If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354031108020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.99878,"lon":-110.318421,"icon":""}]} |
Location: 02/08-11-035-03W4/0 | |
Location Alias: 02/08-11-35-03 W4M | |
Location Alias 2: 02/08-11-035-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 03 | |
Section: 11 | |
County/Municipality: Special Areas No. 4 | |
Well Name: HIGH GROUND HZ 102 PROVOST 8-11-35-3 | |
Operator Name: Karve Energy Inc. | |
License Number: 0479709 | |
License Date: 2016-06-21 | |
License Status: Issued | |
Spud Date: 2016-07-30 | |
Final Drill Date: 2016-08-01 | |
Well Total Depth: 1800.00 m | |
Surface Hole Latitude: 51.998780 | |
Surface Hole Longitude: -110.318421 |
Date | Event |
---|---|
2016-06-21 | Obtained License |
2016-07-31 | Direction Drilling Operation Performed - Deviate |
2016-07-31 | Surface Casing Operation Performed |
2016-08-01 | Direction Drilling Operation Performed - Horizontal |
2016-08-01 | Finished Drilling |
2016-08-01 | Well Log Performed |
2016-08-01 | Well Mode changed to Drilled and Cased |
2016-08-02 | Production Casing Operation Performed |
2016-08-02 | Rig Released |
2016-08-24 | Well Log Performed |
2016-09-01 | Well Began Production |
2016-09-01 | Well Fluid changed to Crude Oil |
2016-09-01 | Well Mode changed to Pumping |
2016-09-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-09-03 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-07-30 | Bonanza Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-07-31 | 508.00 | Deviate (5 - 79 degrees) |
2016-08-01 | 859.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-09-02 | Multi-Stage Fracture | 1765.40 | 1765.50 | 0 |
2016-09-03 | Multi-Stage Fracture | 1487.60 | 1487.70 | 0 |
2016-09-03 | Multi-Stage Fracture | 1442.90 | 1443.00 | 0 |
2016-09-03 | Multi-Stage Fracture | 1398.00 | 1398.10 | 0 |
2016-09-03 | Multi-Stage Fracture | 1355.50 | 1355.60 | 0 |
2016-09-03 | Multi-Stage Fracture | 1324.20 | 1324.30 | 0 |
2016-09-03 | Multi-Stage Fracture | 1293.30 | 1293.40 | 0 |
2016-09-03 | Multi-Stage Fracture | 1264.20 | 1264.30 | 0 |
2016-09-03 | Multi-Stage Fracture | 1232.70 | 1232.80 | 0 |
2016-09-03 | Multi-Stage Fracture | 1201.40 | 1201.50 | 0 |
2016-09-03 | Multi-Stage Fracture | 1170.80 | 1170.90 | 0 |
2016-09-02 | Multi-Stage Fracture | 1749.10 | 1749.20 | 0 |
2016-09-03 | Multi-Stage Fracture | 1139.60 | 1139.70 | 0 |
2016-09-03 | Multi-Stage Fracture | 1096.10 | 1096.20 | 0 |
2016-09-03 | Multi-Stage Fracture | 941.80 | 941.90 | 0 |
2016-09-03 | Multi-Stage Fracture | 910.20 | 910.30 | 0 |
2016-09-03 | Multi-Stage Fracture | 1717.60 | 1717.70 | 0 |
2016-09-03 | Multi-Stage Fracture | 1686.50 | 1686.60 | 0 |
2016-09-03 | Multi-Stage Fracture | 1655.10 | 1655.20 | 0 |
2016-09-03 | Multi-Stage Fracture | 1623.80 | 1623.90 | 0 |
2016-09-03 | Multi-Stage Fracture | 1592.50 | 1592.60 | 0 |
2016-09-03 | Multi-Stage Fracture | 1557.00 | 1557.10 | 0 |
2016-09-03 | Multi-Stage Fracture | 1532.80 | 1532.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-09-02 | 2016-09-03 | 754 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water - KCL ( 5%) | Not Available | 100 | 76.0952 | N/A | |||
Sand (16/30) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 21.6098 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 21.6098 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 21.6098 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 21.6097 | N/A | ||||
Sand (20/40) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 3.599 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 3.599 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 3.599 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 3.5989 | N/A | ||||
BioClear 1000 | Canyon Technical Services | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano- | 10222-01-2 | 100 | 0.0092 | N/A | |
Tolcide PS75LT | Canyon Technical Services | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0107 | N/A | |
Water | 7732-18-5 | 100 | 0.0107 | N/A | ||||
CAN-2300 Breaker (Enzyme HpH) | Canyon Technical Services | Breaker | Cellulase Enzyme Solution | Not Available | 100 | 0.0169 | N/A | |
CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.075 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.075 | N/A | ||||
CAN-2200 Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.1513 | N/A | |
Monoethanolamine | 141-43-5 | 100 | 0.1513 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1513 | N/A | ||||
CAN-2413 Non-emulsifier | Canyon Technical Services | Demulsifier | Isopropyl Alcohol | 67-63-0 | 100 | 0.0371 | N/A | |
Methanol | 67-56-1 | 100 | 0.0371 | N/A | ||||
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0371 | N/A | ||||
Sulfonic Acids (Petroleum) | 61789-85-3 | 100 | 0.0371 | N/A | ||||
CAN-4005 Tubular Lubricant | Canyon Technical Services | Friction Reducer | Fatty Acids. Tall Oil. Sulfurized Methyl Esters | 68440-27-7 | 100 | 0.0013 | N/A | |
Sweetened Middle Distillate | 64742-47-8 | 100 | 0.0013 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0013 | N/A | ||||
CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.469 | N/A | |
paraFLO 2 | Canyon Technical Services | Scale Inhibitor | Non-hazardous base ingredient(s) | Not Available | 100 | 0.1171 | N/A | |
Silica. crystalline-quartz | 14808-60-7 | 100 | 0.1171 | N/A | ||||
White mineral oil | 8042-47-5 | 100 | 0.1171 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-09-03 | 2016-09-03 | Surface Water - Runoff | 499 |
2016-09-03 | 2016-09-03 | Surface Water - Runoff | 377 |
2016-09-03 | 2016-09-03 | Surface Water - Runoff | 84 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 1792 | 0.0 | 0.0 | 0.0 |
2017 | 8375 | 0.0 | 0.0 | 0.0 |
2018 | 8230 | 0.0 | 0.0 | 0.0 |
2019 | 8646 | 0.0 | 0.0 | 0.0 |
2020 | 1972 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-08-02 | No Incident Encountered | 0.00 | 0.00 |
2016-08-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]