X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354101602000

Well Details

Well ID: 0354101602000
Loading map...
Location: 00/02-16-035-10W4/0
Location Alias: 00/02-16-35-10 W4M
Location Alias 2: 00/02-16-035-10 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 10
Section: 16
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 2-16-35-10
Operator Name: Karve Energy Inc.
License Number: 0035402
License Date: 1968-12-11
License Status: RecCertified
Spud Date: 1968-12-14
Final Drill Date: 1968-12-18
Well Total Depth: 910.40 m
Surface Hole Latitude: 51.999454
Surface Hole Longitude: -111.370898

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-12-11 Obtained License
1968-12-18 Finished Drilling
1968-12-18 Well Mode changed to Drilled and Cased
1968-12-19 Production Casing Operation Performed
1969-03-14 Perforation Treatment Performed - Jet Perforation
1969-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-20 Perforation Treatment Performed - Chemical Squeeze
1969-08-17 Well Began Injection
1969-08-17 Well Fluid changed to Water
1969-08-17 Well Type changed to Injection
1969-11-25 Perforation Treatment Performed - Fractured
1969-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-10-01 Well Fluid changed to Water
1982-10-01 Well Mode changed to Suspended
1982-10-01 Well Type changed to Injection
1992-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-01-20 Perforation Treatment Performed - Jet Perforation
1992-01-20 Plug Back Performed
1992-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-21 Perforation Treatment Performed - Remedial Casing
1992-01-21 Well Log Performed
1992-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-01-22 Perforation Treatment Performed - Jet Perforation
1992-01-22 Perforation Treatment Performed - Remedial Casing
1992-01-22 Well Fluid changed to Water
1992-01-22 Well Mode changed to Abandoned
1992-01-22 Well Type changed to Injection
1992-01-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-03-14 Perforation 887.60 888.20 13
1992-01-21 Remedial Casing Cementing 252.00 252.30 0
1992-01-22 Perforation 118.00 118.30 13
1992-01-22 Remedial Casing Cementing 118.00 118.30 0
1992-01-22 Packing Device Capped w/Cement 94.00 114.00 0
1969-03-14 Perforation 888.50 889.40 13
1969-03-20 Chemical Squeeze 887.60 889.40 0
1969-03-20 Acid Treatment 887.60 889.40 0
1969-11-25 Fracture 887.60 889.40 0
1969-12-22 Acid Treatment 887.60 889.40 0
1992-01-20 Packing Device Capped w/Cement 872.00 880.00 0
1992-01-20 Perforation 252.00 252.30 13
1992-01-21 Acid Treatment 252.00 252.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0

For data sources see[5]

References