X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334200307002

Well Details

Well ID: 0334200307002
Loading map...
Location: 00/07-03-033-20W4/2
Location Alias: 00/07-03-33-20 W4M
Location Alias 2: 00/07-03-033-20 W4/02
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 20
Section: 03
County/Municipality: Starland County
Well Name: TEAC ROWLEY 7-3-33-20
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0033072
License Date: 1967-11-16
License Status: Abandoned
Spud Date: 1967-11-18
Final Drill Date: 1967-11-25
Well Total Depth: 1408.50 m
Surface Hole Latitude: 51.799951
Surface Hole Longitude: -112.754354

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-11-16 Obtained License
1967-11-25 Finished Drilling
1967-11-25 Well Mode changed to Drilled and Cased
1967-11-26 Drill Stem Test Performed
1967-11-28 Drill Stem Test Performed
1967-11-29 Drill Stem Test Performed
1967-11-30 Production Casing Operation Performed
1995-09-05 Well Log Performed
1995-09-06 Perforation Treatment Performed - Jet Perforation
1995-09-06 Well Log Performed
1999-03-02 Well Log Performed
2001-02-03 Well Log Performed
2001-03-03 Perforation Treatment Performed - Jet Perforation
2001-05-15 Perforation Treatment Performed - Fractured
2001-05-15 Well Mode changed to Drilled and Cased
2010-08-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-15 Plug Back Performed
2010-08-15 Well Log Performed
2010-08-19 Well Log Performed
2010-08-24 Perforation Treatment Performed - Cement Squeeze
2010-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-30 Perforation Treatment Performed - Jet Perforation
2010-08-30 Plug Back Performed
2010-08-30 Well Mode changed to Abandoned Zone
2010-09-02 Perforation Treatment Performed - Remedial Casing
2011-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-12 Perforation Treatment Performed - Cement Plug
2011-06-12 Perforation Treatment Performed - Jet Perforation
2011-06-14 Perforation Treatment Performed - Jet Perforation
2011-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-15 Perforation Treatment Performed - Remedial Casing
2011-06-16 Perforation Treatment Performed - Cement Plug
2011-06-16 Perforation Treatment Performed - Jet Perforation
2011-06-16 Perforation Treatment Performed - Remedial Casing
2011-06-17 Perforation Treatment Performed - Cement Plug
2011-06-27 Perforation Treatment Performed - Cement Plug
2011-06-29 Perforation Treatment Performed - Jet Perforation
2011-06-29 Perforation Treatment Performed - Remedial Casing
2011-07-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-02 Well Abandoned
2012-06-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-09-06 Perforation 1365.50 1366.70 13
2010-09-02 Remedial Casing Cementing 609.00 610.00 0
2011-06-10 Packing Device Capped w/Cement 687.00 695.00 0
2011-06-11 Packing Device Capped w/Cement 592.00 600.00 0
2011-06-12 Perforation 582.00 583.50 17
2011-06-12 Cement Plug 570.00 592.00 0
2011-06-14 Perforation 464.00 465.00 17
2011-06-15 Remedial Casing Cementing 464.00 465.00 0
2011-06-15 Packing Device Capped w/Cement 450.00 460.00 0
2011-06-16 Perforation 440.00 441.00 17
2011-06-16 Remedial Casing Cementing 440.00 441.00 0
2001-03-03 Perforation 1179.60 1181.60 13
2011-06-16 Cement Plug 434.00 450.00 0
2011-06-17 Cement Plug 422.20 434.00 0
2011-06-27 Cement Plug 334.40 379.40 0
2011-06-29 Perforation 278.50 280.00 17
2011-06-29 Remedial Casing Cementing 278.50 280.00 0
2011-07-01 Packing Device Capped w/Cement 221.00 270.00 0
2011-07-03 Packing Device Capped w/Cement 99.50 131.00 0
2001-05-15 Fracture 1179.60 1181.60 0
2010-08-15 Packing Device Capped w/Cement 1352.00 1360.00 0
2010-08-24 Cement Squeeze 1179.60 1181.60 0
2010-08-30 Perforation 700.00 701.00 20
2010-08-30 Packing Device Capped w/Cement 1162.00 1170.00 0
2010-08-30 Perforation 609.00 610.00 20
2010-09-02 Remedial Casing Cementing 700.00 701.00 0

For data sources see[4]



References