X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0345012015000

Well Details

Well ID: 0345012015000
Loading map...
Location: 00/15-20-034-01W5/0
Location Alias: 00/15-20-34-01 W5M
Location Alias 2: 00/15-20-034-01 W5/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 5
Range: 01
Section: 20
County/Municipality: Red Deer County
Well Name: HB INNISFAIL 15-20-34-1
Operator Name: BP Canada Energy Group ULC
License Number: 0020316
License Date: 1961-01-24
License Status: RecCertified
Spud Date: 1961-02-05
Final Drill Date: 1961-03-22
Well Total Depth: 2629.80 m
Surface Hole Latitude: 51.939157
Surface Hole Longitude: -114.105398

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-01-24 Obtained License
1961-02-26 Drill Stem Test Performed
1961-03-01 Perforation Treatment Performed - Open-Hole Completion
1961-03-01 Production Casing Operation Performed
1961-03-22 Finished Drilling
1961-03-22 Well Mode changed to Drilled and Cased
1961-03-24 Drill Stem Test Performed
1961-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-04-02 Well Began Production
1961-04-02 Well Fluid changed to Crude Oil
1961-04-02 Well Mode changed to Flowing
1961-05-10 Well Fluid changed to Crude Oil
1961-05-10 Well Mode changed to Pumping
1961-05-26 Perforation Treatment Performed - Jet Perforation
1961-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-10-13 Perforation Treatment Performed - Cement Plug
1965-10-19 Well Abandoned
1965-10-19 Well Fluid changed to Crude Oil
1965-10-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-03-01 Open Hole/Barefoot Completion 2627.70 2629.80 0
1961-03-28 Acid Treatment 2627.70 2629.80 0
1961-05-26 Perforation 2628.00 2629.50 7
1961-06-07 Acid Treatment 2627.70 2629.80 0
1965-10-13 Cement Plug 2594.50 2628.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References