If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0344241516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.92392,"lon":-113.315059,"icon":""}]} |
| Location: 00/16-15-034-24W4/0 | |
| Location Alias: 00/16-15-34-24 W4M | |
| Location Alias 2: 00/16-15-034-24 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 034 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 15 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER HUXLEY 16-15-34-24 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0413482 | |
| License Date: 2009-10-28 | |
| License Status: Amended | |
| Spud Date: 2010-01-04 | |
| Final Drill Date: 2010-01-17 | |
| Well Total Depth: 946.00 m | |
| Surface Hole Latitude: 51.923920 | |
| Surface Hole Longitude: -113.315059 |
| Date | Event |
|---|---|
| 2009-10-28 | Obtained License |
| 2010-01-04 | Lost Circulation Occurred |
| 2010-01-04 | Surface Casing Operation Performed |
| 2010-01-17 | Finished Drilling |
| 2010-01-17 | Well Mode changed to Drilled and Cased |
| 2010-01-18 | Production Casing Operation Performed |
| 2010-01-18 | Rig Released |
| 2010-01-26 | Well Log Performed |
| 2010-02-04 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-08 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-09 | Perforation Treatment Performed - Fractured |
| 2010-02-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2010-02-12 | Well Mode changed to Testing |
| 2010-02-23 | Well Began Production |
| 2010-02-23 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2010-02-23 | Well Mode changed to Flowing |
| 2010-03-23 | Well Log Performed |
| 2012-04-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2012-04-07 | Well Mode changed to Suspended |
| 2012-10-02 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2012-10-02 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-02-04 | Perforation | 889.40 | 890.40 | 13 |
| 2010-02-08 | Perforation | 312.70 | 313.20 | 13 |
| 2010-02-08 | Perforation | 331.50 | 333.00 | 13 |
| 2010-02-08 | Perforation | 394.00 | 394.50 | 13 |
| 2010-02-08 | Perforation | 445.00 | 445.50 | 13 |
| 2010-02-08 | Perforation | 441.40 | 441.90 | 13 |
| 2010-02-08 | Perforation | 437.90 | 438.40 | 13 |
| 2010-02-08 | Perforation | 586.60 | 587.10 | 13 |
| 2010-02-08 | Perforation | 581.70 | 582.20 | 13 |
| 2010-02-08 | Perforation | 573.50 | 575.00 | 13 |
| 2010-02-08 | Perforation | 595.10 | 595.60 | 13 |
| 2010-02-08 | Perforation | 453.50 | 454.00 | 13 |
| 2010-02-08 | Perforation | 592.30 | 592.80 | 13 |
| 2010-02-08 | Perforation | 590.80 | 591.30 | 13 |
| 2010-02-08 | Perforation | 535.00 | 536.00 | 13 |
| 2010-02-08 | Perforation | 524.40 | 524.90 | 13 |
| 2010-02-08 | Perforation | 500.60 | 501.10 | 13 |
| 2010-02-08 | Perforation | 559.50 | 560.50 | 13 |
| 2010-02-08 | Perforation | 545.50 | 546.50 | 13 |
| 2010-02-08 | Perforation | 570.30 | 572.30 | 13 |
| 2010-02-09 | Fracture | 889.40 | 890.40 | 0 |
| 2010-02-09 | Fracture | 331.50 | 333.00 | 0 |
| 2010-02-08 | Perforation | 448.90 | 449.40 | 13 |
| 2010-02-09 | Fracture | 312.70 | 313.20 | 0 |
| 2010-02-09 | Fracture | 590.80 | 595.60 | 0 |
| 2010-02-09 | Fracture | 342.00 | 587.10 | 0 |
| 2010-02-08 | Perforation | 447.00 | 448.50 | 13 |
| 2010-02-08 | Perforation | 457.60 | 458.60 | 13 |
| 2010-02-08 | Perforation | 491.60 | 492.60 | 13 |
| 2010-02-08 | Perforation | 485.80 | 487.30 | 13 |
| 2010-02-08 | Perforation | 471.80 | 472.30 | 13 |
| 2010-02-08 | Perforation | 342.00 | 342.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 7511 | 0.0 | 0.0 | 0.0 |
| 2011 | 8323 | 0.0 | 0.0 | 0.0 |
| 2012 | 4497 | 0.0 | 0.0 | 0.0 |
| 2013 | 8627 | 0.0 | 0.0 | 0.0 |
| 2014 | 8500 | 0.0 | 0.0 | 0.0 |
| 2015 | 8641 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 7680 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2010-01-04 | Lost Circulation | 18.00 | 26.00 |
For data sources see[6]