X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334282508000

Well Details

Well ID: 0334282508000
Loading map...
Location: 00/08-25-033-28W4/0
Location Alias: 00/08-25-33-28 W4M
Location Alias 2: 00/08-25-033-28 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 28
Section: 25
County/Municipality: Mountain View County
Well Name: EMBER DAVEY 8-25-33-28
Operator Name: Ember Resources Inc.
License Number: 0340351
License Date: 2005-10-18
License Status: Issued
Spud Date: 2005-11-20
Final Drill Date: 2005-12-20
Well Total Depth: 1224.00 m
Surface Hole Latitude: 51.859676
Surface Hole Longitude: -113.835069

For data sources see[1][2]

Well History

Date Event
2005-10-18 Obtained License
2005-11-20 Surface Casing Operation Performed
2005-12-20 Finished Drilling
2005-12-20 Well Mode changed to Drilled and Cased
2005-12-24 Production Casing Operation Performed
2005-12-25 Rig Released
2006-01-06 Well Log Performed
2006-03-12 Perforation Treatment Performed - Jet Perforation
2006-03-12 Well Log Performed
2006-03-14 Perforation Treatment Performed - Fractured
2006-03-30 Well Began Production
2006-03-30 Well Fluid changed to Coalbed Methane-Coals and Other
2006-03-30 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-12 Perforation 438.80 439.30 17
2006-03-12 Perforation 633.80 634.30 17
2006-03-12 Perforation 687.70 688.90 17
2006-03-12 Perforation 737.00 742.00 17
2006-03-12 Perforation 747.50 748.50 17
2006-03-12 Perforation 753.20 753.90 17
2006-03-12 Perforation 758.40 758.90 17
2006-03-12 Perforation 764.50 765.50 17
2006-03-12 Perforation 767.90 768.80 17
2006-03-12 Perforation 775.70 776.20 17
2006-03-12 Perforation 780.00 781.50 17
2006-03-12 Perforation 446.00 446.80 17
2006-03-12 Perforation 802.90 804.10 17
2006-03-12 Perforation 810.10 810.60 17
2006-03-12 Perforation 812.70 814.10 17
2006-03-12 Perforation 819.90 820.40 17
2006-03-12 Perforation 823.70 824.30 17
2006-03-12 Perforation 832.50 833.00 17
2006-03-12 Perforation 837.70 838.30 17
2006-03-12 Perforation 982.50 983.50 17
2006-03-12 Perforation 1148.00 1149.00 17
2006-03-12 Perforation 1167.00 1169.00 17
2006-03-12 Perforation 457.00 459.00 17
2006-03-14 Fracture 438.80 1169.00 0
2006-03-12 Perforation 498.00 499.00 17
2006-03-12 Perforation 543.00 544.00 17
2006-03-12 Perforation 551.70 552.20 17
2006-03-12 Perforation 566.90 567.40 17
2006-03-12 Perforation 605.00 606.00 17
2006-03-12 Perforation 621.50 622.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 6529 0.0 0.0 0.0
2007 8721 0.0 0.0 0.0
2008 8695 0.0 0.0 0.0
2009 8645 0.0 0.0 0.0
2010 8690 0.0 0.0 0.0
2011 8592 0.0 0.0 0.0
2012 8529 0.0 0.0 0.0
2013 8633 0.0 0.0 0.0
2014 8753 0.0 0.0 0.0
2015 8702 0.0 0.0 0.0
2016 8463 0.0 0.0 0.0
2017 8709 0.0 0.0 0.0
2018 8702 0.0 0.0 0.0
2019 8645 0.0 0.0 0.0
2020 2170 0.0 0.0 0.0

For data sources see[5]

References