If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0354110111000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.978845,"lon":-111.45101,"icon":""}]} |
| Location: 00/11-01-035-11W4/0 | |
| Location Alias: 00/11-01-35-11 W4M | |
| Location Alias 2: 00/11-01-035-11 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 035 | |
| Meridian: 4 | |
| Range: 11 | |
| Section: 01 | |
| County/Municipality: County of Paintearth No. 18 | |
| Well Name: ANDEX ET AL PROVO 11-1-35-11 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0092089 | |
| License Date: 1981-09-03 | |
| License Status: RecCertified | |
| Spud Date: 1981-09-13 | |
| Final Drill Date: 1981-09-18 | |
| Well Total Depth: 1063.70 m | |
| Surface Hole Latitude: 51.978845 | |
| Surface Hole Longitude: -111.451010 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1981-09-03 | Obtained License |
| 1981-09-18 | Finished Drilling |
| 1981-09-18 | Well Log Performed |
| 1981-09-19 | Drill Stem Test Performed |
| 1981-09-20 | Production Casing Operation Performed |
| 1981-09-23 | Perforation Treatment Performed - Jet Perforation |
| 1981-09-24 | Well Mode changed to Drilled and Cased |
| 1982-05-01 | Well Began Production |
| 1982-05-01 | Well Fluid changed to Gas |
| 1982-05-01 | Well Mode changed to Flowing |
| 1983-04-30 | Perforation Treatment Performed - Jet Perforation |
| 1988-01-01 | Well Fluid changed to Gas |
| 1988-01-01 | Well Mode changed to Suspended |
| 1989-09-26 | Well Log Performed |
| 1989-09-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1989-09-27 | Plug Back Performed |
| 1989-09-27 | Well Fluid changed to Gas |
| 1989-09-27 | Well Mode changed to Abandoned |
| 1989-11-20 | Well Log Performed |
| 1990-02-26 | Perforation Treatment Performed - Jet Perforation |
| 1990-02-26 | Perforation Treatment Performed - Remedial Casing |
| 1990-02-26 | Well Log Performed |
| 1990-09-27 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1981-09-23 | Perforation | 895.00 | 897.50 | 13 |
| 1983-04-30 | Perforation | 940.00 | 943.00 | 13 |
| 1989-09-27 | Packing Device Capped w/Cement | 881.00 | 889.00 | 0 |
| 1990-02-26 | Perforation | 210.00 | 211.00 | 7 |
| 1990-02-26 | Remedial Casing Cementing | 210.00 | 211.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1982 | 5712 | 0.0 | 0.0 | 0.0 |
| 1983 | 8711 | 0.0 | 0.0 | 0.0 |
| 1984 | 8712 | 0.0 | 0.0 | 0.0 |
| 1985 | 8301 | 0.0 | 0.0 | 0.0 |
| 1986 | 8759 | 0.0 | 0.0 | 0.0 |
| 1987 | 4343 | 0.0 | 0.0 | 0.0 |
For data sources see[5]