X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335100214000

Well Details

Well ID: 0335100214000
Loading map...
Location: 00/14-02-033-10W5/0
Location Alias: 00/14-02-33-10 W5M
Location Alias 2: 00/14-02-033-10 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 10
Section: 02
County/Municipality: Clearwater County
Well Name: SHELL 29 LIMESTONE 14-2-33-10
Operator Name: Shell Canada Limited
License Number: 0226077
License Date: 1999-09-07
License Status: Amended
Spud Date: 1999-09-18
Final Drill Date: 1999-11-22
Well Total Depth: 4365.00 m
Surface Hole Latitude: 51.797124
Surface Hole Longitude: -115.307511

For data sources see[1][2]

Well History

Date Event
1999-09-07 Obtained License
1999-09-18 Direction Drilling Operation Performed - Deviate
1999-09-24 Surface Casing Operation Performed
1999-10-22 Well Log Performed
1999-10-23 Well Log Performed
1999-10-24 Intermediate Casing Operation Performed
1999-11-22 Finished Drilling
1999-11-22 Well Log Performed
1999-11-27 Well Log Performed
1999-12-02 Production Casing Operation Performed
1999-12-02 Rig Released
1999-12-02 Well Mode changed to Drilled and Cased
2000-01-05 Perforation Treatment Performed - Jet Perforation
2000-01-06 Perforation Treatment Performed - Acid Wash - No Pressure
2000-01-08 Perforation Treatment Performed - Jet Perforation
2000-01-09 Perforation Treatment Performed - Jet Perforation
2000-01-09 Well Began Production
2000-01-09 Well Fluid changed to Gas
2000-01-09 Well Mode changed to Flowing
2000-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-16 Plug Back Performed
2000-01-16 Well Fluid changed to Gas
2000-01-16 Well Mode changed to Abandoned Zone
2000-01-18 Perforation Treatment Performed - Jet Perforation
2000-01-19 Perforation Treatment Performed - Acid Wash - No Pressure
2000-01-20 Perforation Treatment Performed - Fractured
2000-01-21 Perforation Treatment Performed - Jet Perforation
2000-01-23 Perforation Treatment Performed - Fractured
2000-03-30 Well Log Performed
2000-05-16 Perforation Treatment Performed - Jet Perforation
2000-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-09-18 268.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-01-05 Perforation 4248.50 4254.50 13
2000-01-09 Perforation 4102.50 4254.50 13
2000-01-16 Packing Device Capped w/Cement 4076.00 4098.00 0
2000-01-18 Perforation 3695.50 3696.50 13
2000-01-18 Perforation 3648.50 3653.50 13
2000-01-18 Perforation 3655.00 3662.00 13
2000-01-18 Perforation 3686.50 3687.50 13
2000-01-18 Perforation 3644.50 3647.50 13
2000-01-18 Perforation 3582.00 3583.00 13
2000-01-18 Perforation 3635.00 3642.50 13
2000-01-18 Perforation 3616.00 3619.00 13
2000-01-05 Perforation 4229.00 4232.00 13
2000-01-18 Perforation 3601.00 3605.00 13
2000-01-18 Perforation 3585.40 3595.00 13
2000-01-19 Acid Wash 3582.00 3696.50 0
2000-01-20 Fracture 3582.00 3696.50 0
2000-01-21 Perforation 3345.00 3348.00 13
2000-01-21 Perforation 3337.00 3338.50 13
2000-01-21 Perforation 3318.00 3336.00 13
2000-01-21 Perforation 3309.50 3316.50 13
2000-01-21 Perforation 3301.50 3306.00 13
2000-01-21 Perforation 3294.00 3298.50 13
2000-01-05 Perforation 4242.50 4248.50 13
2000-01-23 Fracture 3294.00 3348.00 0
2000-05-16 Perforation 2740.00 2744.00 13
2000-05-16 Perforation 2751.00 2755.00 13
2000-05-16 Perforation 2757.00 2760.00 13
2000-05-16 Perforation 2761.50 2763.50 13
2000-05-16 Perforation 2764.00 2771.00 13
2000-05-16 Perforation 2772.50 2775.00 13
2000-05-16 Perforation 2776.50 2783.50 13
2000-05-16 Perforation 2878.50 2880.00 13
2000-05-16 Perforation 2881.00 2883.50 13
2000-01-05 Perforation 4216.50 4219.00 13
2000-05-16 Perforation 2885.00 2890.00 13
2000-05-16 Perforation 2897.00 2899.00 13
2000-05-16 Perforation 2901.00 2902.50 13
2000-05-18 Acid Treatment 2740.00 2902.50 0
2000-01-05 Perforation 4211.00 4213.00 13
2000-01-06 Acid Wash 4211.00 4254.50 0
2000-01-08 Perforation 4175.50 4177.50 13
2000-01-08 Perforation 4109.70 4140.00 13
2000-01-08 Perforation 4102.50 4107.80 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 52 0.0 0.0 0.0

For data sources see[6]

References