X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354100712000

Well Details

Well ID: 0354100712000
Loading map...
Location: 00/12-07-035-10W4/0
Location Alias: 00/12-07-35-10 W4M
Location Alias 2: 00/12-07-035-10 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 10
Section: 07
County/Municipality: County of Paintearth No. 18
Well Name: APACHE HAMIL IN 12-7-35-10
Operator Name: Koch Exploration Canada, Ltd.
License Number: 0032200
License Date: 1967-06-02
License Status: RecCertified
Spud Date: 1967-06-09
Final Drill Date: 1967-06-13
Well Total Depth: 951.00 m
Surface Hole Latitude: 51.991925
Surface Hole Longitude: -111.430260

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-06-02 Obtained License
1967-06-09 Lost Circulation Occurred
1967-06-13 Finished Drilling
1967-06-13 Well Mode changed to Drilled and Cased
1967-06-14 Drill Stem Test Performed
1967-06-14 Production Casing Operation Performed
1967-07-04 Perforation Treatment Performed - Jet Perforation
1967-07-13 Drill Stem Test Performed
1967-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-08-02 Perforation Treatment Performed - Fractured
1967-08-15 Well Began Injection
1967-08-15 Well Fluid changed to Water
1967-08-15 Well Type changed to Injection
1980-10-02 Perforation Treatment Performed - Jet Perforation
1980-10-06 Perforation Treatment Performed - Jet Perforation
1984-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-06-06 Perforation Treatment Performed - Bridge Plug No Cement Required
1984-06-06 Plug Back Performed
1984-06-06 Well Fluid changed to Water
1984-06-06 Well Log Performed
1984-06-06 Well Mode changed to Abandoned
1984-06-06 Well Type changed to Injection
1984-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-06-14 Plug Back Performed
1984-06-14 Well Abandoned
1984-06-14 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-07-04 Perforation 915.30 916.50 13
1967-08-02 Acid Treatment 915.30 916.50 0
1967-08-02 Fracture 915.30 916.50 0
1980-10-02 Perforation 391.00 396.00 13
1980-10-06 Perforation 224.50 229.50 13
1980-10-06 Perforation 200.00 205.00 13
1984-06-06 Bridge Plug, No Cement 902.00 902.00 0
1984-06-06 Packing Device Capped w/Cement 888.00 895.00 0
1984-06-14 Packing Device Capped w/Cement 183.00 190.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1967-06-09 Lost Circulation 40.50 40.50

For data sources see[6]

References