X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354110202000

Well Details

Well ID: 0354110202000
Loading map...
Location: 00/02-02-035-11W4/0
Location Alias: 00/02-02-35-11 W4M
Location Alias 2: 00/02-02-035-11 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 11
Section: 02
County/Municipality: County of Paintearth No. 18
Well Name: ANDEX ET AL PROVO 2-2-35-11
Operator Name: Canadian Natural Resources Limited
License Number: 0035288
License Date: 1968-11-26
License Status: RecCertified
Spud Date: 1969-01-07
Final Drill Date: 1969-01-10
Well Total Depth: 923.20 m
Surface Hole Latitude: 51.970827
Surface Hole Longitude: -111.465551

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-11-26 Obtained License
1969-01-10 Finished Drilling
1969-01-10 Well Mode changed to Drilled and Cased
1969-01-11 Production Casing Operation Performed
1969-11-07 Perforation Treatment Performed - Jet Perforation
1969-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-02-06 Well Began Injection
1970-02-06 Well Fluid changed to Water
1970-02-06 Well Type changed to Injection
1985-02-14 Well Fluid changed to Water
1985-02-14 Well Mode changed to Suspended
1985-02-14 Well Type changed to Injection
1989-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-09-28 Perforation Treatment Performed - Jet Perforation
1989-09-28 Plug Back Performed
1989-09-28 Well Fluid changed to Water
1989-09-28 Well Log Performed
1989-09-28 Well Mode changed to Abandoned
1989-09-28 Well Type changed to Injection
1989-09-29 Perforation Treatment Performed - Remedial Casing
1990-02-28 Perforation Treatment Performed - Cement Plug
1990-02-28 Plug Back Performed
1990-02-28 Well Log Performed
1990-09-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-11-07 Perforation 904.60 905.90 3
1969-11-08 Acid Treatment 904.60 905.90 0
1989-09-28 Packing Device Capped w/Cement 890.00 898.00 0
1989-09-28 Perforation 300.00 301.00 13
1989-09-29 Remedial Casing Cementing 300.00 301.00 0
1990-02-28 Cement Plug 0.10 215.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0

For data sources see[5]

References