X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334171615000

Well Details

Well ID: 0334171615000
Loading map...
Location: 00/15-16-033-17W4/0
Location Alias: 00/15-16-33-17 W4M
Location Alias 2: 00/15-16-033-17 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 17
Section: 16
County/Municipality: Starland County
Well Name: TEAC CHAIN 15-16-33-17
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0353495
License Date: 2006-03-07
License Status: Issued
Spud Date: 2006-06-06
Final Drill Date: 2006-06-06
Well Total Depth: 596.00 m
Surface Hole Latitude: 51.835221
Surface Hole Longitude: -112.351832

For data sources see[1][2]

Well History

Date Event
2006-03-07 Obtained License
2006-05-24 Surface Casing Operation Performed
2006-06-06 Finished Drilling
2006-06-06 Well Mode changed to Drilled and Cased
2006-06-07 Production Casing Operation Performed
2006-06-07 Rig Released
2006-06-29 Well Log Performed
2006-10-14 Perforation Treatment Performed - Jet Perforation
2006-10-14 Well Log Performed
2006-12-02 Perforation Treatment Performed - Fractured
2007-01-25 Well Began Production
2007-01-25 Well Fluid changed to Coalbed Methane-Coals and Other
2007-01-25 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-10-14 Perforation 310.00 310.50 13
2006-10-14 Perforation 155.00 156.00 7
2006-10-14 Perforation 153.50 154.50 7
2006-10-14 Perforation 149.30 149.80 13
2006-10-14 Perforation 144.70 145.20 13
2006-10-14 Perforation 142.00 143.00 7
2006-10-14 Perforation 137.00 138.00 7
2006-10-14 Perforation 132.10 133.10 7
2006-10-14 Perforation 127.30 128.80 7
2006-10-14 Perforation 126.60 127.10 13
2006-10-14 Perforation 124.20 125.20 7
2006-10-14 Perforation 290.60 291.60 7
2006-10-14 Perforation 117.50 118.00 13
2006-10-14 Perforation 116.50 117.00 13
2006-10-14 Perforation 93.70 94.70 7
2006-10-14 Perforation 89.20 90.20 7
2006-12-02 Fracture 310.00 310.50 0
2006-12-02 Fracture 290.60 291.60 0
2006-12-02 Fracture 261.00 261.50 0
2006-12-02 Fracture 236.50 237.00 0
2006-12-02 Fracture 229.20 231.30 0
2006-12-02 Fracture 226.50 228.50 0
2006-10-14 Perforation 261.00 261.50 13
2006-12-02 Fracture 160.00 160.50 0
2006-12-02 Fracture 153.50 156.00 0
2006-12-02 Fracture 149.30 149.80 0
2006-12-02 Fracture 144.70 145.20 0
2006-12-02 Fracture 142.00 143.00 0
2006-12-02 Fracture 137.00 138.00 0
2006-12-02 Fracture 132.10 133.00 0
2006-12-02 Fracture 126.60 128.80 0
2006-12-02 Fracture 124.20 125.20 0
2006-12-02 Fracture 116.50 118.00 0
2006-10-14 Perforation 236.50 237.00 13
2006-12-02 Fracture 93.70 94.70 0
2006-12-02 Fracture 89.20 90.20 0
2006-10-14 Perforation 230.30 231.30 7
2006-10-14 Perforation 229.20 229.70 13
2006-10-14 Perforation 228.00 228.50 13
2006-10-14 Perforation 226.50 227.50 7
2006-10-14 Perforation 160.00 160.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 7924 0.0 0.0 0.0
2008 8654 0.0 0.0 0.0
2009 8584 0.0 0.0 0.0
2010 8673 0.0 0.0 0.0
2011 8591 0.0 0.0 0.0
2012 8671 0.0 0.0 0.0
2013 8623 0.0 0.0 0.0
2014 1930 0.0 0.0 0.0
2015 6746 0.0 0.0 0.0
2016 8374 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 2879 0.0 0.0 0.0

For data sources see[5]

References