X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354102612020

Well Details

Well ID: 0354102612020
Loading map...
Location: 02/12-26-035-10W4/0
Location Alias: 02/12-26-35-10 W4M
Location Alias 2: 02/12-26-035-10 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 10
Section: 26
County/Municipality: County of Paintearth No. 18
Well Name: CENERGY PROVOST 12-26-35-10
Operator Name: Cenergy Resources Limited
License Number: 0034806
License Date: 1968-09-16
License Status: RecCertified
Spud Date: 1968-09-18
Final Drill Date: 1968-09-20
Well Total Depth: 909.80 m
Surface Hole Latitude: 52.035863
Surface Hole Longitude: -111.334083

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-09-16 Obtained License
1968-09-20 Finished Drilling
1968-09-20 Well Mode changed to Drilled and Cased
1968-09-21 Production Casing Operation Performed
1968-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-12 Perforation Treatment Performed - Fractured
1968-10-12 Perforation Treatment Performed - Jet Perforation
1968-10-30 Well Began Injection
1968-10-30 Well Fluid changed to Water
1968-10-30 Well Type changed to Injection
1990-10-01 Well Fluid changed to Water
1990-10-01 Well Mode changed to Suspended
1990-10-01 Well Type changed to Injection
1994-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-10 Perforation Treatment Performed - Jet Perforation
1994-09-10 Perforation Treatment Performed - Remedial Casing
1994-09-10 Plug Back Performed
1994-09-10 Well Fluid changed to Water
1994-09-10 Well Mode changed to Abandoned
1994-09-10 Well Type changed to Injection
1994-09-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-10-12 Perforation 886.70 887.90 7
1968-10-12 Acid Treatment 886.70 887.90 0
1968-10-12 Fracture 886.70 887.90 0
1994-09-10 Packing Device Capped w/Cement 725.00 733.00 0
1994-09-10 Perforation 246.00 247.00 10
1994-09-10 Remedial Casing Cementing 246.00 247.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0

For data sources see[5]

References