If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0354102604020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.026116,"lon":-111.31278,"icon":""}]} |
| Location: 02/04-26-035-10W4/0 | |
| Location Alias: 02/04-26-35-10 W4M | |
| Location Alias 2: 02/04-26-035-10 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 035 | |
| Meridian: 4 | |
| Range: 10 | |
| Section: 26 | |
| County/Municipality: County of Paintearth No. 18 | |
| Well Name: KARVE 102 HZ PROVOST 4-26-35-10 | |
| Operator Name: Karve Energy Inc. | |
| License Number: 0492571 | |
| License Date: 2018-12-04 | |
| License Status: Issued | |
| Spud Date: 2019-06-12 | |
| Final Drill Date: 2019-07-10 | |
| Well Total Depth: 2232.00 m | |
| Surface Hole Latitude: 52.026116 | |
| Surface Hole Longitude: -111.312780 |
| Date | Event |
|---|---|
| 2018-12-04 | Obtained License |
| 2019-06-12 | Set Surface |
| 2019-06-13 | Surface Casing Operation Performed |
| 2019-07-09 | Direction Drilling Operation Performed - Deviate |
| 2019-07-09 | Direction Drilling Operation Performed - Horizontal |
| 2019-07-09 | Drill To LD |
| 2019-07-10 | Finished Drilling |
| 2019-07-10 | Well Log Performed |
| 2019-07-10 | Well Mode changed to Drilled and Cased |
| 2019-07-11 | Production Casing Operation Performed |
| 2019-07-11 | Rig Released |
| 2019-07-11 | Well Log Performed |
| 2019-08-02 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-08-13 | Well Began Production |
| 2019-08-13 | Well Fluid changed to Crude Oil |
| 2019-08-13 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2019-07-09 | Ensign Drilling Inc. | 348 | Drill To LD | |
| 2019-06-12 | Predator Drilling Inc. | 27 | Set Surface |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2019-07-09 | 507.60 | Deviate (5 - 79 degrees) |
| 2019-07-09 | 1065.90 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2019-08-02 | Multi-Stage Fracture | 1955.90 | 1956.00 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1639.20 | 1639.30 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1581.20 | 1581.30 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1546.20 | 1546.30 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1510.90 | 1511.00 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1464.30 | 1464.40 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1440.90 | 1441.00 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1394.90 | 1395.00 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1371.20 | 1371.30 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1336.50 | 1336.60 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1255.30 | 1255.40 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1920.80 | 1920.90 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1231.50 | 1231.60 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1208.00 | 1208.10 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1184.20 | 1184.30 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1160.50 | 1160.60 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1125.30 | 1125.40 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1090.00 | 1090.10 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1874.00 | 1874.10 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1850.20 | 1850.30 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1826.50 | 1826.60 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1779.90 | 1780.00 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1744.70 | 1744.80 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1721.40 | 1721.50 | 0 |
| 2019-08-02 | Multi-Stage Fracture | 1697.50 | 1697.60 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2019-08-02 | 2019-08-02 | 890 | 827 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 71.1424 | N/A | |||
| 16/30 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 28.057 | N/A | ||
| Secure BIO-10B (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0111 | N/A | |
| Methyl Alcohol | 67-56-1 | 100 | 0.0111 | N/A | ||||
| SBE-2 (Breaker) | Step Energy Services | Breaker | Non-Hazardous Ingredients | Not Available | 100 | 0.0666 | N/A | |
| Sodium chloride | 7647-14-5 | 100 | 0.0666 | N/A | ||||
| SCS-1 (Clay Control) | Step Energy Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.0994 | N/A | |
| Non-Hazardous Ingredients | Not Available | 100 | 0.0994 | N/A | ||||
| SBX-2 (Crosslinker) | Step Energy Services | Crosslinker | Proprietary | Trade Secret | 100 | 0.1054 | N/A | |
| Water | 7732-18-5 | 100 | 0.1054 | N/A | ||||
| SFR-106 (Friction Reducer) | Step Energy Services | Friction Reducer | Ethoxylated Alcohol | 68131-39-5 | 100 | 0.0472 | N/A | |
| Non-Hazardous Ingredients | Not Available | 100 | 0.0472 | N/A | ||||
| Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.0472 | N/A | ||||
| SWG-101L (Gellant) | Step Energy Services | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.3363 | N/A | |
| Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.3363 | N/A | ||||
| SNE-2 (Non-Emulsifier) | Step Energy Services | Surfactant | 2-Ethylhexanol distillation residue | 68609-68-7 | 100 | 0.1342 | N/A | |
| Dodecylbenzene Sulfonic Acid | 27176-87-0 | 100 | 0.1342 | N/A | ||||
| Methanol | 67-56-1 | 100 | 0.1342 | N/A | ||||
| Monoethanolamine | 141-43-5 | 100 | 0.1342 | N/A | ||||
| Oxirane. methyl-. polymer | 11/6/9003 | 100 | 0.1342 | N/A | ||||
| Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- | 9043-30-5 | 100 | 0.1342 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.1342 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2019-07-22 | 2019-07-22 | Municipal Water | 447 |
| 2019-07-22 | 2019-07-22 | Municipal Water | 234 |
| 2019-07-22 | 2019-07-22 | Central Water Distribution Facility | 120 |
| 2019-07-22 | 2019-07-22 | Central Water Distribution Facility | 70 |
| 2019-07-22 | 2019-07-22 | Central Water Distribution Facility | 110 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2019 | 3380 | 0.0 | 0.0 | 0.0 |
| 2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-07-11 | No Incident Encountered | 0.00 | 0.00 |
| 2019-08-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]