If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354082903020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.042607,"lon":-111.114911,"icon":""}]} |
Location: 02/03-29-035-08W4/0 | |
Location Alias: 02/03-29-35-08 W4M | |
Location Alias 2: 02/03-29-035-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 08 | |
Section: 29 | |
County/Municipality: Special Areas No. 4 | |
Well Name: KARVE 102 HZ PROVOST 3-29-35-8 | |
Operator Name: Karve Energy Inc. | |
License Number: 0482249 | |
License Date: 2017-01-06 | |
License Status: Amended | |
Spud Date: 2017-03-01 | |
Final Drill Date: 2017-03-04 | |
Well Total Depth: 2437.00 m | |
Surface Hole Latitude: 52.042607 | |
Surface Hole Longitude: -111.114911 |
Date | Event |
---|---|
2017-01-06 | Obtained License |
2017-03-01 | Surface Casing Operation Performed |
2017-03-03 | Direction Drilling Operation Performed - Deviate |
2017-03-03 | Direction Drilling Operation Performed - Horizontal |
2017-03-04 | Finished Drilling |
2017-03-04 | Well Log Performed |
2017-03-04 | Well Mode changed to Drilled and Cased |
2017-03-05 | Production Casing Operation Performed |
2017-03-06 | Rig Released |
2017-04-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-04-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-04-08 | Well Began Production |
2017-04-08 | Well Fluid changed to Crude Oil |
2017-04-08 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-03-01 | Ensign Drilling Inc. | 348 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-03-03 | 639.00 | Deviate (5 - 79 degrees) |
2017-03-03 | 1001.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-04-02 | Multi-Stage Fracture | 2132.40 | 2132.50 | 0 |
2017-04-02 | Multi-Stage Fracture | 1782.00 | 1782.10 | 0 |
2017-04-02 | Multi-Stage Fracture | 1756.10 | 1756.20 | 0 |
2017-04-02 | Multi-Stage Fracture | 1718.60 | 1718.70 | 0 |
2017-04-02 | Multi-Stage Fracture | 1682.50 | 1682.60 | 0 |
2017-04-02 | Multi-Stage Fracture | 1645.80 | 1645.90 | 0 |
2017-04-02 | Multi-Stage Fracture | 1592.00 | 1592.10 | 0 |
2017-04-02 | Multi-Stage Fracture | 1498.30 | 1498.40 | 0 |
2017-04-02 | Multi-Stage Fracture | 1460.70 | 1460.80 | 0 |
2017-04-02 | Multi-Stage Fracture | 1423.70 | 1423.80 | 0 |
2017-04-02 | Multi-Stage Fracture | 1386.10 | 1386.20 | 0 |
2017-04-02 | Multi-Stage Fracture | 2106.80 | 2106.90 | 0 |
2017-04-02 | Multi-Stage Fracture | 1204.30 | 1204.40 | 0 |
2017-04-02 | Multi-Stage Fracture | 1179.30 | 1179.40 | 0 |
2017-04-02 | Multi-Stage Fracture | 1143.00 | 1143.10 | 0 |
2017-04-02 | Multi-Stage Fracture | 1100.00 | 1100.10 | 0 |
2017-04-03 | Multi-Stage Fracture | 1045.00 | 1045.10 | 0 |
2017-04-02 | Multi-Stage Fracture | 2069.80 | 2069.90 | 0 |
2017-04-02 | Multi-Stage Fracture | 2043.90 | 2044.00 | 0 |
2017-04-02 | Multi-Stage Fracture | 2006.40 | 2006.50 | 0 |
2017-04-02 | Multi-Stage Fracture | 1968.80 | 1968.90 | 0 |
2017-04-02 | Multi-Stage Fracture | 1931.40 | 1931.50 | 0 |
2017-04-02 | Multi-Stage Fracture | 1893.90 | 1894.00 | 0 |
2017-04-02 | Multi-Stage Fracture | 1819.50 | 1819.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-04-02 | 2017-04-03 | 879 | 964 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 74.8937 | N/A | |||
16/30 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 15.5157 | N/A | ||
20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 9.5905 | N/A | ||
ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0111 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0111 | N/A | ||||
ELEGB-2 | Element | Breaker | Ethylene Glycol 80/20 | 107-21-1 | 100 | 0 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0 | N/A | ||||
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.1445 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.1445 | N/A | ||||
ELEBX-2 | Element | Crosslinker | Boric acid. sodium salt | 1333-73-9 | 100 | 0.0926 | N/A | |
Ethylene glycol | 107-21-1 | 100 | 0.0926 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0926 | N/A | ||||
ELEWG-12 | Element | Gelling Agent | Distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.2965 | N/A | |
Guar | 9000-30-0 | 100 | 0.2965 | N/A | ||||
Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.2965 | N/A | ||||
Poly(oxy-1.2-ethanediyl).alpha-(4-nonylphenyl)-omega-hydroxy-.branche d |
127087-87-0 | 100 | 0.2965 | N/A | ||||
ELEFE-1 IFTR | Element | Surfactant | Alcohols. C9-11. ethoxylated | 68439-46-3 | 100 | 0.0593 | N/A | |
Methanol | 67-56-1 | 100 | 0.0593 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0593 | N/A | ||||
Poly(oxy-1.2-ethanediyl). alpha-undecyl-omega-hydroxy- | 34398-01-1 | 100 | 0.0593 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-03-20 | 2017-03-20 | Municipal Water | 850 |
2017-03-20 | 2017-03-20 | Central Water Distribution Facility | 150 |
2017-03-20 | 2017-03-20 | Central Water Distribution Facility | 140 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 6407 | 0.0 | 0.0 | 0.0 |
2018 | 8591 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-03-06 | No Incident Encountered | 0.00 | 0.00 |
2017-04-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]