If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0335032202000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.853978,"lon":-114.331419,"icon":""}]} |
Location: 00/02-22-033-03W5/0 | |
Location Alias: 00/02-22-33-03 W5M | |
Location Alias 2: 00/02-22-033-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 5 | |
Range: 03 | |
Section: 22 | |
County/Municipality: Mountain View County | |
Well Name: BACCALIEU HZ GARR 2-22-33-3 | |
Operator Name: Baccalieu Energy Inc. | |
License Number: 0447519 | |
License Date: 2012-08-01 | |
License Status: Issued | |
Spud Date: 2012-09-22 | |
Final Drill Date: 2012-10-04 | |
Well Total Depth: 3710.00 m | |
Surface Hole Latitude: 51.853978 | |
Surface Hole Longitude: -114.331419 |
Date | Event |
---|---|
2012-08-01 | Obtained License |
2012-09-23 | Intermediate Casing Operation Performed |
2012-09-23 | Surface Casing Operation Performed |
2012-09-25 | Direction Drilling Operation Performed - Deviate |
2012-09-26 | Direction Drilling Operation Performed - Horizontal |
2012-09-28 | Well Log Performed |
2012-10-04 | Finished Drilling |
2012-10-04 | Well Mode changed to Drilled and Cased |
2012-10-06 | Liner Casing Operation Performed |
2012-10-06 | Perforation Treatment Performed - Open-Hole Completion |
2012-10-07 | Rig Released |
2012-10-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-01 | Well Began Production |
2012-11-01 | Well Fluid changed to Crude Oil |
2012-11-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-09-22 | Ensign Drilling Inc. | 544 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-09-25 | 1588.00 | Deviate (5 - 79 degrees) |
2012-09-26 | 2096.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-06 | Open Hole/Barefoot Completion | 3705.00 | 3710.00 | 0 |
2012-10-30 | Multi-Stage Fracture | 3050.70 | 3050.80 | 0 |
2012-10-30 | Multi-Stage Fracture | 2977.90 | 2978.00 | 0 |
2012-10-30 | Multi-Stage Fracture | 2891.50 | 2891.60 | 0 |
2012-10-30 | Multi-Stage Fracture | 2818.70 | 2818.80 | 0 |
2012-10-30 | Multi-Stage Fracture | 2732.20 | 2732.30 | 0 |
2012-10-30 | Multi-Stage Fracture | 2659.40 | 2659.50 | 0 |
2012-10-30 | Multi-Stage Fracture | 2586.60 | 2586.70 | 0 |
2012-10-30 | Multi-Stage Fracture | 2500.10 | 2500.20 | 0 |
2012-10-30 | Multi-Stage Fracture | 2427.50 | 2427.60 | 0 |
2012-10-30 | Multi-Stage Fracture | 2341.70 | 2341.80 | 0 |
2012-10-30 | Multi-Stage Fracture | 3663.90 | 3664.00 | 0 |
2012-10-30 | Multi-Stage Fracture | 2268.80 | 2268.90 | 0 |
2012-10-30 | Multi-Stage Fracture | 2196.30 | 2196.40 | 0 |
2012-10-30 | Multi-Stage Fracture | 3603.00 | 3603.10 | 0 |
2012-10-30 | Multi-Stage Fracture | 3515.00 | 3515.10 | 0 |
2012-10-30 | Multi-Stage Fracture | 3442.00 | 3442.10 | 0 |
2012-10-30 | Multi-Stage Fracture | 3355.70 | 3355.80 | 0 |
2012-10-30 | Multi-Stage Fracture | 3282.90 | 3283.00 | 0 |
2012-10-30 | Multi-Stage Fracture | 3210.10 | 3210.20 | 0 |
2012-10-30 | Multi-Stage Fracture | 3123.60 | 3123.70 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1464 | 0.0 | 0.0 | 0.0 |
2013 | 8735 | 0.0 | 0.0 | 0.0 |
2014 | 8700 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8626 | 0.0 | 0.0 | 0.0 |
2018 | 8681 | 0.0 | 0.0 | 0.0 |
2019 | 8579 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-07 | No Incident Encountered | 0.00 | 0.00 |
2012-11-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]