X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354103215000

Well Details

Well ID: 0354103215000
Loading map...
Location: 00/15-32-035-10W4/0
Location Alias: 00/15-32-35-10 W4M
Location Alias 2: 00/15-32-035-10 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 10
Section: 32
County/Municipality: County of Paintearth No. 18
Well Name: TORO HZ PROVOST 15-32-35-10
Operator Name: Steelhead Petroleum Ltd.
License Number: 0475930
License Date: 2015-06-29
License Status: Issued
Spud Date: 2015-07-10
Final Drill Date: 2015-07-13
Well Total Depth: 2252.00 m
Surface Hole Latitude: 52.061058
Surface Hole Longitude: -111.376691

For data sources see[1][2]

Well History

Date Event
2015-06-29 Obtained License
2015-07-10 Surface Casing Operation Performed
2015-07-11 Direction Drilling Operation Performed - Deviate
2015-07-11 Direction Drilling Operation Performed - Horizontal
2015-07-11 Well Log Performed
2015-07-13 Finished Drilling
2015-07-13 Well Log Performed
2015-07-13 Well Mode changed to Drilled and Cased
2015-07-14 Production Casing Operation Performed
2015-07-14 Rig Released
2015-07-22 Well Log Performed
2015-07-28 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-17 Well Began Production
2015-08-17 Well Fluid changed to Crude Oil
2015-08-17 Well Mode changed to Pumping
2016-04-01 Well Fluid changed to Crude Oil
2016-04-01 Well Mode changed to Suspended
2017-02-01 Well Fluid changed to Crude Oil
2017-02-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-07-10 Ensign Drilling Inc. 348 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-07-11 690.50 Deviate (5 - 79 degrees)
2015-07-11 995.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-07-28 Multi-Stage Fracture 2238.20 2238.50 0
2015-07-28 Multi-Stage Fracture 1885.80 1886.10 0
2015-07-28 Multi-Stage Fracture 1858.70 1859.00 0
2015-07-28 Multi-Stage Fracture 1818.10 1818.40 0
2015-07-28 Multi-Stage Fracture 1777.40 1777.70 0
2015-07-28 Multi-Stage Fracture 1736.80 1737.10 0
2015-07-28 Multi-Stage Fracture 1696.10 1696.40 0
2015-07-28 Multi-Stage Fracture 1655.50 1655.80 0
2015-07-28 Multi-Stage Fracture 1614.80 1615.10 0
2015-07-28 Multi-Stage Fracture 1574.20 1574.50 0
2015-07-28 Multi-Stage Fracture 1533.60 1533.90 0
2015-07-28 Multi-Stage Fracture 2197.50 2197.80 0
2015-07-28 Multi-Stage Fracture 1493.00 1493.30 0
2015-07-28 Multi-Stage Fracture 1452.40 1452.70 0
2015-07-28 Multi-Stage Fracture 1411.80 1412.10 0
2015-07-28 Multi-Stage Fracture 1371.20 1371.50 0
2015-07-28 Multi-Stage Fracture 1330.70 1331.00 0
2015-07-28 Multi-Stage Fracture 1290.20 1290.50 0
2015-07-28 Multi-Stage Fracture 1249.50 1249.80 0
2015-07-28 Multi-Stage Fracture 1208.90 1209.20 0
2015-07-28 Multi-Stage Fracture 1168.20 1168.50 0
2015-07-28 Multi-Stage Fracture 1127.60 1127.90 0
2015-07-28 Multi-Stage Fracture 2156.90 2157.20 0
2015-07-28 Multi-Stage Fracture 1087.00 1087.30 0
2015-07-28 Multi-Stage Fracture 1046.40 1046.70 0
2015-07-28 Multi-Stage Fracture 2116.30 2116.60 0
2015-07-28 Multi-Stage Fracture 2075.60 2075.90 0
2015-07-28 Multi-Stage Fracture 2035.00 2035.30 0
2015-07-28 Multi-Stage Fracture 1994.40 1994.70 0
2015-07-28 Multi-Stage Fracture 1953.60 1953.90 0
2015-07-28 Multi-Stage Fracture 1913.00 1913.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-07-28 2015-07-28 895 1,373 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 100 N/A
Sand Canfrac Sands Ltd. silica crystalline 14808-60-7 100 12.3099 N/A
Myacide 2K7 BASF Bactericide/Biocide Bronopol 52-51-7 100 0.005 N/A
CC2 Weatherford Clay Control Choline chloride 67-48-1 100 0.4 N/A
Water Not Available 100 0.4 N/A
NE2 Weatherford Demulsifier Methanol 67-56-1 100 0.1 N/A
Oxirane-methyl-polymer-ether-ethyl-hydroxymethyl-propanedio
l
52624-57-4 100 0.1 N/A
Propanetriol polymer with propylene oxide-ethylene oxide 9082-00-2 100 0.1 N/A
Water Not Available 100 0.1 N/A
FR5 SNF Friction Reducer 2-Propenoic acid. polymer with 2-propenamide. sodium salt 25987-30-8 100 0.13 N/A
Acrylamide (residual) 79-06-1 100 0.13 N/A
Alcohols. C11-14-iso-.C13-rich. ethoxylated 78330-21-9 100 0.13 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.13 N/A
Sodium acetate 126-96-5 100 0.13 N/A
Sorbitan monooleale 1338-43-8 100 0.13 N/A
Sorbitan monooleate. ethoxylated 9005-65-6 100 0.13 N/A
Water Not Available 100 0.13 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-07-28 2015-07-28 Municipal Water 1409

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1598 0.0 0.0 0.0
2016 793 0.0 0.0 0.0
2017 7377 0.0 0.0 0.0
2018 8389 0.0 0.0 0.0
2019 8609 0.0 0.0 0.0
2020 2112 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References