If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0334261416000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.834714,"lon":-113.57643,"icon":""}]} |
| Location: 00/16-14-033-26W4/0 | |
| Location Alias: 00/16-14-33-26 W4M | |
| Location Alias 2: 00/16-14-033-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 033 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 14 | |
| County/Municipality: Kneehill County | |
| Well Name: CNRL WIM 16-14-33-26 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0365918 | |
| License Date: 2006-11-14 | |
| License Status: Issued | |
| Spud Date: 2006-12-14 | |
| Final Drill Date: 2007-01-07 | |
| Well Total Depth: 746.50 m | |
| Surface Hole Latitude: 51.834714 | |
| Surface Hole Longitude: -113.576430 |
| Date | Event |
|---|---|
| 2006-11-14 | Obtained License |
| 2006-12-14 | Lost Circulation Occurred |
| 2006-12-15 | Surface Casing Operation Performed |
| 2007-01-07 | Finished Drilling |
| 2007-01-07 | Production Casing Operation Performed |
| 2007-01-07 | Rig Released |
| 2007-01-07 | Well Log Performed |
| 2007-01-07 | Well Mode changed to Drilled and Cased |
| 2007-01-24 | Perforation Treatment Performed - Jet Perforation |
| 2007-01-24 | Well Log Performed |
| 2007-01-29 | Perforation Treatment Performed - Fractured |
| 2007-08-20 | Well Began Production |
| 2007-08-20 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2007-08-20 | Well Mode changed to Flowing |
| 2010-01-21 | Perforation Treatment Performed - Jet Perforation |
| 2010-01-21 | Well Log Performed |
| 2010-01-27 | Perforation Treatment Performed - Fractured |
| 2010-02-01 | Well Fluid changed to CBM and Shale and Other |
| 2010-02-01 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2007-01-24 | Perforation | 429.50 | 430.50 | 13 |
| 2007-01-24 | Perforation | 636.80 | 637.80 | 13 |
| 2007-01-24 | Perforation | 638.80 | 639.80 | 13 |
| 2007-01-24 | Perforation | 648.20 | 649.20 | 13 |
| 2007-01-24 | Perforation | 655.40 | 656.40 | 13 |
| 2007-01-24 | Perforation | 686.00 | 687.30 | 13 |
| 2007-01-24 | Perforation | 688.00 | 690.00 | 13 |
| 2007-01-24 | Perforation | 704.00 | 705.00 | 13 |
| 2007-01-24 | Perforation | 710.00 | 711.00 | 13 |
| 2007-01-24 | Perforation | 712.20 | 713.20 | 13 |
| 2007-01-29 | Fracture | 429.50 | 713.20 | 0 |
| 2007-01-24 | Perforation | 447.80 | 448.80 | 13 |
| 2010-01-21 | Perforation | 485.30 | 489.50 | 7 |
| 2010-01-21 | Perforation | 562.00 | 564.00 | 7 |
| 2010-01-21 | Perforation | 342.50 | 344.00 | 7 |
| 2010-01-21 | Perforation | 403.00 | 404.00 | 7 |
| 2010-01-27 | Fracture | 485.30 | 489.50 | 0 |
| 2010-01-27 | Fracture | 562.00 | 564.00 | 0 |
| 2010-01-27 | Fracture | 342.50 | 344.00 | 0 |
| 2010-01-27 | Fracture | 403.00 | 404.00 | 0 |
| 2007-01-24 | Perforation | 499.80 | 500.80 | 13 |
| 2007-01-24 | Perforation | 512.20 | 513.20 | 13 |
| 2007-01-24 | Perforation | 550.20 | 551.20 | 13 |
| 2007-01-24 | Perforation | 556.80 | 557.80 | 13 |
| 2007-01-24 | Perforation | 558.80 | 560.60 | 13 |
| 2007-01-24 | Perforation | 609.50 | 610.50 | 13 |
| 2007-01-24 | Perforation | 629.50 | 630.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2007 | 3211 | 0.0 | 0.0 | 0.0 |
| 2008 | 8609 | 0.0 | 0.0 | 0.0 |
| 2009 | 8685 | 0.0 | 0.0 | 0.0 |
| 2010 | 8759 | 0.0 | 0.0 | 0.0 |
| 2011 | 8723 | 0.0 | 0.0 | 0.0 |
| 2012 | 8783 | 0.0 | 0.0 | 0.0 |
| 2013 | 8735 | 0.0 | 0.0 | 0.0 |
| 2014 | 8735 | 0.0 | 0.0 | 0.0 |
| 2015 | 8759 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8735 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2006-12-14 | Lost Circulation | 6.00 | 150.50 |
For data sources see[6]