If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0344063613020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.95332,"lon":-110.730476,"icon":""}]} |
| Location: 02/13-36-034-06W4/0 | |
| Location Alias: 02/13-36-34-06 W4M | |
| Location Alias 2: 02/13-36-034-06 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 034 | |
| Meridian: 4 | |
| Range: 06 | |
| Section: 36 | |
| County/Municipality: Special Areas No. 4 | |
| Well Name: HIGH GROUND HZ 02 PROVOST 13-36-34-6 | |
| Operator Name: Tamarack Acquisition Corp. | |
| License Number: 0487452 | |
| License Date: 2017-12-20 | |
| License Status: Issued | |
| Spud Date: 2018-01-10 | |
| Final Drill Date: 2018-01-13 | |
| Well Total Depth: 2285.00 m | |
| Surface Hole Latitude: 51.953320 | |
| Surface Hole Longitude: -110.730476 |
| Date | Event |
|---|---|
| 2017-12-20 | Obtained License |
| 2018-01-11 | Direction Drilling Operation Performed - Deviate |
| 2018-01-11 | Surface Casing Operation Performed |
| 2018-01-12 | Direction Drilling Operation Performed - Horizontal |
| 2018-01-13 | Finished Drilling |
| 2018-01-13 | Well Log Performed |
| 2018-01-13 | Well Mode changed to Drilled and Cased |
| 2018-01-14 | Production Casing Operation Performed |
| 2018-01-14 | Rig Released |
| 2018-01-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-01-27 | Well Began Production |
| 2018-01-27 | Well Fluid changed to Crude Oil |
| 2018-01-27 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2018-01-10 | Bonanza Drilling Inc. | 3 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2018-01-11 | 508.60 | Deviate (5 - 79 degrees) |
| 2018-01-12 | 976.30 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2018-01-24 | Multi-Stage Fracture | 2228.30 | 2228.40 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1966.00 | 1966.10 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1938.20 | 1938.30 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1910.40 | 1910.50 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1882.80 | 1882.90 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1855.40 | 1855.50 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1827.70 | 1827.80 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1800.00 | 1800.10 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1772.20 | 1772.30 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1744.70 | 1744.80 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1716.90 | 1717.00 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 2200.50 | 2200.60 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1689.10 | 1689.20 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1661.40 | 1661.50 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1634.10 | 1634.20 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1593.00 | 1593.10 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1565.60 | 1565.70 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1457.40 | 1457.50 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1429.70 | 1429.80 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1402.00 | 1402.10 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1374.70 | 1374.80 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1347.10 | 1347.20 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 2172.80 | 2172.90 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1319.40 | 1319.50 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1291.60 | 1291.70 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1263.90 | 1264.00 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1236.10 | 1236.20 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1208.30 | 1208.40 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1180.80 | 1180.90 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1153.20 | 1153.30 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1125.50 | 1125.60 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1097.70 | 1097.80 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1070.00 | 1070.10 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 2145.00 | 2145.10 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1042.30 | 1042.40 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 2104.00 | 2104.10 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 2076.50 | 2076.60 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 2048.80 | 2048.90 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 2021.10 | 2021.20 | 0 |
| 2018-01-24 | Multi-Stage Fracture | 1993.40 | 1993.50 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2018-01-24 | 2018-01-24 | 824 | 1,683 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 80.1501 | N/A | |||
| 16/30 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 15.3919 | N/A | ||
| 20/40 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 3.8575 | N/A | ||
| Econocide B1008 (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0096 | N/A | |
| Methyl Alcohol | 67-56-1 | 100 | 0.0096 | N/A | ||||
| Non-Hazardous Ingredients | Not Available | 100 | 0.0096 | N/A | ||||
| SBE-2 (Breaker) | Step Energy Services | Breaker | Non-Hazardous Ingredients | Not Available | 100 | 0.0719 | N/A | |
| Sodium chloride | 7647-14-5 | 100 | 0.0719 | N/A | ||||
| SBX-2 (Crosslinker) | Step Energy Services | Crosslinker | Proprietary | Trade Secret | 100 | 0.0847 | N/A | |
| Water | 7732-18-5 | 100 | 0.0847 | N/A | ||||
| SFR-106 (Friction Reducer) | Step Energy Services | Friction Reducer | Ethoxylated Alcohol | 78330-21-9 | 100 | 0.0333 | N/A | |
| Non-Hazardous Ingredients | Not Available | 100 | 0.0333 | N/A | ||||
| Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.0333 | N/A | ||||
| SWG-101L (Gellant) | Step Energy Services | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.3283 | N/A | |
| Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.3283 | N/A | ||||
| SNE-2 (Non-Emulsifier) | Step Energy Services | Surfactant | 2-Ethylhexanol distillation residue | 68609-68-7 | 100 | 0.0723 | N/A | |
| Dodecylbenzene Sulfonic Acid | 27176-87-0 | 100 | 0.0723 | N/A | ||||
| Methanol | 67-56-1 | 100 | 0.0723 | N/A | ||||
| Monoethanolamine | 141-43-5 | 100 | 0.0723 | N/A | ||||
| Oxirane. methyl-. polymer | 11/6/9003 | 100 | 0.0723 | N/A | ||||
| Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- | 9043-30-5 | 100 | 0.0723 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0723 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2018-01-24 | 2018-01-25 | Groundwater - Saline | 1683 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2018 | 7627 | 0.0 | 0.0 | 0.0 |
| 2019 | 8664 | 0.0 | 0.0 | 0.0 |
| 2020 | 1952 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2018-01-14 | No Incident Encountered | 0.00 | 0.00 |
| 2018-01-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]