If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0335033010000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.863928,"lon":-114.410199,"icon":""}]} |
| Location: 00/10-30-033-03W5/0 | |
| Location Alias: 00/10-30-33-03 W5M | |
| Location Alias 2: 00/10-30-033-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 033 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 30 | |
| County/Municipality: Mountain View County | |
| Well Name: BEC GARR 10-30-33-3 | |
| Operator Name: Bonavista Energy Corporation | |
| License Number: 0083268 | |
| License Date: 1980-06-05 | |
| License Status: Abandoned | |
| Spud Date: 1980-06-15 | |
| Final Drill Date: 1980-07-09 | |
| Well Total Depth: 2515.00 m | |
| Surface Hole Latitude: 51.863928 | |
| Surface Hole Longitude: -114.410199 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1980-06-05 | Obtained License |
| 1980-07-09 | Finished Drilling |
| 1980-07-09 | Well Mode changed to Drilled and Cased |
| 1980-07-13 | Production Casing Operation Performed |
| 1980-08-25 | Perforation Treatment Performed - Jet Perforation |
| 1980-09-03 | Well Began Production |
| 1980-09-03 | Well Fluid changed to Crude Oil |
| 1980-09-03 | Well Mode changed to Flowing |
| 1980-10-08 | Well Fluid changed to Crude Oil |
| 1980-10-08 | Well Mode changed to Suspended |
| 1981-08-01 | Well Fluid changed to Crude Oil |
| 1981-08-01 | Well Mode changed to Flowing |
| 1987-03-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1987-03-21 | Plug Back Performed |
| 1987-03-21 | Well Fluid changed to Crude Oil |
| 1987-03-21 | Well Mode changed to Abandoned Zone |
| 1987-03-25 | Perforation Treatment Performed - Jet Perforation |
| 1987-03-28 | Perforation Treatment Performed - Fractured |
| 1987-03-31 | Well Log Performed |
| 2011-02-18 | Well Log Performed |
| 2011-02-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-02-21 | Plug Back Performed |
| 2011-02-21 | Well Log Performed |
| 2011-02-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-02-22 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-22 | Plug Back Performed |
| 2011-02-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-02-23 | Perforation Treatment Performed - Remedial Casing |
| 2011-02-23 | Well Log Performed |
| 2011-02-24 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-02-25 | Perforation Treatment Performed - Remedial Casing |
| 2011-02-25 | Well Log Performed |
| 2011-02-26 | Perforation Treatment Performed - Cement Plug |
| 2011-02-26 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-27 | Perforation Treatment Performed - Cement Plug |
| 2011-03-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-03-01 | Perforation Treatment Performed - Remedial Casing |
| 2011-04-03 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1980-08-25 | Perforation | 2483.00 | 2484.00 | 7 |
| 2011-02-22 | Packing Device Capped w/Cement | 1592.00 | 1600.00 | 0 |
| 2011-02-23 | Remedial Casing Cementing | 1341.00 | 1342.00 | 0 |
| 2011-02-23 | Packing Device Capped w/Cement | 1301.00 | 1339.00 | 0 |
| 2011-02-24 | Perforation | 921.00 | 922.00 | 17 |
| 2011-02-25 | Remedial Casing Cementing | 921.00 | 922.00 | 0 |
| 2011-02-25 | Packing Device Capped w/Cement | 901.00 | 919.00 | 0 |
| 2011-02-26 | Perforation | 603.70 | 604.70 | 17 |
| 2011-02-26 | Perforation | 525.00 | 526.00 | 17 |
| 2011-02-26 | Perforation | 479.00 | 480.00 | 17 |
| 2011-02-26 | Cement Plug | 531.10 | 622.00 | 0 |
| 1980-08-25 | Perforation | 2490.00 | 2492.50 | 7 |
| 2011-02-27 | Cement Plug | 495.00 | 531.10 | 0 |
| 2011-03-01 | Packing Device Capped w/Cement | 469.00 | 477.00 | 0 |
| 2011-03-01 | Remedial Casing Cementing | 479.00 | 480.00 | 0 |
| 1987-03-21 | Packing Device Capped w/Cement | 2445.00 | 2445.00 | 0 |
| 1987-03-25 | Perforation | 2058.50 | 2059.50 | 13 |
| 1987-03-25 | Perforation | 2026.00 | 2031.00 | 13 |
| 1987-03-28 | Fracture | 2026.00 | 2059.50 | 0 |
| 2011-02-21 | Packing Device Capped w/Cement | 2047.00 | 2055.00 | 0 |
| 2011-02-22 | Packing Device Capped w/Cement | 2012.00 | 2020.00 | 0 |
| 2011-02-22 | Perforation | 1341.00 | 1342.00 | 17 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1980 | 6 | 0.0 | 0.0 | 0.0 |
| 1981 | 3063 | 0.0 | 0.0 | 0.0 |
| 1982 | 8673 | 0.0 | 0.0 | 0.0 |
| 1983 | 8598 | 0.0 | 0.0 | 0.0 |
| 1984 | 7833 | 0.0 | 0.0 | 0.0 |
| 1985 | 7407 | 0.0 | 0.0 | 0.0 |
| 1986 | 5243 | 0.0 | 0.0 | 0.0 |
| 1987 | 55 | 0.0 | 0.0 | 0.0 |
For data sources see[5]