X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344221116000

Well Details

Well ID: 0344221116000
Loading map...
Location: 00/16-11-034-22W4/0
Location Alias: 00/16-11-34-22 W4M
Location Alias 2: 00/16-11-034-22 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 22
Section: 11
County/Municipality: Kneehill County
Well Name: TEAC ELNORA 16-11-34-22
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0218291
License Date: 1998-10-23
License Status: Suspension
Spud Date: 1998-11-29
Final Drill Date: 1998-12-04
Well Total Depth: 1582.00 m
Surface Hole Latitude: 51.909618
Surface Hole Longitude: -113.009468

For data sources see[1][2]

Well History

Date Event
1998-10-23 Obtained License
1998-11-30 Lost Circulation Occurred
1998-11-30 Surface Casing Operation Performed
1998-12-01 Direction Drilling Operation Performed - Deviate
1998-12-04 Finished Drilling
1998-12-05 Well Log Performed
1998-12-06 Production Casing Operation Performed
1998-12-06 Rig Released
1998-12-06 Well Mode changed to Drilled and Cased
1999-01-06 Well Log Performed
1999-02-17 Perforation Treatment Performed - Jet Perforation
1999-02-18 Perforation Treatment Performed - Jet Perforation
1999-02-19 Perforation Treatment Performed - Fractured
1999-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-22 Perforation Treatment Performed - Jet Perforation
1999-09-22 Plug Back Performed
1999-09-22 Well Mode changed to Abandoned Zone
1999-09-24 Perforation Treatment Performed - Fractured
2008-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-21 Plug Back Performed
2009-07-03 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-12-01 790.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-02-17 Perforation 1558.50 1562.00 14
1999-02-18 Perforation 1550.00 1552.00 14
1999-02-18 Perforation 1544.00 1545.00 14
1999-02-18 Perforation 1539.50 1541.00 14
1999-02-19 Fracture 1539.50 1552.00 0
1999-09-22 Packing Device Capped w/Cement 1527.00 1535.00 0
1999-09-22 Perforation 1500.50 1503.00 13
1999-09-24 Fracture 1500.50 1503.00 0
2008-02-21 Packing Device Capped w/Cement 1487.00 1495.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-11-30 Lost Circulation 210.00 214.00

For data sources see[6]

References