X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334122510000

Well Details

Well ID: 0334122510000
Loading map...
Location: 00/10-25-033-12W4/0
Location Alias: 00/10-25-33-12 W4M
Location Alias 2: 00/10-25-033-12 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 12
Section: 25
County/Municipality: Special Areas No. 2
Well Name: SOC GARDPL 10-25-33-12
Operator Name: AlphaBow Energy Ltd.
License Number: 0140615
License Date: 1989-08-10
License Status: Suspension
Spud Date: 1989-08-10
Final Drill Date: 1989-08-15
Well Total Depth: 1116.00 m
Surface Hole Latitude: 51.863406
Surface Hole Longitude: -111.572635

For data sources see[1][2]

Well History

Date Event
1989-08-10 Obtained License
1989-08-11 Surface Casing Operation Performed
1989-08-15 Finished Drilling
1989-08-15 Well Log Performed
1989-08-15 Well Mode changed to Drilled and Cased
1989-08-16 Drill Stem Test Performed
1989-08-17 Production Casing Operation Performed
1989-08-18 Rig Released
1989-10-15 Well Log Performed
1989-10-17 Well Log Performed
1989-10-18 Perforation Treatment Performed - Jet Perforation
1989-10-20 Perforation Treatment Performed - Fractured
1990-05-26 Well Began Production
1990-05-26 Well Fluid changed to Gas
1990-05-26 Well Mode changed to Flowing
2010-09-01 Well Fluid changed to Gas
2010-09-01 Well Mode changed to Suspended
2017-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-10-07 Plug Back Performed
2017-10-07 Well Fluid changed to Gas
2017-10-07 Well Log Performed
2017-10-07 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-10-18 Perforation 1021.50 1025.00 10
1989-10-18 Perforation 1025.50 1027.00 10
1989-10-18 Perforation 1028.50 1031.00 10
1989-10-18 Perforation 1033.00 1035.00 10
1989-10-18 Perforation 1039.00 1040.00 10
1989-10-20 Fracture 1021.50 1040.00 0
2017-10-07 Packing Device Capped w/Cement 1006.50 1014.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 4436 0.0 0.0 0.0
1991 8596 0.0 0.0 0.0
1992 7499 0.0 0.0 0.0
1993 5053 0.0 0.0 0.0
1994 8237 0.0 0.0 0.0
1995 8357 0.0 0.0 0.0
1996 8368 0.0 0.0 0.0
1997 5422 0.0 0.0 0.0
1998 6958 0.0 0.0 0.0
1999 7181 0.0 0.0 0.0
2000 7808 0.0 0.0 0.0
2001 6937 0.0 0.0 0.0
2002 8006 0.0 0.0 0.0
2003 2437 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References