X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354093212000

Well Details

Well ID: 0354093212000
Loading map...
Location: 00/12-32-035-09W4/0
Location Alias: 00/12-32-35-09 W4M
Location Alias 2: 00/12-32-035-09 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 09
Section: 32
County/Municipality: County of Paintearth No. 18
Well Name: AD ASTRA ET AL HAMMIL 12-32-35-9
Operator Name: Consolidated Ad Astra Minerals Ltd.
License Number: 0036023
License Date: 1969-03-13
License Status: RecCertified
Spud Date: 1969-03-18
Final Drill Date: 1969-03-25
Well Total Depth: 926.60 m
Surface Hole Latitude: 52.050509
Surface Hole Longitude: -111.263309

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-03-13 Obtained License
1969-03-25 Finished Drilling
1969-03-26 Production Casing Operation Performed
1970-09-04 Well Mode changed to Drilled and Cased
1970-11-21 Perforation Treatment Performed - Jet Perforation
1977-12-14 Well Began Production
1977-12-14 Well Fluid changed to Gas
1977-12-14 Well Mode changed to Flowing
1978-03-09 Perforation Treatment Performed - Alcohol Squeeze
1983-12-31 Well Fluid changed to Gas
1983-12-31 Well Mode changed to Suspended
1991-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-08-26 Perforation Treatment Performed - Jet Perforation
1991-08-26 Plug Back Performed
1991-08-26 Well Fluid changed to Gas
1991-08-26 Well Log Performed
1991-08-26 Well Mode changed to Abandoned
1991-08-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-11-21 Perforation 895.80 896.70 7
1970-11-21 Perforation 897.30 898.60 7
1970-11-21 Perforation 902.80 904.60 7
1978-03-09 Alchohol Squeeze 895.80 904.60 0
1991-08-26 Packing Device Capped w/Cement 883.00 891.00 0
1991-08-26 Perforation 279.00 280.00 13
1991-08-26 Packing Device Capped w/Cement 265.00 273.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 452 0.0 0.0 0.0
1978 8519 0.0 0.0 0.0
1979 8592 0.0 0.0 0.0
1980 8759 0.0 0.0 0.0
1981 8687 0.0 0.0 0.0
1982 8270 0.0 0.0 0.0
1983 7377 0.0 0.0 0.0
1984 24 0.0 0.0 0.0

For data sources see[5]

References