X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325103612002

Well Details

Well ID: 0325103612002
Loading map...
Location: 00/12-36-032-10W5/2
Location Alias: 00/12-36-32-10 W5M
Location Alias 2: 00/12-36-032-10 W5/02
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 10
Section: 36
County/Municipality: Clearwater County
Well Name: SHELL 1 LIMESTONE 12-36-32-10
Operator Name: Shell Canada Limited
License Number: 0056186
License Date: 1975-12-11
License Status: Issued
Spud Date: 1975-12-16
Final Drill Date: 1976-04-07
Well Total Depth: 4282.40 m
Surface Hole Latitude: 51.784608
Surface Hole Longitude: -115.291510

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-12-11 Obtained License
1976-01-13 Well Log Performed
1976-02-28 Well Log Performed
1976-03-03 Liner Casing Operation Performed
1976-04-07 Finished Drilling
1976-04-07 Well Log Performed
1976-04-23 Perforation Treatment Performed - Jet Perforation
1976-04-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-05-18 Perforation Treatment Performed - Cement Squeeze
1976-05-21 Perforation Treatment Performed - Jet Perforation
1976-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-05-22 Perforation Treatment Performed - Jet Perforation
1976-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-26 Perforation Treatment Performed - Cement Squeeze
1976-06-29 Perforation Treatment Performed - Jet Perforation
1976-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-30 Perforation Treatment Performed - Jet Perforation
1976-07-11 Perforation Treatment Performed - Cement Squeeze
1976-07-11 Perforation Treatment Performed - Jet Perforation
1976-07-17 Perforation Treatment Performed - Jet Perforation
1976-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-07-19 Perforation Treatment Performed - Jet Perforation
1976-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-07-28 Perforation Treatment Performed - Jet Perforation
1976-07-29 Perforation Treatment Performed - Jet Perforation
1976-07-30 Perforation Treatment Performed - Jet Perforation
1976-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-08-21 Perforation Treatment Performed - Jet Perforation
1976-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-08-25 Well Mode changed to Drilled and Cased
1979-10-16 Perforation Treatment Performed - Jet Perforation
1979-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-19 Perforation Treatment Performed - Fractured
1980-11-17 Well Began Production
1980-11-17 Well Fluid changed to Gas
1980-11-17 Well Mode changed to Flowing
1997-09-01 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-04-23 Perforation 3849.90 3857.90 7
1976-05-22 Perforation 3742.00 3747.50 7
1976-05-22 Perforation 3756.10 3759.10 7
1976-05-22 Perforation 3760.90 3767.60 7
1976-05-22 Acid Treatment 3726.80 3790.20 0
1976-05-24 Acid Treatment 3726.80 3790.20 0
1976-06-13 Acid Treatment 3726.80 3790.20 0
1976-06-26 Cement Squeeze 3726.80 3778.60 0
1976-06-29 Perforation 3742.00 3747.50 7
1976-06-30 Perforation 3726.80 3735.90 7
1976-06-30 Acid Treatment 3726.80 3747.50 0
1976-04-23 Perforation 3835.60 3846.60 7
1976-07-11 Cement Squeeze 3726.80 3790.20 0
1976-07-11 Perforation 3721.60 3724.70 13
1976-07-17 Perforation 3661.30 3665.20 7
1976-07-17 Perforation 3668.90 3673.10 7
1976-07-19 Perforation 3676.20 3683.50 7
1976-07-19 Acid Treatment 3661.30 3683.50 0
1976-07-23 Acid Treatment 3661.30 3683.50 0
1976-07-28 Perforation 3628.30 3632.90 7
1976-07-28 Perforation 3623.80 3628.30 7
1976-07-28 Perforation 3615.80 3622.50 7
1976-04-23 Perforation 3829.80 3832.60 7
1976-07-29 Perforation 3602.70 3607.90 7
1976-07-29 Perforation 3597.60 3602.70 7
1976-07-29 Perforation 3588.10 3591.20 7
1976-07-30 Perforation 3575.90 3579.00 7
1976-07-31 Acid Treatment 3575.90 3632.90 0
1976-08-01 Acid Treatment 3575.90 3632.90 0
1976-08-21 Perforation 2785.90 2802.60 7
1976-08-21 Perforation 2773.70 2785.90 7
1976-08-21 Perforation 2760.60 2770.60 7
1976-08-21 Perforation 2750.50 2760.60 7
1976-04-25 Acid Treatment 3829.80 3857.90 0
1976-08-24 Acid Treatment 2750.50 2802.60 0
1979-10-16 Perforation 3503.40 3504.60 3
1979-10-16 Perforation 3505.20 3509.20 3
1979-10-16 Perforation 3509.20 3511.90 3
1979-10-16 Perforation 3514.30 3515.30 3
1979-10-17 Acid Treatment 3503.40 3515.30 0
1979-10-18 Acid Treatment 3503.40 3515.30 0
1979-10-19 Fracture 3503.40 3515.30 0
1976-05-18 Cement Squeeze 3829.80 3857.90 0
1976-05-21 Perforation 3781.00 3784.70 7
1976-05-21 Perforation 3787.10 3790.20 7
1976-05-21 Perforation 3769.50 3778.60 7
1976-05-22 Perforation 3726.80 3735.90 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1023 0.0 0.0 0.0
1981 8213 0.0 0.0 0.0
1982 6698 0.0 0.0 0.0
1983 5877 0.0 0.0 0.0
1984 6773 0.0 0.0 0.0
1985 7168 0.0 0.0 0.0
1986 7963 0.0 0.0 0.0
1987 6907 0.0 0.0 0.0
1988 6117 0.0 0.0 0.0
1989 5556 0.0 0.0 0.0
1990 4626 0.0 0.0 0.0
1991 7493 0.0 0.0 0.0
1992 8686 0.0 0.0 0.0
1993 8333 0.0 0.0 0.0
1994 8712 0.0 0.0 0.0
1995 8654 0.0 0.0 0.0
1996 8312 0.0 0.0 0.0
1997 8344 0.0 0.0 0.0
1998 7417 0.0 0.0 0.0
1999 8236 0.0 0.0 0.0
2000 8294 0.0 0.0 0.0
2001 8594 0.0 0.0 0.0
2002 8646 0.0 0.0 0.0
2003 8686 0.0 0.0 0.0
2004 8132 0.0 0.0 0.0
2005 8008 0.0 0.0 0.0
2006 8502 0.0 0.0 0.0
2007 8654 0.0 0.0 0.0
2008 8586 0.0 0.0 0.0
2009 8646 0.0 0.0 0.0
2010 7521 0.0 0.0 0.0
2011 8581 0.0 0.0 0.0
2012 8185 0.0 0.0 0.0
2013 8600 0.0 0.0 0.0
2014 8173 0.0 0.0 0.0
2015 8584 0.0 0.0 0.0
2016 8619 0.0 0.0 0.0
2017 8147 0.0 0.0 0.0
2018 8141 0.0 0.0 0.0
2019 8591 0.0 0.0 0.0
2020 2136 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-04-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References