If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0345050201000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/01-02-034-05W5/0 | |
Location Alias: 00/01-02-34-05 W5M | |
Location Alias 2: 00/01-02-034-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 5 | |
Range: 05 | |
Section: 02 | |
County/Municipality: Mountain View County | |
Well Name: DEKALB CREE SUNDRE 1-2-34-5 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0016809 | |
License Date: 1959-03-05 | |
License Status: RecCertified | |
Spud Date: 1959-03-14 | |
Final Drill Date: 1959-05-09 | |
Well Total Depth: 2755.10 m | |
Surface Hole Latitude: 51.883953 | |
Surface Hole Longitude: -114.595655 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1959-03-05 | Obtained License |
1959-05-09 | Finished Drilling |
1959-05-09 | Well Mode changed to Drilled and Cased |
1959-05-13 | Production Casing Operation Performed |
1959-05-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-05-15 | Perforation Treatment Performed - Acid Wash - No Pressure |
1959-05-15 | Perforation Treatment Performed - Jet Perforation |
1959-05-16 | Well Began Production |
1959-05-16 | Well Fluid changed to Crude Oil |
1959-05-16 | Well Mode changed to Flowing |
1959-07-27 | Perforation Treatment Performed - Bullet Perforation |
1959-07-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-07-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1959-09-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-11-16 | Well Fluid changed to Crude Oil |
1959-11-16 | Well Mode changed to Pumping |
1960-08-11 | Perforation Treatment Performed - Cement Squeeze |
1960-08-12 | Perforation Treatment Performed - Jet Perforation |
1960-08-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1960-08-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1972-11-15 | Well Began Injection |
1972-11-15 | Well Fluid changed to Water |
1972-11-15 | Well Type changed to Injection |
1981-09-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-09-18 | Well Abandoned |
1981-09-18 | Well Fluid changed to Water |
1981-09-18 | Well Mode changed to Abandoned |
1981-09-18 | Well Type changed to Injection |
1981-09-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1959-05-15 | Perforation | 2704.20 | 2717.30 | 13 |
1959-07-28 | Acid Treatment | 2687.10 | 2717.30 | 0 |
1959-07-29 | Acid Treatment | 2687.10 | 2717.30 | 0 |
1959-09-29 | Packing Device Capped w/Cement | 2704.20 | 2717.30 | 0 |
1959-09-29 | Packing Device Capped w/Cement | 2698.10 | 2700.50 | 0 |
1959-09-30 | Acid Treatment | 2687.10 | 2695.00 | 0 |
1960-08-11 | Cement Squeeze | 2687.10 | 2695.00 | 0 |
1960-08-12 | Perforation | 2685.60 | 2694.70 | 13 |
1960-08-12 | Perforation | 2685.90 | 2686.20 | 13 |
1960-08-12 | Perforation | 2687.70 | 2689.30 | 13 |
1960-08-12 | Perforation | 2689.60 | 2689.90 | 13 |
1959-05-15 | Acid Wash | 2704.20 | 2717.30 | 0 |
1960-08-12 | Perforation | 2691.40 | 2691.70 | 13 |
1960-08-12 | Perforation | 2692.90 | 2693.20 | 13 |
1960-08-12 | Perforation | 2694.10 | 2694.70 | 13 |
1960-08-13 | Acid Treatment | 2685.60 | 2694.70 | 0 |
1960-08-14 | Acid Treatment | 2685.60 | 2694.70 | 0 |
1981-09-18 | Packing Device Capped w/Cement | 2673.00 | 2673.00 | 0 |
1981-09-22 | Packing Device Capped w/Cement | 35.00 | 35.00 | 0 |
1959-05-15 | Acid Treatment | 2704.20 | 2717.30 | 0 |
1959-07-27 | Bullet Perforation | 2687.10 | 2688.90 | 13 |
1959-07-27 | Bullet Perforation | 2689.60 | 2690.20 | 13 |
1959-07-27 | Bullet Perforation | 2691.10 | 2692.60 | 13 |
1959-07-27 | Bullet Perforation | 2693.50 | 2695.00 | 13 |
1959-07-27 | Bullet Perforation | 2698.10 | 2700.50 | 13 |
1959-07-28 | Acid Treatment | 2687.10 | 2717.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 0 | 0.0 | 0.0 | 0.0 |
1973 | 0 | 0.0 | 0.0 | 0.0 |
1974 | 0 | 0.0 | 0.0 | 0.0 |
1975 | 0 | 0.0 | 0.0 | 0.0 |
1976 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 0 | 0.0 | 0.0 | 0.0 |
1978 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]