If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0344240713020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.908804,"lon":-113.401335,"icon":""}]} |
| Location: 02/13-07-034-24W4/0 | |
| Location Alias: 02/13-07-34-24 W4M | |
| Location Alias 2: 02/13-07-034-24 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 034 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 07 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER 102 HUXLEY 13-7-34-24 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0411288 | |
| License Date: 2009-07-06 | |
| License Status: Issued | |
| Spud Date: 2010-01-05 | |
| Final Drill Date: 2010-01-26 | |
| Well Total Depth: 939.00 m | |
| Surface Hole Latitude: 51.908804 | |
| Surface Hole Longitude: -113.401335 |
| Date | Event |
|---|---|
| 2009-07-06 | Obtained License |
| 2010-01-05 | Surface Casing Operation Performed |
| 2010-01-26 | Finished Drilling |
| 2010-01-26 | Well Mode changed to Drilled and Cased |
| 2010-01-27 | Production Casing Operation Performed |
| 2010-01-27 | Rig Released |
| 2010-02-01 | Well Log Performed |
| 2010-02-10 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-11 | Perforation Treatment Performed - Fractured |
| 2010-02-13 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2010-02-13 | Well Mode changed to Testing |
| 2010-02-22 | Well Began Production |
| 2010-02-22 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2010-02-22 | Well Mode changed to Flowing |
| 2012-04-09 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2012-04-09 | Well Mode changed to Suspended |
| 2012-10-04 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2012-10-04 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-02-10 | Perforation | 612.60 | 613.50 | 16 |
| 2010-02-10 | Perforation | 516.60 | 517.10 | 16 |
| 2010-02-10 | Perforation | 512.10 | 513.10 | 16 |
| 2010-02-10 | Perforation | 480.10 | 480.70 | 16 |
| 2010-02-10 | Perforation | 467.50 | 468.20 | 16 |
| 2010-02-10 | Perforation | 465.20 | 466.20 | 16 |
| 2010-02-10 | Perforation | 458.70 | 459.20 | 16 |
| 2010-02-10 | Perforation | 361.20 | 362.00 | 16 |
| 2010-02-10 | Perforation | 354.30 | 354.80 | 16 |
| 2010-02-10 | Perforation | 350.60 | 351.10 | 16 |
| 2010-02-10 | Perforation | 346.60 | 347.30 | 16 |
| 2010-02-10 | Perforation | 606.80 | 607.80 | 16 |
| 2010-02-10 | Perforation | 342.60 | 343.20 | 16 |
| 2010-02-10 | Perforation | 336.90 | 337.80 | 16 |
| 2010-02-10 | Perforation | 334.20 | 334.70 | 16 |
| 2010-02-10 | Perforation | 303.70 | 304.20 | 16 |
| 2010-02-10 | Perforation | 295.80 | 296.30 | 16 |
| 2010-02-11 | Fracture | 295.80 | 613.50 | 0 |
| 2010-02-10 | Perforation | 598.90 | 602.00 | 16 |
| 2010-02-10 | Perforation | 589.00 | 589.70 | 16 |
| 2010-02-10 | Perforation | 573.60 | 574.20 | 16 |
| 2010-02-10 | Perforation | 534.50 | 536.20 | 16 |
| 2010-02-10 | Perforation | 533.10 | 533.60 | 16 |
| 2010-02-10 | Perforation | 522.50 | 523.40 | 16 |
| 2010-02-10 | Perforation | 519.90 | 521.40 | 16 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 7535 | 0.0 | 0.0 | 0.0 |
| 2011 | 8746 | 0.0 | 0.0 | 0.0 |
| 2012 | 4506 | 0.0 | 0.0 | 0.0 |
| 2013 | 8736 | 0.0 | 0.0 | 0.0 |
| 2014 | 8529 | 0.0 | 0.0 | 0.0 |
| 2015 | 8643 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]