If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0344242314020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.938705,"lon":-113.303028,"icon":""}]} |
| Location: 02/14-23-034-24W4/0 | |
| Location Alias: 02/14-23-34-24 W4M | |
| Location Alias 2: 02/14-23-034-24 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 034 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 23 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER 102 HUXLEY 14-23-34-24 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0411376 | |
| License Date: 2009-07-10 | |
| License Status: Amended | |
| Spud Date: 2009-09-16 | |
| Final Drill Date: 2009-10-14 | |
| Well Total Depth: 904.00 m | |
| Surface Hole Latitude: 51.938705 | |
| Surface Hole Longitude: -113.303028 |
| Date | Event |
|---|---|
| 2009-07-10 | Obtained License |
| 2009-09-16 | Surface Casing Operation Performed |
| 2009-10-14 | Finished Drilling |
| 2009-10-14 | Production Casing Operation Performed |
| 2009-10-14 | Rig Released |
| 2009-10-14 | Well Mode changed to Drilled and Cased |
| 2009-10-29 | Well Log Performed |
| 2009-11-23 | Perforation Treatment Performed - Jet Perforation |
| 2009-11-25 | Perforation Treatment Performed - Jet Perforation |
| 2009-11-29 | Perforation Treatment Performed - Fractured |
| 2009-11-30 | Well Fluid changed to Gas |
| 2009-11-30 | Well Mode changed to Testing |
| 2009-12-12 | Perforation Treatment Performed - Jet Perforation |
| 2009-12-13 | Perforation Treatment Performed - Fractured |
| 2009-12-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2009-12-17 | Well Mode changed to Testing |
| 2009-12-22 | Well Began Production |
| 2009-12-22 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2009-12-22 | Well Mode changed to Flowing |
| 2012-04-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2012-04-07 | Well Mode changed to Suspended |
| 2012-10-02 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2012-10-02 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-11-23 | Perforation | 599.00 | 601.00 | 13 |
| 2009-12-12 | Perforation | 297.40 | 298.40 | 13 |
| 2009-12-12 | Perforation | 217.00 | 218.00 | 13 |
| 2009-12-12 | Perforation | 352.50 | 354.00 | 13 |
| 2009-12-12 | Perforation | 272.00 | 273.00 | 13 |
| 2009-12-12 | Perforation | 275.00 | 276.00 | 13 |
| 2009-12-12 | Perforation | 265.50 | 267.50 | 13 |
| 2009-12-12 | Perforation | 235.20 | 236.20 | 13 |
| 2009-12-12 | Perforation | 511.00 | 512.00 | 13 |
| 2009-12-12 | Perforation | 497.90 | 498.90 | 13 |
| 2009-12-12 | Perforation | 487.50 | 488.50 | 13 |
| 2009-11-25 | Perforation | 599.00 | 601.00 | 13 |
| 2009-12-12 | Perforation | 536.80 | 538.30 | 13 |
| 2009-12-12 | Perforation | 532.80 | 533.80 | 13 |
| 2009-12-12 | Perforation | 524.90 | 527.40 | 13 |
| 2009-12-12 | Perforation | 455.00 | 456.00 | 13 |
| 2009-12-12 | Perforation | 412.50 | 413.50 | 13 |
| 2009-12-12 | Perforation | 409.70 | 410.70 | 13 |
| 2009-12-12 | Perforation | 402.90 | 403.90 | 13 |
| 2009-12-12 | Perforation | 442.50 | 443.00 | 13 |
| 2009-12-12 | Perforation | 444.30 | 445.30 | 13 |
| 2009-12-12 | Perforation | 439.30 | 440.30 | 13 |
| 2009-11-29 | Fracture | 599.00 | 601.00 | 0 |
| 2009-12-13 | Fracture | 272.00 | 354.00 | 0 |
| 2009-12-13 | Fracture | 217.00 | 538.30 | 0 |
| 2009-12-12 | Perforation | 391.30 | 391.80 | 13 |
| 2009-12-12 | Perforation | 378.00 | 378.50 | 13 |
| 2009-12-12 | Perforation | 349.00 | 350.00 | 13 |
| 2009-12-12 | Perforation | 398.50 | 400.00 | 13 |
| 2009-12-12 | Perforation | 396.80 | 397.30 | 13 |
| 2009-12-12 | Perforation | 393.50 | 394.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 287 | 0.0 | 0.0 | 0.0 |
| 2010 | 8759 | 0.0 | 0.0 | 0.0 |
| 2011 | 8275 | 0.0 | 0.0 | 0.0 |
| 2012 | 4493 | 0.0 | 0.0 | 0.0 |
| 2013 | 8627 | 0.0 | 0.0 | 0.0 |
| 2014 | 8500 | 0.0 | 0.0 | 0.0 |
| 2015 | 8641 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 7680 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]