X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344121310003

Well Details

Well ID: 0344121310003
Loading map...
Location: 00/10-13-034-12W4/3
Location Alias: 00/10-13-34-12 W4M
Location Alias 2: 00/10-13-034-12 W4/03
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 12
Section: 13
County/Municipality: Special Areas No. 2
Well Name: SOC PROVOST 10-13-34-12
Operator Name: AlphaBow Energy Ltd.
License Number: 0096861
License Date: 1982-07-28
License Status: Issued
Spud Date: 1982-08-22
Final Drill Date: 1982-09-01
Well Total Depth: 1503.00 m
Surface Hole Latitude: 51.919698
Surface Hole Longitude: -111.574783

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-07-28 Obtained License
1982-08-25 Well Log Performed
1982-08-26 Drill Stem Test Performed
1982-08-27 Drill Stem Test Performed
1982-09-01 Finished Drilling
1982-09-01 Well Mode changed to Drilled and Cased
1982-09-02 Well Log Performed
1982-09-04 Drill Stem Test Performed
1982-09-05 Production Casing Operation Performed
1982-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-17 Perforation Treatment Performed - Jet Perforation
1988-10-31 Well Log Performed
1988-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-11-01 Plug Back Performed
1988-11-01 Well Log Performed
1988-11-02 Perforation Treatment Performed - Jet Perforation
1988-11-03 Perforation Treatment Performed - Fractured
1989-09-20 Perforation Treatment Performed - Fractured
2000-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-12-12 Plug Back Performed
2000-12-15 Perforation Treatment Performed - Jet Perforation
2000-12-15 Well Log Performed
2002-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-27 Plug Back Performed
2002-06-27 Well Mode changed to Abandoned Zone
2002-06-28 Perforation Treatment Performed - Jet Perforation
2002-06-28 Well Log Performed
2002-07-01 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-09-17 Perforation 1069.50 1071.50 13
2002-06-27 Packing Device Capped w/Cement 904.00 912.00 0
2002-06-28 Perforation 797.00 801.00 17
2002-07-01 Fracture 797.00 801.00 0
1982-09-17 Acid Treatment 1069.50 1071.50 0
1988-11-01 Packing Device Capped w/Cement 1066.00 1069.00 0
1988-11-02 Perforation 1035.00 1052.00 7
1988-11-02 Perforation 1055.00 1064.00 7
1988-11-03 Fracture 1035.00 1064.00 0
1989-09-20 Fracture 1035.00 1064.00 0
2000-12-12 Packing Device Capped w/Cement 1020.00 1028.00 0
2000-12-15 Perforation 916.00 919.00 17

For data sources see[4]



References