If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0335011910000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.84875,"lon":-114.127666,"icon":""}]} |
Location: 00/10-19-033-01W5/0 | |
Location Alias: 00/10-19-33-01 W5M | |
Location Alias 2: 00/10-19-033-01 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 5 | |
Range: 01 | |
Section: 19 | |
County/Municipality: Mountain View County | |
Well Name: NAL GARR 10-19-33-1 | |
Operator Name: NAL Resources Limited | |
License Number: 0045142 | |
License Date: 1973-02-16 | |
License Status: Abandoned | |
Spud Date: 1973-02-21 | |
Final Drill Date: 1973-03-13 | |
Well Total Depth: 2356.10 m | |
Surface Hole Latitude: 51.848750 | |
Surface Hole Longitude: -114.127666 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1973-02-16 | Obtained License |
1973-03-05 | Drill Stem Test Performed |
1973-03-13 | Finished Drilling |
1973-03-15 | Drill Stem Test Performed |
1973-03-16 | Drill Stem Test Performed |
1973-03-18 | Production Casing Operation Performed |
1973-05-19 | Perforation Treatment Performed - Jet Perforation |
1973-05-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-06-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-06-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-06-09 | Perforation Treatment Performed - Jet Perforation |
1973-06-10 | Perforation Treatment Performed - Nitrogen Treatment |
1973-08-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1973-08-20 | Perforation Treatment Performed - Jet Perforation |
1973-08-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-08-22 | Perforation Treatment Performed - Fractured |
1973-09-07 | Well Mode changed to Drilled and Cased |
1994-07-08 | Perforation Treatment Performed - Jet Perforation |
1994-10-22 | Well Mode changed to Drilled and Cased |
1996-11-23 | Perforation Treatment Performed - Jet Perforation |
1996-11-24 | Perforation Treatment Performed - Fractured |
1996-11-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-11-27 | Plug Back Performed |
2005-01-13 | Well Log Performed |
2007-01-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-01-09 | Plug Back Performed |
2007-01-09 | Well Mode changed to Abandoned Zone |
2007-01-10 | Well Log Performed |
2007-01-13 | Perforation Treatment Performed - Jet Perforation |
2007-01-14 | Perforation Treatment Performed - Remedial Casing |
2007-01-15 | Perforation Treatment Performed - Jet Perforation |
2007-01-15 | Well Log Performed |
2007-01-16 | Perforation Treatment Performed - Remedial Casing |
2007-01-17 | Perforation Treatment Performed - Jet Perforation |
2007-01-17 | Well Log Performed |
2007-01-18 | Perforation Treatment Performed - Remedial Casing |
2007-01-20 | Well Log Performed |
2007-01-24 | Perforation Treatment Performed - Jet Perforation |
2007-01-24 | Well Log Performed |
2007-01-25 | Perforation Treatment Performed - Remedial Casing |
2007-01-26 | Well Log Performed |
2007-01-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-01-27 | Perforation Treatment Performed - Jet Perforation |
2007-01-27 | Plug Back Performed |
2007-01-29 | Perforation Treatment Performed - Remedial Casing |
2007-02-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-02-01 | Plug Back Performed |
2007-02-01 | Well Log Performed |
2012-11-08 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1973-05-19 | Perforation | 2282.60 | 2285.10 | 7 |
1973-08-22 | Fracture | 1995.20 | 2005.60 | 0 |
1994-07-08 | Perforation | 2282.60 | 2290.90 | 7 |
1996-11-23 | Perforation | 2316.50 | 2319.50 | 14 |
1996-11-23 | Perforation | 2306.40 | 2307.60 | 14 |
1996-11-23 | Perforation | 2301.00 | 2305.00 | 14 |
1996-11-24 | Fracture | 2301.00 | 2319.50 | 0 |
1996-11-27 | Packing Device Capped w/Cement | 2263.60 | 2271.60 | 0 |
2007-01-09 | Packing Device Capped w/Cement | 1977.00 | 1985.00 | 0 |
2007-01-13 | Perforation | 1367.00 | 1368.00 | 13 |
2007-01-13 | Perforation | 1327.00 | 1328.00 | 13 |
1973-05-20 | Acid Treatment | 2282.60 | 2285.10 | 0 |
2007-01-14 | Remedial Casing Cementing | 1367.00 | 1368.00 | 0 |
2007-01-14 | Remedial Casing Cementing | 1327.00 | 1328.00 | 0 |
2007-01-15 | Perforation | 1098.00 | 1099.00 | 13 |
2007-01-15 | Perforation | 1077.00 | 1078.00 | 13 |
2007-01-16 | Remedial Casing Cementing | 1098.00 | 1099.00 | 0 |
2007-01-16 | Remedial Casing Cementing | 1077.00 | 1078.00 | 0 |
2007-01-17 | Perforation | 570.00 | 571.00 | 13 |
2007-01-18 | Remedial Casing Cementing | 570.00 | 571.00 | 0 |
2007-01-24 | Perforation | 345.00 | 346.00 | 13 |
2007-01-25 | Remedial Casing Cementing | 345.00 | 346.00 | 0 |
1973-06-01 | Acid Treatment | 2282.60 | 2285.10 | 0 |
2007-01-27 | Packing Device Capped w/Cement | 330.00 | 338.00 | 0 |
2007-01-27 | Perforation | 287.00 | 288.00 | 13 |
2007-01-29 | Remedial Casing Cementing | 287.00 | 288.00 | 0 |
2007-02-01 | Packing Device Capped w/Cement | 275.00 | 283.00 | 0 |
1973-06-09 | Perforation | 2285.10 | 2290.90 | 7 |
1973-06-09 | Acid Treatment | 2282.60 | 2290.90 | 0 |
1973-06-10 | Nitrogen Treatment | 2282.60 | 2290.90 | 0 |
1973-08-20 | Packing Device Capped w/Cement | 2220.50 | 2225.00 | 0 |
1973-08-20 | Perforation | 1995.20 | 2005.60 | 7 |
1973-08-21 | Acid Treatment | 1995.20 | 2005.60 | 0 |
For data sources see[4]