If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0335052516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.852516,"lon":-114.582469,"icon":""}]} |
| Location: 00/16-25-033-05W5/0 | |
| Location Alias: 00/16-25-33-05 W5M | |
| Location Alias 2: 00/16-25-033-05 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 033 | |
| Meridian: 5 | |
| Range: 05 | |
| Section: 25 | |
| County/Municipality: Mountain View County | |
| Well Name: NAL CAROL 16-25-33-5 | |
| Operator Name: NAL Resources Limited | |
| License Number: 0449513 | |
| License Date: 2012-10-26 | |
| License Status: Abandoned | |
| Spud Date: 2012-11-18 | |
| Final Drill Date: 2012-12-04 | |
| Well Total Depth: 4011.00 m | |
| Surface Hole Latitude: 51.852516 | |
| Surface Hole Longitude: -114.582469 |
| Date | Event |
|---|---|
| 2012-10-26 | Obtained License |
| 2012-11-20 | Surface Casing Operation Performed |
| 2012-11-23 | Direction Drilling Operation Performed - Deviate |
| 2012-11-25 | Direction Drilling Operation Performed - Horizontal |
| 2012-12-04 | Finished Drilling |
| 2012-12-04 | Well Log Performed |
| 2012-12-04 | Well Mode changed to Drilled and Cased |
| 2012-12-06 | Production Casing Operation Performed |
| 2012-12-07 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-12-07 | Rig Released |
| 2012-12-11 | Well Log Performed |
| 2012-12-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-12-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-12-20 | Well Began Production |
| 2012-12-20 | Well Fluid changed to Crude Oil |
| 2012-12-20 | Well Mode changed to Flowing |
| 2013-05-27 | Well Fluid changed to Crude Oil |
| 2013-05-27 | Well Mode changed to Suspended |
| 2014-10-01 | Well Fluid changed to Crude Oil |
| 2014-10-01 | Well Mode changed to Pumping |
| 2014-10-06 | Well Log Performed |
| 2014-10-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2014-10-08 | Plug Back Performed |
| 2014-10-08 | Well Fluid changed to Crude Oil |
| 2014-10-08 | Well Mode changed to Abandoned Zone |
| 2014-10-23 | Well Abandoned |
| 2014-10-23 | Well Fluid changed to Crude Oil |
| 2014-10-23 | Well Mode changed to Abandoned |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-11-18 | Precision Drilling Corporation | 232 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-11-23 | 1750.40 | Deviate (5 - 79 degrees) |
| 2012-11-25 | 2393.40 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-12-07 | Open Hole/Barefoot Completion | 4007.00 | 4011.00 | 0 |
| 2012-12-16 | Multi-Stage Fracture | 3378.00 | 3378.10 | 0 |
| 2012-12-16 | Multi-Stage Fracture | 3304.90 | 3305.00 | 0 |
| 2012-12-16 | Multi-Stage Fracture | 3064.10 | 3064.20 | 0 |
| 2012-12-17 | Multi-Stage Fracture | 2877.80 | 2877.90 | 0 |
| 2012-12-17 | Multi-Stage Fracture | 2791.50 | 2791.60 | 0 |
| 2012-12-17 | Multi-Stage Fracture | 2705.00 | 2705.10 | 0 |
| 2012-12-17 | Multi-Stage Fracture | 2632.00 | 2632.10 | 0 |
| 2012-12-17 | Multi-Stage Fracture | 2545.20 | 2545.30 | 0 |
| 2014-10-08 | Packing Device Capped w/Cement | 2400.00 | 2409.00 | 0 |
| 2012-12-16 | Multi-Stage Fracture | 2977.40 | 2977.50 | 0 |
| 2012-12-16 | Multi-Stage Fracture | 3875.80 | 3875.90 | 0 |
| 2012-12-16 | Multi-Stage Fracture | 3816.30 | 3816.40 | 0 |
| 2012-12-16 | Multi-Stage Fracture | 3743.30 | 3743.40 | 0 |
| 2012-12-16 | Multi-Stage Fracture | 3670.20 | 3670.30 | 0 |
| 2012-12-16 | Multi-Stage Fracture | 3597.00 | 3597.10 | 0 |
| 2012-12-16 | Multi-Stage Fracture | 3524.00 | 3524.10 | 0 |
| 2012-12-16 | Multi-Stage Fracture | 3451.10 | 3451.20 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 11 | 0.0 | 0.0 | 0.0 |
| 2014 | 168 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-12-07 | No Incident Encountered | 0.00 | 0.00 |
| 2012-12-18 | No Incident Encountered | 0.00 | 0.00 |
| 2014-10-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]