X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335033216000

Well Details

Well ID: 0335033216000
Loading map...
Location: 00/16-32-033-03W5/0
Location Alias: 00/16-32-33-03 W5M
Location Alias 2: 00/16-32-033-03 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 03
Section: 32
County/Municipality: Mountain View County
Well Name: WHITECAP GARR 16-32-33-3
Operator Name: Whitecap Resources Inc.
License Number: 0027268
License Date: 1964-12-02
License Status: Issued
Spud Date: 1964-12-04
Final Drill Date: 1964-12-19
Well Total Depth: 2025.40 m
Surface Hole Latitude: 51.879945
Surface Hole Longitude: -114.383497

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-12-02 Obtained License
1964-12-19 Finished Drilling
1964-12-19 Production Casing Operation Performed
1964-12-19 Well Mode changed to Drilled and Cased
1964-12-20 Perforation Treatment Performed - Selective Jet Perforations
1964-12-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-01-02 Perforation Treatment Performed - Fractured
1965-02-16 Well Began Production
1965-02-16 Well Fluid changed to Crude Oil
1965-02-16 Well Mode changed to Pumping
1970-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-01-25 Perforation Treatment Performed - Acid Wash - No Pressure
1970-01-25 Perforation Treatment Performed - Fractured
1997-10-31 Well Fluid changed to Crude Oil
1997-10-31 Well Mode changed to Suspended
1999-02-01 Well Fluid changed to Crude Oil
1999-02-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-12-20 Selective Jet Perforations 2009.20 2009.50 0
1970-01-25 Fracture 1973.30 2009.50 0
1964-12-20 Selective Jet Perforations 2008.30 2008.90 0
1964-12-20 Selective Jet Perforations 1973.60 1974.20 0
1964-12-20 Selective Jet Perforations 1973.30 1973.30 0
1964-12-30 Acid Treatment 2008.30 2009.50 0
1964-12-31 Acid Treatment 1973.30 1974.20 0
1965-01-02 Fracture 1973.30 2009.50 0
1970-01-25 Acid Wash 1973.30 2009.50 0
1970-01-25 Acid Treatment 1973.30 2009.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6460 0.0 0.0 0.0
1968 4462 0.0 0.0 0.0
1969 786 0.0 0.0 0.0
1970 6168 0.0 0.0 0.0
1971 7396 0.0 0.0 0.0
1972 7868 0.0 0.0 0.0
1973 8116 0.0 0.0 0.0
1974 6479 0.0 0.0 0.0
1975 5983 0.0 0.0 0.0
1976 2856 0.0 0.0 0.0
1979 1452 0.0 0.0 0.0
1980 8089 0.0 0.0 0.0
1981 6741 0.0 0.0 0.0
1982 5228 0.0 0.0 0.0
1983 8317 0.0 0.0 0.0
1984 8066 0.0 0.0 0.0
1985 7938 0.0 0.0 0.0
1986 7784 0.0 0.0 0.0
1987 7584 0.0 0.0 0.0
1988 8663 0.0 0.0 0.0
1989 8595 0.0 0.0 0.0
1990 8747 0.0 0.0 0.0
1991 8675 0.0 0.0 0.0
1992 8259 0.0 0.0 0.0
1993 8628 0.0 0.0 0.0
1994 8623 0.0 0.0 0.0
1995 4140 0.0 0.0 0.0
1996 232 0.0 0.0 0.0
1997 6618 0.0 0.0 0.0
1999 6956 0.0 0.0 0.0
2000 6083 0.0 0.0 0.0
2001 6546 0.0 0.0 0.0
2002 5640 0.0 0.0 0.0
2003 7974 0.0 0.0 0.0
2004 7668 0.0 0.0 0.0
2005 7750 0.0 0.0 0.0
2006 6240 0.0 0.0 0.0
2007 4380 0.0 0.0 0.0
2008 6324 0.0 0.0 0.0
2009 6432 0.0 0.0 0.0
2010 4996 0.0 0.0 0.0
2011 7348 0.0 0.0 0.0
2012 8199 0.0 0.0 0.0
2013 2700 0.0 0.0 0.0
2014 7865 0.0 0.0 0.0
2015 7852 0.0 0.0 0.0
2016 7824 0.0 0.0 0.0
2017 1992 0.0 0.0 0.0
2018 8183 0.0 0.0 0.0
2019 8231 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References