 8582 0.0 0.0 0.0
2005 8225 0.0 0.0 0.0
2006 8516 0.0 0.0 0.0
2007 5931 0.0 0.0 0.0
2008 3229 0.0 0.0 0.0
2009 1664 0.0 0.0 0.0
2010 8667 0.0 0.0 0.0
2011 4856 0.0 0.0 0.0
2012 2660 0.0 0.0 0.0
2014 570 0.0 0.0 0.0
2015 8023 0.0 0.0 0.0
2016 8276 0.0 0.0 0.0
2017 5095 0.0 0.0 0.0

For data sources see[5]

References