If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0335033402000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.883242,"lon":-114.340832,"icon":""}]} |
Location: 00/02-34-033-03W5/0 | |
Location Alias: 00/02-34-33-03 W5M | |
Location Alias 2: 00/02-34-033-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 5 | |
Range: 03 | |
Section: 34 | |
County/Municipality: Mountain View County | |
Well Name: BACCALIEU HZ HARME 2-34-33-3 | |
Operator Name: Baccalieu Energy Inc. | |
License Number: 0446129 | |
License Date: 2012-05-28 | |
License Status: Issued | |
Spud Date: 2012-07-08 | |
Final Drill Date: 2012-07-19 | |
Well Total Depth: 3391.00 m | |
Surface Hole Latitude: 51.883242 | |
Surface Hole Longitude: -114.340832 |
Date | Event |
---|---|
2012-05-28 | Obtained License |
2012-07-09 | Surface Casing Operation Performed |
2012-07-12 | Direction Drilling Operation Performed - Horizontal |
2012-07-16 | Intermediate Casing Operation Performed |
2012-07-16 | Well Log Performed |
2012-07-19 | Finished Drilling |
2012-07-19 | Well Mode changed to Drilled and Cased |
2012-07-21 | Liner Casing Operation Performed |
2012-07-21 | Perforation Treatment Performed - Open-Hole Completion |
2012-07-22 | Rig Released |
2012-08-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-17 | Well Began Production |
2012-08-17 | Well Fluid changed to Crude Oil |
2012-08-17 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-07-08 | Ensign Drilling Inc. | 544 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-07-12 | 1646.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-07-21 | Open Hole/Barefoot Completion | 3382.00 | 3390.00 | 0 |
2012-08-10 | Multi-Stage Fracture | 2801.20 | 2801.30 | 0 |
2012-08-10 | Multi-Stage Fracture | 2731.00 | 2731.10 | 0 |
2012-08-10 | Multi-Stage Fracture | 2660.70 | 2660.80 | 0 |
2012-08-10 | Multi-Stage Fracture | 2602.20 | 2602.30 | 0 |
2012-08-10 | Multi-Stage Fracture | 2530.70 | 2530.80 | 0 |
2012-08-10 | Multi-Stage Fracture | 2461.40 | 2461.50 | 0 |
2012-08-10 | Multi-Stage Fracture | 2391.00 | 2391.10 | 0 |
2012-08-10 | Multi-Stage Fracture | 2321.30 | 2321.40 | 0 |
2012-08-10 | Multi-Stage Fracture | 2250.70 | 2250.80 | 0 |
2012-08-10 | Multi-Stage Fracture | 2179.90 | 2180.00 | 0 |
2012-08-10 | Multi-Stage Fracture | 3359.50 | 3359.60 | 0 |
2012-08-10 | Multi-Stage Fracture | 2109.20 | 2109.30 | 0 |
2012-08-10 | Multi-Stage Fracture | 2051.20 | 2051.30 | 0 |
2012-08-10 | Multi-Stage Fracture | 3300.90 | 3301.00 | 0 |
2012-08-10 | Multi-Stage Fracture | 3228.80 | 3328.90 | 0 |
2012-08-10 | Multi-Stage Fracture | 3159.10 | 3159.20 | 0 |
2012-08-10 | Multi-Stage Fracture | 3087.20 | 3087.30 | 0 |
2012-08-10 | Multi-Stage Fracture | 3015.80 | 3015.90 | 0 |
2012-08-10 | Multi-Stage Fracture | 2946.10 | 2946.20 | 0 |
2012-08-10 | Multi-Stage Fracture | 2874.40 | 2874.50 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 3071 | 0.0 | 0.0 | 0.0 |
2013 | 8483 | 0.0 | 0.0 | 0.0 |
2014 | 8696 | 0.0 | 0.0 | 0.0 |
2015 | 8729 | 0.0 | 0.0 | 0.0 |
2016 | 8623 | 0.0 | 0.0 | 0.0 |
2017 | 8016 | 0.0 | 0.0 | 0.0 |
2018 | 7544 | 0.0 | 0.0 | 0.0 |
2019 | 8006 | 0.0 | 0.0 | 0.0 |
2020 | 2111 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-22 | No Incident Encountered | 0.00 | 0.00 |
2012-08-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]