X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354102515020

Well Details

Well ID: 0354102515020
Loading map...
Location: 02/15-25-035-10W4/0
Location Alias: 02/15-25-35-10 W4M
Location Alias 2: 02/15-25-035-10 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 10
Section: 25
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 15-25-35-10
Operator Name: Karve Energy Inc.
License Number: 0086273
License Date: 1980-10-10
License Status: Abandoned
Spud Date: 1980-10-10
Final Drill Date: 1980-10-13
Well Total Depth: 928.00 m
Surface Hole Latitude: 52.039501
Surface Hole Longitude: -111.296487

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-10-10 Obtained License
1980-10-13 Finished Drilling
1980-10-13 Production Casing Operation Performed
1980-10-13 Well Mode changed to Drilled and Cased
1980-11-20 Perforation Treatment Performed - Jet Perforation
1980-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-14 Well Began Injection
1981-01-14 Well Fluid changed to Water
1981-01-14 Well Type changed to Injection
1990-11-22 Well Log Performed
2006-04-26 Well Fluid changed to Water
2006-04-26 Well Mode changed to Suspended
2006-04-26 Well Type changed to Injection
2009-05-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-05-21 Plug Back Performed
2009-05-21 Well Fluid changed to Water
2009-05-21 Well Log Performed
2009-05-21 Well Mode changed to Abandoned Zone
2009-05-21 Well Type changed to Injection
2018-05-23 Well Abandoned
2018-05-23 Well Fluid changed to Water
2018-05-23 Well Mode changed to Abandoned
2018-05-23 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-20 Perforation 898.20 900.20 13
1980-11-21 Acid Treatment 898.20 900.20 0
2009-05-21 Packing Device Capped w/Cement 852.00 860.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0

For data sources see[5]

References