X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335011910000

Well Details

Well ID: 0335011910000
Loading map...
Location: 00/10-19-033-01W5/0
Location Alias: 00/10-19-33-01 W5M
Location Alias 2: 00/10-19-033-01 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 01
Section: 19
County/Municipality: Mountain View County
Well Name: NAL GARR 10-19-33-1
Operator Name: NAL Resources Limited
License Number: 0045142
License Date: 1973-02-16
License Status: Abandoned
Spud Date: 1973-02-21
Final Drill Date: 1973-03-13
Well Total Depth: 2356.10 m
Surface Hole Latitude: 51.848750
Surface Hole Longitude: -114.127666

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-02-16 Obtained License
1973-03-05 Drill Stem Test Performed
1973-03-13 Finished Drilling
1973-03-15 Drill Stem Test Performed
1973-03-16 Drill Stem Test Performed
1973-03-18 Production Casing Operation Performed
1973-05-19 Perforation Treatment Performed - Jet Perforation
1973-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-09 Perforation Treatment Performed - Jet Perforation
1973-06-10 Perforation Treatment Performed - Nitrogen Treatment
1973-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-08-20 Perforation Treatment Performed - Jet Perforation
1973-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-08-22 Perforation Treatment Performed - Fractured
1973-09-07 Well Mode changed to Drilled and Cased
1994-07-08 Perforation Treatment Performed - Jet Perforation
1994-10-22 Well Mode changed to Drilled and Cased
1996-11-23 Perforation Treatment Performed - Jet Perforation
1996-11-24 Perforation Treatment Performed - Fractured
1996-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-27 Plug Back Performed
2005-01-13 Well Log Performed
2007-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-09 Plug Back Performed
2007-01-09 Well Mode changed to Abandoned Zone
2007-01-10 Well Log Performed
2007-01-13 Perforation Treatment Performed - Jet Perforation
2007-01-14 Perforation Treatment Performed - Remedial Casing
2007-01-15 Perforation Treatment Performed - Jet Perforation
2007-01-15 Well Log Performed
2007-01-16 Perforation Treatment Performed - Remedial Casing
2007-01-17 Perforation Treatment Performed - Jet Perforation
2007-01-17 Well Log Performed
2007-01-18 Perforation Treatment Performed - Remedial Casing
2007-01-20 Well Log Performed
2007-01-24 Perforation Treatment Performed - Jet Perforation
2007-01-24 Well Log Performed
2007-01-25 Perforation Treatment Performed - Remedial Casing
2007-01-26 Well Log Performed
2007-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-27 Perforation Treatment Performed - Jet Perforation
2007-01-27 Plug Back Performed
2007-01-29 Perforation Treatment Performed - Remedial Casing
2007-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-01 Plug Back Performed
2007-02-01 Well Log Performed
2012-11-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-05-19 Perforation 2282.60 2285.10 7
1973-08-22 Fracture 1995.20 2005.60 0
1994-07-08 Perforation 2282.60 2290.90 7
1996-11-23 Perforation 2316.50 2319.50 14
1996-11-23 Perforation 2306.40 2307.60 14
1996-11-23 Perforation 2301.00 2305.00 14
1996-11-24 Fracture 2301.00 2319.50 0
1996-11-27 Packing Device Capped w/Cement 2263.60 2271.60 0
2007-01-09 Packing Device Capped w/Cement 1977.00 1985.00 0
2007-01-13 Perforation 1367.00 1368.00 13
2007-01-13 Perforation 1327.00 1328.00 13
1973-05-20 Acid Treatment 2282.60 2285.10 0
2007-01-14 Remedial Casing Cementing 1367.00 1368.00 0
2007-01-14 Remedial Casing Cementing 1327.00 1328.00 0
2007-01-15 Perforation 1098.00 1099.00 13
2007-01-15 Perforation 1077.00 1078.00 13
2007-01-16 Remedial Casing Cementing 1098.00 1099.00 0
2007-01-16 Remedial Casing Cementing 1077.00 1078.00 0
2007-01-17 Perforation 570.00 571.00 13
2007-01-18 Remedial Casing Cementing 570.00 571.00 0
2007-01-24 Perforation 345.00 346.00 13
2007-01-25 Remedial Casing Cementing 345.00 346.00 0
1973-06-01 Acid Treatment 2282.60 2285.10 0
2007-01-27 Packing Device Capped w/Cement 330.00 338.00 0
2007-01-27 Perforation 287.00 288.00 13
2007-01-29 Remedial Casing Cementing 287.00 288.00 0
2007-02-01 Packing Device Capped w/Cement 275.00 283.00 0
1973-06-09 Perforation 2285.10 2290.90 7
1973-06-09 Acid Treatment 2282.60 2290.90 0
1973-06-10 Nitrogen Treatment 2282.60 2290.90 0
1973-08-20 Packing Device Capped w/Cement 2220.50 2225.00 0
1973-08-20 Perforation 1995.20 2005.60 7
1973-08-21 Acid Treatment 1995.20 2005.60 0

For data sources see[4]



References