X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335052401000

Well Details

Well ID: 0335052401000
Loading map...
Location: 00/01-24-033-05W5/0
Location Alias: 00/01-24-33-05 W5M
Location Alias 2: 00/01-24-033-05 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 05
Section: 24
County/Municipality: Mountain View County
Well Name: NAL CAROL 1-24-33-5
Operator Name: NAL Resources Limited
License Number: 0016341
License Date: 1958-12-01
License Status: Suspension
Spud Date: 1958-12-16
Final Drill Date: 1959-01-17
Well Total Depth: 2788.90 m
Surface Hole Latitude: 51.840456
Surface Hole Longitude: -114.571576

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-12-01 Obtained License
1959-01-17 Finished Drilling
1959-01-17 Well Mode changed to Drilled and Cased
1959-01-19 Drill Stem Test Performed
1959-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-01-21 Perforation Treatment Performed - Acid Wash - No Pressure
1959-01-21 Perforation Treatment Performed - Bullet Perforation
1959-01-21 Production Casing Operation Performed
1959-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-02-14 Well Began Production
1959-02-14 Well Fluid changed to Crude Oil
1959-02-14 Well Mode changed to Flowing
1960-05-28 Well Fluid changed to Crude Oil
1960-05-28 Well Mode changed to Pumping
1984-10-16 Well Log Performed
1984-10-17 Well Log Performed
1984-10-31 Well Log Performed
1994-11-01 Well Fluid changed to Crude Oil
1994-11-01 Well Mode changed to Suspended
2004-03-17 Perforation Treatment Performed - Jet Perforation
2004-03-20 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-01-21 Bullet Perforation 2749.60 2751.10 13
2004-03-17 Perforation 2684.50 2690.00 17
2004-03-20 Fracture 2684.50 2704.00 0
1959-01-21 Bullet Perforation 2753.00 2756.00 13
1959-01-21 Bullet Perforation 2756.60 2756.90 13
1959-01-21 Bullet Perforation 2757.80 2759.40 13
1959-01-21 Bullet Perforation 2760.30 2761.20 13
1959-01-21 Acid Wash 2749.60 2761.20 0
1959-01-21 Acid Treatment 2749.60 2761.20 0
1959-01-26 Acid Treatment 2749.60 2761.20 0
2004-03-17 Perforation 2698.50 2704.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1205 0.0 0.0 0.0
1969 4638 0.0 0.0 0.0
1970 7782 0.0 0.0 0.0
1971 7901 0.0 0.0 0.0
1972 7641 0.0 0.0 0.0
1973 8291 0.0 0.0 0.0
1974 7303 0.0 0.0 0.0
1975 5540 0.0 0.0 0.0
1976 7550 0.0 0.0 0.0
1977 6720 0.0 0.0 0.0
1978 6634 0.0 0.0 0.0
1979 2461 0.0 0.0 0.0
1980 5627 0.0 0.0 0.0
1981 3144 0.0 0.0 0.0
1982 5755 0.0 0.0 0.0
1983 7159 0.0 0.0 0.0
1984 7391 0.0 0.0 0.0
1985 7284 0.0 0.0 0.0
1986 8227 0.0 0.0 0.0
1987 8754 0.0 0.0 0.0
1988 8754 0.0 0.0 0.0
1989 7470 0.0 0.0 0.0
1990 8119 0.0 0.0 0.0
1991 8139 0.0 0.0 0.0
1992 4119 0.0 0.0 0.0
1993 3723 0.0 0.0 0.0
1994 2232 0.0 0.0 0.0

For data sources see[5]

References