If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0334240316022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.808113,"lon":-113.313569,"icon":""}]} |
| Location: 02/16-03-033-24W4/2 | |
| Location Alias: 02/16-03-33-24 W4M | |
| Location Alias 2: 02/16-03-033-24 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 033 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 03 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER 102 TWINING 16-3-33-24 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0405179 | |
| License Date: 2008-12-03 | |
| License Status: Issued | |
| Spud Date: 2009-01-30 | |
| Final Drill Date: 2009-02-01 | |
| Well Total Depth: 646.00 m | |
| Surface Hole Latitude: 51.808113 | |
| Surface Hole Longitude: -113.313569 |
| Date | Event |
|---|---|
| 2008-12-03 | Obtained License |
| 2009-01-30 | Surface Casing Operation Performed |
| 2009-02-01 | Finished Drilling |
| 2009-02-01 | Well Mode changed to Drilled and Cased |
| 2009-02-02 | Production Casing Operation Performed |
| 2009-02-02 | Rig Released |
| 2009-02-05 | Well Log Performed |
| 2009-02-16 | Perforation Treatment Performed - Jet Perforation |
| 2009-02-18 | Perforation Treatment Performed - Fractured |
| 2009-08-24 | Perforation Treatment Performed - Jet Perforation |
| 2009-08-27 | Perforation Treatment Performed - Fractured |
| 2009-09-01 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2009-09-01 | Well Mode changed to Testing |
| 2009-09-02 | Well Began Production |
| 2009-09-02 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2009-09-02 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-02-16 | Perforation | 593.40 | 594.40 | 13 |
| 2009-02-16 | Perforation | 509.90 | 510.40 | 13 |
| 2009-02-16 | Perforation | 505.10 | 506.10 | 13 |
| 2009-02-16 | Perforation | 501.10 | 501.60 | 13 |
| 2009-02-16 | Perforation | 474.00 | 475.00 | 13 |
| 2009-02-16 | Perforation | 466.00 | 467.00 | 13 |
| 2009-02-16 | Perforation | 464.00 | 465.00 | 13 |
| 2009-02-16 | Perforation | 237.90 | 238.90 | 13 |
| 2009-02-18 | Fracture | 237.90 | 594.40 | 0 |
| 2009-08-24 | Perforation | 592.00 | 594.00 | 13 |
| 2009-08-24 | Perforation | 522.40 | 522.90 | 13 |
| 2009-02-16 | Perforation | 590.80 | 591.30 | 13 |
| 2009-08-24 | Perforation | 492.60 | 493.10 | 13 |
| 2009-08-24 | Perforation | 456.70 | 457.20 | 13 |
| 2009-08-24 | Perforation | 413.50 | 414.00 | 13 |
| 2009-08-24 | Perforation | 396.90 | 397.90 | 13 |
| 2009-08-24 | Perforation | 354.20 | 354.70 | 13 |
| 2009-08-24 | Perforation | 341.10 | 341.60 | 13 |
| 2009-08-24 | Perforation | 335.70 | 336.20 | 13 |
| 2009-08-24 | Perforation | 612.40 | 612.90 | 13 |
| 2009-08-24 | Perforation | 607.60 | 608.10 | 13 |
| 2009-08-24 | Perforation | 601.80 | 602.30 | 13 |
| 2009-02-16 | Perforation | 588.20 | 589.20 | 13 |
| 2009-08-27 | Fracture | 335.70 | 594.00 | 0 |
| 2009-08-27 | Fracture | 601.80 | 612.90 | 0 |
| 2009-02-16 | Perforation | 580.50 | 581.00 | 13 |
| 2009-02-16 | Perforation | 566.10 | 567.10 | 13 |
| 2009-02-16 | Perforation | 553.40 | 553.90 | 13 |
| 2009-02-16 | Perforation | 543.60 | 544.10 | 13 |
| 2009-02-16 | Perforation | 516.80 | 517.30 | 13 |
| 2009-02-16 | Perforation | 514.10 | 514.60 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 2928 | 0.0 | 0.0 | 0.0 |
| 2010 | 8726 | 0.0 | 0.0 | 0.0 |
| 2011 | 8734 | 0.0 | 0.0 | 0.0 |
| 2012 | 8679 | 0.0 | 0.0 | 0.0 |
| 2013 | 8745 | 0.0 | 0.0 | 0.0 |
| 2014 | 8699 | 0.0 | 0.0 | 0.0 |
| 2015 | 8756 | 0.0 | 0.0 | 0.0 |
| 2016 | 8770 | 0.0 | 0.0 | 0.0 |
| 2017 | 8572 | 0.0 | 0.0 | 0.0 |
| 2018 | 8749 | 0.0 | 0.0 | 0.0 |
| 2019 | 8749 | 0.0 | 0.0 | 0.0 |
| 2020 | 2169 | 0.0 | 0.0 | 0.0 |
For data sources see[5]