If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0344242309000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.935802,"lon":-113.293014,"icon":""}]} |
| Location: 00/09-23-034-24W4/0 | |
| Location Alias: 00/09-23-34-24 W4M | |
| Location Alias 2: 00/09-23-034-24 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 034 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 23 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER HUXLEY 9-23-34-24 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0411295 | |
| License Date: 2009-07-07 | |
| License Status: Amended | |
| Spud Date: 2009-09-16 | |
| Final Drill Date: 2009-10-17 | |
| Well Total Depth: 898.00 m | |
| Surface Hole Latitude: 51.935802 | |
| Surface Hole Longitude: -113.293014 |
| Date | Event |
|---|---|
| 2009-07-07 | Obtained License |
| 2009-09-16 | Surface Casing Operation Performed |
| 2009-10-17 | Finished Drilling |
| 2009-10-17 | Production Casing Operation Performed |
| 2009-10-17 | Rig Released |
| 2009-10-17 | Well Mode changed to Drilled and Cased |
| 2009-10-29 | Well Log Performed |
| 2009-11-23 | Perforation Treatment Performed - Jet Perforation |
| 2009-11-28 | Perforation Treatment Performed - Fractured |
| 2009-11-30 | Well Fluid changed to Gas |
| 2009-11-30 | Well Mode changed to Testing |
| 2009-12-12 | Perforation Treatment Performed - Jet Perforation |
| 2009-12-19 | Perforation Treatment Performed - Fractured |
| 2009-12-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2009-12-20 | Well Mode changed to Testing |
| 2010-01-05 | Well Began Production |
| 2010-01-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2010-01-05 | Well Mode changed to Flowing |
| 2012-04-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2012-04-07 | Well Mode changed to Suspended |
| 2012-10-02 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2012-10-02 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-11-23 | Perforation | 586.00 | 587.50 | 13 |
| 2009-12-12 | Perforation | 259.40 | 259.90 | 13 |
| 2009-12-12 | Perforation | 450.00 | 452.50 | 13 |
| 2009-12-12 | Perforation | 231.50 | 233.00 | 13 |
| 2009-12-12 | Perforation | 285.00 | 285.50 | 13 |
| 2009-12-12 | Perforation | 270.90 | 271.40 | 13 |
| 2009-12-12 | Perforation | 260.50 | 261.00 | 13 |
| 2009-12-12 | Perforation | 429.30 | 430.30 | 13 |
| 2009-12-12 | Perforation | 529.60 | 530.10 | 13 |
| 2009-12-12 | Perforation | 523.00 | 524.00 | 13 |
| 2009-12-12 | Perforation | 521.10 | 521.60 | 13 |
| 2009-11-28 | Fracture | 586.00 | 587.50 | 0 |
| 2009-12-12 | Perforation | 545.00 | 545.50 | 13 |
| 2009-12-12 | Perforation | 539.40 | 539.90 | 13 |
| 2009-12-12 | Perforation | 536.10 | 537.10 | 13 |
| 2009-12-12 | Perforation | 482.80 | 483.30 | 13 |
| 2009-12-12 | Perforation | 448.40 | 448.90 | 13 |
| 2009-12-12 | Perforation | 437.50 | 438.00 | 13 |
| 2009-12-12 | Perforation | 492.90 | 493.90 | 13 |
| 2009-12-12 | Perforation | 519.50 | 520.00 | 13 |
| 2009-12-12 | Perforation | 509.00 | 509.50 | 13 |
| 2009-12-19 | Fracture | 231.50 | 452.50 | 0 |
| 2009-12-12 | Perforation | 390.00 | 390.50 | 13 |
| 2009-12-19 | Fracture | 259.00 | 524.00 | 0 |
| 2009-12-19 | Fracture | 529.60 | 545.50 | 0 |
| 2009-12-12 | Perforation | 385.90 | 386.40 | 13 |
| 2009-12-12 | Perforation | 327.90 | 328.40 | 13 |
| 2009-12-12 | Perforation | 408.50 | 409.00 | 13 |
| 2009-12-12 | Perforation | 402.90 | 403.40 | 13 |
| 2009-12-12 | Perforation | 393.00 | 395.00 | 13 |
| 2009-12-12 | Perforation | 326.50 | 327.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 44 | 0.0 | 0.0 | 0.0 |
| 2010 | 8663 | 0.0 | 0.0 | 0.0 |
| 2011 | 8275 | 0.0 | 0.0 | 0.0 |
| 2012 | 4493 | 0.0 | 0.0 | 0.0 |
| 2013 | 8627 | 0.0 | 0.0 | 0.0 |
| 2014 | 8500 | 0.0 | 0.0 | 0.0 |
| 2015 | 8641 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 7680 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]