X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344210916002

Well Details

Well ID: 0344210916002
Loading map...
Location: 00/16-09-034-21W4/2
Location Alias: 00/16-09-34-21 W4M
Location Alias 2: 00/16-09-034-21 W4/02
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 21
Section: 09
County/Municipality: Starland County
Well Name: PDVL RUMSEY 16-9-34-21
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0270217
License Date: 2002-05-23
License Status: Suspension
Spud Date: 2002-05-25
Final Drill Date: 2002-05-28
Well Total Depth: 1470.00 m
Surface Hole Latitude: 51.907801
Surface Hole Longitude: -112.915588

For data sources see[1][2]

Well History

Date Event
1987-10-14 Surface Casing Operation Performed
1987-10-21 Production Casing Operation Performed
2002-05-23 Obtained License
2002-05-28 Finished Drilling
2002-05-28 Well Mode changed to Drilled and Cased
2002-05-29 Perforation Treatment Performed - Jet Perforation
2002-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-02 Perforation Treatment Performed - Jet Perforation
2002-06-02 Plug Back Performed
2002-06-02 Well Mode changed to Abandoned Zone
2002-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-03 Plug Back Performed
2002-06-04 Rig Released
2002-11-15 Perforation Treatment Performed - Jet Perforation
2002-11-29 Perforation Treatment Performed - Jet Perforation
2002-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-12-02 Perforation Treatment Performed - Jet Perforation
2002-12-02 Plug Back Performed
2009-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-11 Plug Back Performed
2009-06-26 Perforation Treatment Performed - Jet Perforation
2009-07-02 Perforation Treatment Performed - Fractured
2010-11-29 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-05-29 Perforation 1365.00 1368.00 17
2009-03-11 Packing Device Capped w/Cement 489.00 497.00 0
2009-06-26 Perforation 411.50 416.00 14
2009-06-26 Perforation 404.80 405.50 14
2009-06-26 Perforation 386.50 388.50 14
2009-06-26 Perforation 378.50 379.00 14
2009-06-26 Perforation 366.00 366.60 14
2009-06-26 Perforation 339.00 439.30 14
2009-06-26 Perforation 338.10 438.40 14
2009-06-26 Perforation 335.90 336.80 14
2009-06-26 Perforation 331.90 333.00 14
2002-06-02 Packing Device Capped w/Cement 1352.00 1360.00 0
2009-06-26 Perforation 330.90 331.20 14
2009-06-26 Perforation 328.80 329.50 14
2009-06-26 Perforation 305.00 305.30 14
2009-06-26 Perforation 302.00 304.00 14
2009-06-26 Perforation 300.60 301.10 14
2009-06-26 Perforation 291.70 292.00 14
2009-06-26 Perforation 287.10 287.60 14
2009-06-26 Perforation 280.80 281.20 14
2009-06-26 Perforation 232.40 232.70 14
2009-07-02 Fracture 232.40 416.00 0
2002-06-02 Perforation 1257.00 1259.00 17
2002-06-03 Packing Device Capped w/Cement 1245.00 1253.00 0
2002-11-15 Perforation 532.30 534.00 14
2002-11-15 Perforation 530.00 531.80 14
2002-11-29 Perforation 521.00 524.00 14
2002-12-02 Packing Device Capped w/Cement 519.00 527.00 0
2002-12-02 Perforation 502.00 504.00 14

For data sources see[4]



References