X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354102106000

Well Details

Well ID: 0354102106000
Loading map...
Location: 00/06-21-035-10W4/0
Location Alias: 00/06-21-35-10 W4M
Location Alias 2: 00/06-21-035-10 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 10
Section: 21
County/Municipality: County of Paintearth No. 18
Well Name: TORO HZ PROVOST 6-21-35-10
Operator Name: Steelhead Petroleum Ltd.
License Number: 0476365
License Date: 2015-07-28
License Status: Amended
Spud Date: 2015-08-08
Final Drill Date: 2015-08-11
Well Total Depth: 2725.00 m
Surface Hole Latitude: 52.029334
Surface Hole Longitude: -111.358505

For data sources see[1][2]

Well History

Date Event
2015-07-28 Obtained License
2015-08-09 Direction Drilling Operation Performed - Deviate
2015-08-09 Surface Casing Operation Performed
2015-08-10 Direction Drilling Operation Performed - Horizontal
2015-08-10 Well Log Performed
2015-08-11 Finished Drilling
2015-08-11 Well Log Performed
2015-08-11 Well Mode changed to Drilled and Cased
2015-08-12 Production Casing Operation Performed
2015-08-12 Rig Released
2015-08-14 Well Log Performed
2015-08-31 Perforation Treatment Performed - Abrasa-Jet Perforation
2015-08-31 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-21 Well Began Production
2015-09-21 Well Fluid changed to Crude Oil
2015-09-21 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-08-09 660.90 Deviate (5 - 79 degrees)
2015-08-10 980.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-08-31 Multi-Stage Fracture 1039.30 1040.10 0
2015-08-31 Multi-Stage Fracture 1407.00 1407.80 0
2015-08-31 Multi-Stage Fracture 1447.90 1448.70 0
2015-08-31 Multi-Stage Fracture 1488.70 1489.50 0
2015-08-31 Multi-Stage Fracture 1529.50 1530.30 0
2015-08-31 Multi-Stage Fracture 1570.40 1571.20 0
2015-08-31 Multi-Stage Fracture 1611.20 1612.00 0
2015-08-31 Multi-Stage Fracture 1652.00 1652.80 0
2015-08-31 Multi-Stage Fracture 1692.90 1693.70 0
2015-08-31 Multi-Stage Fracture 1733.70 1734.50 0
2015-08-31 Multi-Stage Fracture 1774.60 1775.40 0
2015-08-31 Multi-Stage Fracture 1080.20 1081.00 0
2015-08-31 Multi-Stage Fracture 1815.40 1816.20 0
2015-08-31 Multi-Stage Fracture 1856.30 1857.10 0
2015-08-31 Hydra Jet Perforation 1897.20 1898.00 0
2015-08-31 Multi-Stage Fracture 1938.00 1938.80 0
2015-08-31 Multi-Stage Fracture 1978.90 1979.70 0
2015-08-31 Hydra Jet Perforation 2019.70 2020.50 0
2015-08-31 Multi-Stage Fracture 2060.60 2061.40 0
2015-08-31 Multi-Stage Fracture 2101.50 2102.30 0
2015-08-31 Multi-Stage Fracture 2142.30 2143.10 0
2015-08-31 Multi-Stage Fracture 2183.20 2184.00 0
2015-08-31 Multi-Stage Fracture 1121.00 1121.80 0
2015-08-31 Hydra Jet Perforation 2224.10 2224.90 0
2015-08-31 Multi-Stage Fracture 2264.90 2265.70 0
2015-08-31 Hydra Jet Perforation 2305.80 2306.60 0
2015-08-31 Multi-Stage Fracture 2346.70 2347.50 0
2015-08-31 Multi-Stage Fracture 2374.20 2375.00 0
2015-08-31 Multi-Stage Fracture 2415.00 2415.80 0
2015-08-31 Multi-Stage Fracture 2455.90 2456.70 0
2015-08-31 Multi-Stage Fracture 2496.80 2497.60 0
2015-08-31 Multi-Stage Fracture 2537.60 2538.40 0
2015-08-31 Multi-Stage Fracture 2578.50 2579.30 0
2015-08-31 Multi-Stage Fracture 1161.90 1162.70 0
2015-08-31 Multi-Stage Fracture 2619.30 2620.10 0
2015-08-31 Multi-Stage Fracture 2660.20 2661.00 0
2015-08-31 Multi-Stage Fracture 1202.70 1203.50 0
2015-08-31 Multi-Stage Fracture 1243.60 1244.40 0
2015-08-31 Multi-Stage Fracture 1284.40 1285.20 0
2015-08-31 Multi-Stage Fracture 1325.30 1326.10 0
2015-08-31 Multi-Stage Fracture 1366.20 1367.00 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-31 2015-08-31 896 1,649 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 100 N/A
Sand Canfrac Sands Ltd. silica crystalline 14808-60-7 100 11.9787 N/A
Aqucar 742 Millennium Stimulation Services Bactericide/Biocide Ethanol 64-17-5 100 0.1 N/A
Glutaraldehyde 111-30-8 100 0.1 N/A
Methanol 67-56-1 100 0.1 N/A
Quaternary ammonium compounds. benzyl-C12-16-alkyldimethyl 68424-85-1 100 0.1 N/A
Water 7732-18-5 100 0.1 N/A
CC2 Weatherford Clay Control Choline chloride 67-48-1 100 0.4 N/A
Water Not Available 100 0.4 N/A
NE2 Weatherford Demulsifier Methanol 67-56-1 100 0.1 N/A
Oxirane-methyl-polymer-ether-ethyl-hydroxymethyl-propanedio
l
52624-57-4 100 0.1 N/A
Propanetriol polymer with propylene oxide-ethylene oxide 9082-00-2 100 0.1 N/A
Water Not Available 100 0.1 N/A
FR5 SNF Friction Reducer 2-Propenoic acid. polymer with 2-propenamide. sodium salt 25987-30-8 100 0.13 N/A
Acrylamide (residual) 79-06-1 100 0.13 N/A
Alcohols. C11-14-iso-.C13-rich. ethoxylated 78330-21-9 100 0.13 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.13 N/A
Sodium acetate 126-96-5 100 0.13 N/A
Sorbitan monooleale 1338-43-8 100 0.13 N/A
Sorbitan monooleate. ethoxylated 9005-65-6 100 0.13 N/A
Water Not Available 100 0.13 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1396 0.0 0.0 0.0
2016 7437 0.0 0.0 0.0
2017 8446 0.0 0.0 0.0
2018 8593 0.0 0.0 0.0
2019 8632 0.0 0.0 0.0
2020 2064 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-08 No Incident Encountered 0.00 0.00

For data sources see[8]

References