X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354110111000

Well Details

Well ID: 0354110111000
Loading map...
Location: 00/11-01-035-11W4/0
Location Alias: 00/11-01-35-11 W4M
Location Alias 2: 00/11-01-035-11 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 11
Section: 01
County/Municipality: County of Paintearth No. 18
Well Name: ANDEX ET AL PROVO 11-1-35-11
Operator Name: Canadian Natural Resources Limited
License Number: 0092089
License Date: 1981-09-03
License Status: RecCertified
Spud Date: 1981-09-13
Final Drill Date: 1981-09-18
Well Total Depth: 1063.70 m
Surface Hole Latitude: 51.978845
Surface Hole Longitude: -111.451010

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-09-03 Obtained License
1981-09-18 Finished Drilling
1981-09-18 Well Log Performed
1981-09-19 Drill Stem Test Performed
1981-09-20 Production Casing Operation Performed
1981-09-23 Perforation Treatment Performed - Jet Perforation
1981-09-24 Well Mode changed to Drilled and Cased
1982-05-01 Well Began Production
1982-05-01 Well Fluid changed to Gas
1982-05-01 Well Mode changed to Flowing
1983-04-30 Perforation Treatment Performed - Jet Perforation
1988-01-01 Well Fluid changed to Gas
1988-01-01 Well Mode changed to Suspended
1989-09-26 Well Log Performed
1989-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-09-27 Plug Back Performed
1989-09-27 Well Fluid changed to Gas
1989-09-27 Well Mode changed to Abandoned
1989-11-20 Well Log Performed
1990-02-26 Perforation Treatment Performed - Jet Perforation
1990-02-26 Perforation Treatment Performed - Remedial Casing
1990-02-26 Well Log Performed
1990-09-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-09-23 Perforation 895.00 897.50 13
1983-04-30 Perforation 940.00 943.00 13
1989-09-27 Packing Device Capped w/Cement 881.00 889.00 0
1990-02-26 Perforation 210.00 211.00 7
1990-02-26 Remedial Casing Cementing 210.00 211.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 5712 0.0 0.0 0.0
1983 8711 0.0 0.0 0.0
1984 8712 0.0 0.0 0.0
1985 8301 0.0 0.0 0.0
1986 8759 0.0 0.0 0.0
1987 4343 0.0 0.0 0.0

For data sources see[5]

References