X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354090103020

Well Details

Well ID: 0354090103020
Loading map...
Location: 02/03-01-035-09W4/0
Location Alias: 02/03-01-35-09 W4M
Location Alias 2: 02/03-01-035-09 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 09
Section: 01
County/Municipality: Special Areas No. 4
Well Name: KARVE 102 HZ PROVOST 3-1-35-9
Operator Name: Karve Energy Inc.
License Number: 0491354
License Date: 2018-10-09
License Status: Issued
Spud Date: 2018-11-14
Final Drill Date: 2018-11-16
Well Total Depth: 1890.00 m
Surface Hole Latitude: 51.972698
Surface Hole Longitude: -111.145525

For data sources see[1][2]

Well History

Date Event
2018-10-09 Obtained License
2018-11-15 Direction Drilling Operation Performed - Deviate
2018-11-15 Surface Casing Operation Performed
2018-11-16 Direction Drilling Operation Performed - Horizontal
2018-11-16 Finished Drilling
2018-11-16 Well Log Performed
2018-11-16 Well Mode changed to Drilled and Cased
2018-11-17 Production Casing Operation Performed
2018-11-17 Rig Released
2019-05-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-01 Well Began Production
2019-06-01 Well Fluid changed to Crude Oil
2019-06-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-11-14 Ensign Drilling Inc. 348 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-11-15 514.00 Deviate (5 - 79 degrees)
2018-11-16 1029.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-05-18 Multi-Stage Fracture 1829.10 1829.20 0
2019-05-18 Multi-Stage Fracture 1469.10 1469.20 0
2019-05-18 Multi-Stage Fracture 1433.00 1433.10 0
2019-05-18 Multi-Stage Fracture 1397.00 1397.10 0
2019-05-18 Multi-Stage Fracture 1361.00 1361.10 0
2019-05-18 Multi-Stage Fracture 1324.90 1325.00 0
2019-05-18 Multi-Stage Fracture 1289.00 1289.10 0
2019-05-18 Multi-Stage Fracture 1253.30 1253.40 0
2019-05-18 Multi-Stage Fracture 1217.30 1217.40 0
2019-05-18 Multi-Stage Fracture 1181.20 1181.30 0
2019-05-18 Multi-Stage Fracture 1145.20 1145.30 0
2019-05-18 Multi-Stage Fracture 1793.10 1793.20 0
2019-05-18 Multi-Stage Fracture 1109.20 1109.30 0
2019-05-18 Multi-Stage Fracture 1084.90 1085.00 0
2019-05-18 Multi-Stage Fracture 1757.00 1757.10 0
2019-05-18 Multi-Stage Fracture 1721.00 1721.10 0
2019-05-18 Multi-Stage Fracture 1649.10 1649.20 0
2019-05-18 Multi-Stage Fracture 1613.10 1613.20 0
2019-05-18 Multi-Stage Fracture 1577.10 1577.20 0
2019-05-18 Multi-Stage Fracture 1541.10 1541.20 0
2019-05-18 Multi-Stage Fracture 1505.10 1505.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-05-18 2019-05-18 904 754 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 72.781 N/A
16/30 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 26.3824 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0101 N/A
Methyl Alcohol 67-56-1 100 0.0101 N/A
Non-Hazardous Ingredients Not Available 100 0.0101 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.0705 N/A
Sodium chloride 7647-14-5 100 0.0705 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.1038 N/A
Non-Hazardous Ingredients Not Available 100 0.1038 N/A
SBX-2 (Crosslinker) Step Energy Services Crosslinker Proprietary Trade Secret 100 0.1091 N/A
Water 7732-18-5 100 0.1091 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.0511 N/A
Non-Hazardous Ingredients Not Available 100 0.0511 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0511 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.3516 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.3516 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.14 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.14 N/A
Methanol 67-56-1 100 0.14 N/A
Monoethanolamine 141-43-5 100 0.14 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.14 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.14 N/A
Water 7732-18-5 100 0.14 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-04-29 2019-04-29 Municipal Water 319
2019-04-29 2019-04-29 Municipal Water 356
2019-04-29 2019-04-29 Central Water Distribution Facility 107
2019-04-29 2019-04-29 Central Water Distribution Facility 21
2019-04-29 2019-04-29 Central Water Distribution Facility 21
2019-04-29 2019-04-29 Central Water Distribution Facility 29
2019-04-29 2019-04-29 Central Water Distribution Facility 39
2019-04-29 2019-04-29 Central Water Distribution Facility 43

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 4971 0.0 0.0 0.0
2020 1949 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-11-17 No Incident Encountered 0.00 0.00
2019-05-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References